{"id":161635,"date":"2022-10-25T15:25:26","date_gmt":"2022-10-25T12:25:26","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=161635"},"modified":"2022-10-25T15:29:05","modified_gmt":"2022-10-25T12:29:05","slug":"aksa-enerji-den-18-gw-lik-depolama-basvurusu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aksa-enerji-den-18-gw-lik-depolama-basvurusu\/","title":{"rendered":"(Turkish) Aksa Enerji&#8217;den 1,8 GW\u2019l\u0131k Depolama Ba\u015fvurusu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/161635\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><img loading=\"lazy\" class=\"alignright wp-image-161638\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/30658.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/30658.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/30658-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/30658-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/30658-67x50.jpg 67w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Aksa Enerji toplam kurulu g\u00fcc\u00fc 1,8 GW\u2019\u0131 ge\u00e7ecek olan 13 elektrik depolama tesisi i\u00e7in lisans ba\u015fvurusu yapt\u0131\u011f\u0131n\u0131 belirtilirken Kamuyu Ayd\u0131nlatma Platformu (KAP) \u00fczerinde yay\u0131nlanan a\u00e7\u0131klamaya g\u00f6re ba\u015fvurular \u015firketin %100 ba\u011fl\u0131 ortakl\u0131\u011f\u0131 Aksa Aksen Enerji taraf\u0131ndan yap\u0131ld\u0131.<\/h2>\n<p>Ba\u015fvurular \u00e7er\u00e7evesinde, toplam <strong>1.813 MWe<\/strong> yeni <strong>kurulu g\u00fc\u00e7 depolama kapasitesi<\/strong>nin olu\u015fturulmas\u0131 planland\u0131\u011f\u0131 ifade edildi.<\/p>\n<p><strong>Elektrik Piyasas\u0131 Kanunu<\/strong>&#8216;nda ge\u00e7ti\u011fimiz y\u0131l\u0131n Temmuz ay\u0131nda yap\u0131lan de\u011fi\u015fiklikle <strong>elektrik depolama<\/strong> yat\u0131r\u0131m\u0131 yapmay\u0131 taahh\u00fct eden<strong> enerji yat\u0131r\u0131mc\u0131lar\u0131n\u0131n<\/strong>, bu yat\u0131r\u0131m\u0131n kurulu g\u00fcc\u00fcne denk \u015fekilde yapmak istedikleri<strong> r\u00fczgar ve(ya) g\u00fcne\u015f enerjisi<\/strong> santrali yat\u0131r\u0131mlar\u0131na <strong>yar\u0131\u015fma s\u00fcrecinden muaf<\/strong> olarak <strong>lisans alma<\/strong> hakk\u0131 tan\u0131nm\u0131\u015ft\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Aksa Enerji toplam kurulu g\u00fcc\u00fc 1,8 GW\u2019\u0131 ge\u00e7ecek olan 13 elektrik depolama tesisi i\u00e7in lisans ba\u015fvurusu yapt\u0131\u011f\u0131n\u0131 belirtilirken Kamuyu Ayd\u0131nlatma Platformu (KAP) [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":161638,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[105733,1571,4991,32163,44584,1588,18204,60520,5744],"views":104,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/161635"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=161635"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/161635\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/161638"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=161635"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=161635"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=161635"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}