{"id":161666,"date":"2022-10-26T09:56:25","date_gmt":"2022-10-26T06:56:25","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=161666"},"modified":"2022-10-26T09:56:25","modified_gmt":"2022-10-26T06:56:25","slug":"01-burda-avm-ges-ile-enerjisinin-yuzde-10-unu-karsiliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/01-burda-avm-ges-ile-enerjisinin-yuzde-10-unu-karsiliyor\/","title":{"rendered":"(Turkish) &#8217;01 Burda AVM&#8217; GES ile Enerjisinin %10&#8217;unu Kar\u015f\u0131l\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/161666\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>01 Burda AVM\u2019nin \u00e7at\u0131s\u0131na kurdu\u011fu G\u00fcne\u015f Enerjisi Santrali\u2019ni (GES) tamamlad\u0131. 1.212 m<sup>2<\/sup>\u2019lik bir alanda 1.996 adet 430 Wp fotovoltaik panelle kurulan ve 1 mWp g\u00fcce sahip sistem, \u00fcretti\u011fi enerjiyle 01 Burda AVM\u2019nin elektrik t\u00fcketiminin % 10\u2019unu kar\u015f\u0131layabiliyor.<\/strong><\/h2>\n<p><img loading=\"lazy\" class=\"alignright wp-image-161670\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/01-burda-avm-ges-02.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/01-burda-avm-ges-02.jpg 541w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/01-burda-avm-ges-02-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/01-burda-avm-ges-02-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/01-burda-avm-ges-02-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Esas Gayrimenkul, <strong>Adana\u2019da<\/strong> yer alan 01 Burda AVM\u2019nin \u00e7at\u0131s\u0131na <strong>\u201cYap \u0130\u015flet\u201d modeliyle<\/strong> kurdu\u011fu <strong>G\u00fcne\u015f Enerjisi Santrali\u2019ni (GES)<\/strong> devreye ald\u0131. \u015eirketin s\u00fcrd\u00fcr\u00fclebilirlik hedefleri do\u011frultusunda ger\u00e7ekle\u015ftirilen proje kapsam\u0131nda, 01 Burda AVM\u2019nin \u00e7at\u0131s\u0131nda<strong> 1.212 m2<\/strong>\u2019lik bir alanda <strong>1.996<\/strong> adet <strong>430 Wp<\/strong> fotovoltaik panelle <strong>1 mWp<\/strong> g\u00fcce sahip bir sistem kurulurken sistemin \u00fcretti\u011fi enerjiyle, al\u0131\u015fveri\u015f merkezinin elektrik t\u00fcketiminin<strong> % 10<\/strong>\u2019u kar\u015f\u0131lanabiliyor.<\/p>\n<p>S\u00fcrd\u00fcr\u00fclebilir bir gelece\u011fe katk\u0131 sa\u011flarken sekt\u00f6re ilham vermeyi de hedefleyen <strong>Esas Gayrimenkul<\/strong>; 17 B<strong>urda, 39 Burda, 01 Burda ve 41 Burda AVM<\/strong>\u2019lerinin toplam ortak alan t\u00fcketiminin <strong>% 72<\/strong>\u2019sini <strong>IREC sertifikal\u0131 yenilenebilir kaynaklardan<\/strong> sa\u011fl\u0131yor. Esas Gayrimenkul, 2030 y\u0131l\u0131na kadar bu oran\u0131 portf\u00f6y genelinde %100\u2019e \u00e7\u0131karmay\u0131 hedefliyor. Ad\u0131 ge\u00e7en <strong>4 AVM<\/strong>\u2019nin tamam\u0131nda \u00fcretilen enerji yakla\u015f\u0131k<strong> 2.140<\/strong> evin t\u00fcketti\u011fi enerjiyi kar\u015f\u0131layabilecek seviyede olup 5.128 ton karbonun do\u011faya sal\u0131m\u0131n\u0131n\u0131 da engelliyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 01 Burda AVM\u2019nin \u00e7at\u0131s\u0131na kurdu\u011fu G\u00fcne\u015f Enerjisi Santrali\u2019ni (GES) tamamlad\u0131. 1.212 m2\u2019lik bir alanda 1.996 adet 430 Wp fotovoltaik panelle kurulan ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":161671,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[105734,3272,80750,18,102798,45418,2206,78057,100169],"views":118,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/161666"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=161666"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/161666\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/161671"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=161666"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=161666"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=161666"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}