{"id":16136,"date":"2013-10-04T09:49:47","date_gmt":"2013-10-04T06:49:47","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=16136"},"modified":"2013-10-04T09:49:47","modified_gmt":"2013-10-04T06:49:47","slug":"ozenir-enerji-hakkariye-35-mwlik-hes-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ozenir-enerji-hakkariye-35-mwlik-hes-kuracak\/","title":{"rendered":"(Turkish) \u00d6zenir Enerji Hakkari\u2019ye 35 MW`lik HES Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/16136\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u00d6zenir Enerji Elektrik \u00dcretim San. Ve Tic. A.\u015e. taraf\u0131ndan, Hakkari \u0130line 120,8 milyon TL\u2019lik Hidroelektrik Santral (HES) yat\u0131r\u0131m\u0131 yap\u0131lmak \u00fczere \u00e7al\u0131\u015fmalara ba\u015fland\u0131.<\/strong><\/p>\n<p>Projesi i\u00e7in \u00c7evresel Etki De\u011ferlendirme (\u00c7ED), lisans ve di\u011fer izin s\u00fcre\u00e7lerini ba\u015flatan firma, gerekli izinleri almas\u0131 ard\u0131ndan, 3 y\u0131l s\u00fcrecek in\u015faat \u00e7al\u0131\u015fmalar\u0131na ba\u015flamay\u0131 hedefliyor.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/tutev-turkiye-hes-santralleri-hidroelektrik-santrallerin-durumu-potansiyeli-epdk-500x339.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-7156\" title=\"ozenir-enerji-hakkariye-35-mwlik-hes-kuracak\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/tutev-turkiye-hes-santralleri-hidroelektrik-santrallerin-durumu-potansiyeli-epdk-500x339-300x203.jpg\" alt=\"\" width=\"300\" height=\"203\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/tutev-turkiye-hes-santralleri-hidroelektrik-santrallerin-durumu-potansiyeli-epdk-500x339-300x203.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/tutev-turkiye-hes-santralleri-hidroelektrik-santrallerin-durumu-potansiyeli-epdk-500x339-73x50.jpg 73w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/02\/tutev-turkiye-hes-santralleri-hidroelektrik-santrallerin-durumu-potansiyeli-epdk-500x339.jpg 500w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p><strong>HES, 36 MWm KURULU G\u00dcC\u00dcNDE OLACAK<\/strong><\/p>\n<p>Yenihan HES Projesi\u2019nin 36,10 MWm\/34,74 MWe kurulu g\u00fcc\u00fcnde olmas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor olup, y\u0131lda ortalama 141.854 GWh enerji \u00fcretimi ger\u00e7ekle\u015ftirilecek.<\/p>\n<p>Reg\u00fclat\u00f6r, Zap Suyu ak\u0131mlar\u0131n\u0131 \u00e7evrilecek. Reg\u00fcl\u00e2t\u00f6r yerinde dere yata\u011f\u0131 kotu 1.517 metre, savak kotu 1.517,70 metre olacak. Beton g\u00f6vdeli ve kapakl\u0131 d\u00fc\u015f\u00fcn\u00fclen reg\u00fcl\u00e2t\u00f6rde maksimum su seviyesi ve normal su seviyesi 1.522 metre tepe kotu 1.523,40 metre, savak geni\u015fli\u011fi 52 metre olacak.<\/p>\n<p>Santral, Francis t\u00fcrbin tipinde 3 \u00fcniteden olu\u015facak. Y\u0131lda ortalama olarak \u00fcretilecek g\u00fcvenilir enerji 25.914 GWh, sekonder enerji 69.749 GWh, toplam enerji ise 95.664 GWh olarak \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/ozenir-enerji-hakkariye-35-mwlik-hes-kuracak_5094.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00d6zenir Enerji Elektrik \u00dcretim San. Ve Tic. A.\u015e. taraf\u0131ndan, Hakkari \u0130line 120,8 milyon TL\u2019lik Hidroelektrik Santral (HES) yat\u0131r\u0131m\u0131 yap\u0131lmak \u00fczere \u00e7al\u0131\u015fmalara ba\u015fland\u0131. Projesi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":7156,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[63,67,1009,165,18,7104,35370,1090,9273,9274],"views":1398,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16136"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=16136"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16136\/revisions"}],"predecessor-version":[{"id":16137,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16136\/revisions\/16137"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/7156"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=16136"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=16136"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=16136"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}