{"id":161778,"date":"2022-10-27T13:51:43","date_gmt":"2022-10-27T10:51:43","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=161778"},"modified":"2022-10-27T13:51:43","modified_gmt":"2022-10-27T10:51:43","slug":"akkuyu-ngs-sahasinda-ekipmanlarin-kurulumu-devam-ediyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngs-sahasinda-ekipmanlarin-kurulumu-devam-ediyor\/","title":{"rendered":"(Turkish) Akkuyu NGS Sahas\u0131nda Ekipmanlar\u0131n Kurulumu Devam Ediyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/161778\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali (NGS) sahas\u0131nda ekipmanlar\u0131n kurulumu belirlenen takvime g\u00f6re yap\u0131lmaya devam ederken sahadaki 1\u2019inci \u00fcnitenin reakt\u00f6r binas\u0131n\u0131n 1&#8217;incil devresinin ana ekipman\u0131n\u0131 olu\u015fturan bas\u0131n\u00e7 kompansat\u00f6r\u00fcn\u00fcn montaj\u0131 da tamamlanm\u0131\u015f oldu.<\/h2>\n<p><strong>Bas\u0131n\u00e7 kompansat\u00f6r\u00fc<\/strong>, halihaz\u0131rda <strong>kurulu g\u00fcvenlik sistemlerinin<\/strong> boru hatlar\u0131n\u0131n y\u0131kanmas\u0131 ve reakt\u00f6re ba\u011fl\u0131 i\u015fletim sistemlerinin normal \u00e7al\u0131\u015fmas\u0131 gibi sistemlerin a\u00e7\u0131k bir reakt\u00f6re aktar\u0131lmas\u0131n\u0131n ilk <img loading=\"lazy\" class=\"alignright wp-image-161780\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/02-1.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/02-1.jpg 584w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/02-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/02-1-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/02-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/02-1-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>a\u015famas\u0131nda yer al\u0131yor. Bu ekipman\u0131n kurulumundan \u00f6nce, <strong>\u00f6zel g\u00f6m\u00fcl\u00fc par\u00e7alar\u0131n montaj\u0131, betonlama<\/strong> ve <strong>g\u00f6m\u00fcl\u00fc par\u00e7alara destek montaj\u0131<\/strong> \u00e7al\u0131\u015fmalar\u0131 yap\u0131ld\u0131.<\/p>\n<p>Akkuyu N\u00fckleer A.\u015e Genel M\u00fcd\u00fcr Birinci Yard\u0131mc\u0131s\u0131 ve N\u00fckleer G\u00fc\u00e7 Santrali (NGS) Yap\u0131 \u0130\u015fleri Direkt\u00f6r\u00fc Sergey Butckikh konuya ili\u015fkin a\u00e7\u0131klamas\u0131nda \u015funlar\u0131 s\u00f6yledi: <em>\u201cAkkuyu NGS&#8217;nin ilk g\u00fc\u00e7 \u00fcnitesindeki bir di\u011fer \u00f6nemli \u00e7al\u0131\u015fma a\u015famas\u0131, <strong>bas\u0131n\u00e7 kompansat\u00f6r\u00fcn\u00fcn tasar\u0131m konumuna<\/strong> yerle\u015ftirilmesidir. <strong>Kompansat\u00f6r<\/strong>,<strong> \u201cOpen Top\u201d teknolojisi<\/strong> kullan\u0131larak, yani reakt\u00f6r binas\u0131n\u0131n \u00fcst\u00fc a\u00e7\u0131k haldeyken kuruldu. \u0130\u00e7 koruma kabu\u011funun alt\u0131nc\u0131 katman\u0131n\u0131n kurulumu tamamlad\u0131ktan sonra, geriye sadece reakt\u00f6r kubbesini monte etmek kal\u0131yor. B\u00f6ylece,<strong> in\u015faat<\/strong> ve <strong>montaj i\u015flerini<\/strong> fiilen tamamlay\u0131p <strong>ekipmanlar\u0131 devreye alma a\u015famas\u0131na<\/strong> ge\u00e7ece\u011fiz.\u201d<\/em><\/p>\n<p><strong>12,91 metre<\/strong> y\u00fcksekli\u011fe, <strong>3,33 metre<\/strong> \u00e7apa ve<strong> 187,4 ton<\/strong> a\u011f\u0131rl\u0131\u011fa sahip <strong>bas\u0131n\u00e7 kompansat\u00f6r\u00fc<\/strong>, \u00e7e\u015fitli ko\u015fullarda 1&#8217;incil devrede <strong>bas\u0131n\u00e7 olu\u015fturmak<\/strong> ve <strong>bas\u0131nc\u0131 korumak<\/strong> i\u00e7in tasarland\u0131.<\/p>\n<p><strong>Akkuyu NGS<\/strong> sahas\u0131nda 2022 y\u0131l\u0131 sonuna kadar <strong>ilk g\u00fc\u00e7 \u00fcnitesine ait<\/strong> koruma alan\u0131n\u0131n ve <strong>reakt\u00f6r kab\u0131n\u0131n \u00fczerindeki kubbenin kapat\u0131lmas\u0131<\/strong> ve <strong>kutup vincinin devreye al\u0131nmas\u0131<\/strong> i\u00e7in \u00e7al\u0131\u015fmalar planlan\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali (NGS) sahas\u0131nda ekipmanlar\u0131n kurulumu belirlenen takvime g\u00f6re yap\u0131lmaya devam ederken sahadaki 1\u2019inci \u00fcnitenin reakt\u00f6r binas\u0131n\u0131n 1&#8217;incil devresinin ana [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":161781,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,105758,34930],"views":49,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/161778"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=161778"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/161778\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/161781"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=161778"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=161778"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=161778"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}