{"id":161404,"date":"2022-10-20T10:57:29","date_gmt":"2022-10-20T07:57:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=161404"},"modified":"2022-10-20T11:01:59","modified_gmt":"2022-10-20T08:01:59","slug":"sedas-in-gebze-deki-yatirim-calismalari-tum-hiziyla-devam-ediyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sedas-in-gebze-deki-yatirim-calismalari-tum-hiziyla-devam-ediyor\/","title":{"rendered":"(Turkish) &#8217;SEDA\u015e&#8217;\u0131n Gebze&#8217;deki Yat\u0131r\u0131m \u00c7al\u0131\u015fmalar\u0131 T\u00fcm H\u0131z\u0131yla Devam Ediyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/161404\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2 class=\"v1MsoNormal\">Sakarya Elektrik Da\u011f\u0131t\u0131m (SEDA\u015e), 20 bin kilometrekarelik faaliyet b\u00f6lgesindeki yat\u0131r\u0131m projelerini h\u0131zla tamamlamaya devam ederken b\u00f6lgede her ge\u00e7en g\u00fcn artan n\u00fcfus art\u0131\u015f\u0131na y\u00f6nelik planlamalar yap\u0131larak geni\u015f kapsaml\u0131 altyap\u0131, bak\u0131m, yenileme ve onar\u0131m \u00e7al\u0131\u015fmalar\u0131 ile kentin y\u00fckselen enerji ihtiyac\u0131 h\u0131z kesmeden kar\u015f\u0131lan\u0131yor.<\/h2>\n<p class=\"v1MsoNormal\">\u0130l\u00e7e merkezinin <strong>k\u00f6ylerin tamam\u0131nda<\/strong> hayata ge\u00e7irilen \u00e7al\u0131\u015fmalar sayesinde <strong>m\u00fc\u015fteri memnuniyeti \u00fcst seviyelere<\/strong> ta\u015f\u0131nd\u0131.<\/p>\n<h3 class=\"v1MsoNormal\"><b>Gebze&#8217;de 100 km&#8217;lik yer alt\u0131 enerji hatt\u0131 \u00e7ekildi<\/b><\/h3>\n<p class=\"v1MsoNormal\">SEDA\u015e ekipleri, <strong>Gebze&#8217;de<\/strong> bir y\u0131lda direk, kabin, armat\u00fcr, \u015febeke ve trafo postas\u0131 montajlar\u0131 ile ek tesis <img loading=\"lazy\" class=\"alignright wp-image-161406\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/sedasin-gebzedeki-yatirim-calismalari-tum-hiziyla-devam-ediyor-2.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/sedasin-gebzedeki-yatirim-calismalari-tum-hiziyla-devam-ediyor-2.jpg 882w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/sedasin-gebzedeki-yatirim-calismalari-tum-hiziyla-devam-ediyor-2-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/sedasin-gebzedeki-yatirim-calismalari-tum-hiziyla-devam-ediyor-2-768x511.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/sedasin-gebzedeki-yatirim-calismalari-tum-hiziyla-devam-ediyor-2-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/sedasin-gebzedeki-yatirim-calismalari-tum-hiziyla-devam-ediyor-2-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/10\/sedasin-gebzedeki-yatirim-calismalari-tum-hiziyla-devam-ediyor-2-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>\u00e7al\u0131\u015fmalar\u0131 ger\u00e7ekle\u015ftirdi. G\u00fcn\u00fcn her saati g\u00f6rev ba\u015f\u0131nda olan ekipler, b\u00f6lgenin t\u00fcm\u00fcnde <strong>55 km<\/strong> uzunlukta havai hat \u00e7ekerken yap\u0131m\u0131 biten yer alt\u0131 hatt\u0131n uzunlu\u011fu ise <strong>100 km<\/strong>&#8216;ye \u00e7\u0131kt\u0131. Ayr\u0131ca<strong> 1.309<\/strong> direk, <strong>2.348<\/strong> armat\u00fcr, <strong>5 trafo<\/strong> postas\u0131 ve <strong>41 mono blok<\/strong> kabinin montajlar\u0131 da k\u0131sa s\u00fcrede tamamland\u0131. \u0130l\u00e7enin her noktas\u0131ndan <strong>enerji m\u00fcsaadesi ba\u015fvurusunda<\/strong> bulunan <strong>180&#8217;e yak\u0131n<\/strong> m\u00fc\u015fteriye ait tesis \u00e7al\u0131\u015fmalar\u0131 h\u0131zla tamamlan\u0131rken<strong> resm\u00ee kurumlar<\/strong> ve <strong>m\u00fc\u015fterilerden<\/strong> gelen<strong> \u015febeke deplase talepleri<\/strong> de kar\u015f\u0131land\u0131.<\/p>\n<p class=\"v1MsoNormal\">SEDA\u015e&#8217;\u0131n Gebze b\u00f6lgesinde y\u00fcr\u00fctt\u00fc\u011f\u00fc bak\u0131m \u00e7al\u0131\u015fmalar\u0131 kapsam\u0131nda ise <strong>33 km<\/strong>&#8216;lik havai \u015febeke,<strong> 5,5 km<\/strong> yer alt\u0131 \u015febekesi ve <strong>9 km<\/strong> ayd\u0131nlatma \u015febekesi yenilendi. Kullan\u0131mdaki armat\u00fcrler bak\u0131ma al\u0131n\u0131rken tamam\u0131 yeni olmak \u00fczere<strong> 496<\/strong> direk ve<strong> 336<\/strong> armat\u00fcr tak\u0131ld\u0131. Damga ayar s\u00fcrelerinin doldu\u011fu tespit edilen <strong>12 binden fazla<\/strong> elektrik sayac\u0131 da yenisiyle de\u011fi\u015ftirilip <strong>\u00f6l\u00e7\u00fc devre kontrolleri<\/strong> yap\u0131ld\u0131.<\/p>\n<p class=\"v1MsoNormal\">SEDA\u015e&#8217;\u0131n bir sene i\u00e7inde h\u0131zla tamamlad\u0131\u011f\u0131 yat\u0131r\u0131m, bak\u0131m ve saha faaliyetleri sayesinde, <strong>Gebze il\u00e7esi<\/strong>nde m\u00fc\u015fteri \u015fikayetleri bir \u00f6nceki y\u0131la k\u0131yasla <strong>% 33<\/strong> azalma g\u00f6sterirken, <strong>m\u00fc\u015fteri memnuniyet seviyesi<\/strong>ni art\u0131rmaya y\u00f6nelik faaliyetler s\u00fcrd\u00fcr\u00fcl\u00fcyor.<\/p>\n<p class=\"v1MsoNormal\"><b>SEDA\u015e KURUMSAL \u0130LET\u0130\u015e\u0130M VE M\u00dc\u015eTER\u0130 \u0130L\u0130\u015eK\u0130LER\u0130 M\u00dcD\u00dcRL\u00dc\u011e\u00dc<\/b><\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Sakarya Elektrik Da\u011f\u0131t\u0131m (SEDA\u015e), 20 bin kilometrekarelik faaliyet b\u00f6lgesindeki yat\u0131r\u0131m projelerini h\u0131zla tamamlamaya devam ederken b\u00f6lgede her ge\u00e7en g\u00fcn artan n\u00fcfus art\u0131\u015f\u0131na [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":161407,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,52],"tags":[2873,87504,6600,64561,105673],"views":43,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/161404"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=161404"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/161404\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/161407"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=161404"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=161404"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=161404"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}