{"id":161213,"date":"2022-08-29T16:18:19","date_gmt":"2022-08-29T13:18:19","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=161213"},"modified":"2022-08-29T16:24:56","modified_gmt":"2022-08-29T13:24:56","slug":"akkuyu-ngs-nin-insaati-tum-hiziyla-suruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngs-nin-insaati-tum-hiziyla-suruyor\/","title":{"rendered":"(Turkish) &#8217;Akkuyu NGS&#8217;nin \u0130n\u015faat\u0131 T\u00fcm H\u0131z\u0131yla S\u00fcr\u00fcyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/161213\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>T\u00fcrkiye\u2019nin ilk n\u00fckleer g\u00fc\u00e7 santrali olan Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali (NGS) projesinin hayata ge\u00e7irilmesine ili\u015fkin \u00e7al\u0131\u015fmalar her zamanki h\u0131z\u0131yla devam ederken in\u015faat ve montaj \u00e7al\u0131\u015fmalar\u0131 4 g\u00fc\u00e7 \u00fcnitesinin yan\u0131 s\u0131ra k\u0131y\u0131 hidroteknik yap\u0131lar\u0131, g\u00fc\u00e7 da\u011f\u0131t\u0131m sistemleri, idari binalar, e\u011fitim-uygulama merkezi ve n\u00fckleer g\u00fc\u00e7 santrali fiziksel koruma tesisleri gibi ana ve yard\u0131mc\u0131 tesislerin t\u00fcm b\u00f6l\u00fcmlerinde kesintisiz olarak s\u00fcr\u00fcyor.<\/h2>\n<p><strong>\u00d6nemli in\u015faat<\/strong> ve<strong> montaj i\u015flemleri<\/strong> takvime uygun \u015fekilde ger\u00e7ekle\u015ftirilmektedir. A\u011fustos ay\u0131nda 1\u2019inci g\u00fc\u00e7 \u00fcnitesinin <strong>t\u00fcrbin yo\u011fu\u015fturucusunun<\/strong> kurulumuna ba\u015flanm\u0131\u015ft\u0131r. <strong>14 A\u011fustos<\/strong>\u2019ta ise <strong>1\u2019inci g\u00fc\u00e7 \u00fcnitesi<\/strong>nin reakt\u00f6r binas\u0131na reakt\u00f6r b\u00f6lmesinin en \u00f6nemli mekanizmalar\u0131ndan biri olan kutup vinci kurulmu\u015ftur. Ge\u00e7ti\u011fimiz g\u00fcnlerde Akkuyu NGS sahas\u0131nda hava kanallar\u0131 \u00fcretimi i\u00e7in yeni bir \u00fcretim at\u00f6lyesi de hizmete girmi\u015ftir. <strong>2\u2019nci g\u00fc\u00e7 \u00fcnitesi<\/strong>nin reakt\u00f6r b\u00f6lmesinde ise reakt\u00f6r \u015faft\u0131n\u0131n kaplamas\u0131n\u0131n montaj\u0131 i\u00e7in haz\u0131rl\u0131klar devam etmektedir.<\/p>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-161216\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/08\/akkuyu-ngs-nin-insaati-tum-hiziyla-suruyor.jpg\" alt=\"\" width=\"500\" height=\"281\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/08\/akkuyu-ngs-nin-insaati-tum-hiziyla-suruyor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/08\/akkuyu-ngs-nin-insaati-tum-hiziyla-suruyor-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/08\/akkuyu-ngs-nin-insaati-tum-hiziyla-suruyor-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/08\/akkuyu-ngs-nin-insaati-tum-hiziyla-suruyor-80x45.jpg 80w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>Bu arada Akkuyu NGS&#8217;nin y\u00f6netim<strong> personelinin e\u011fitimine<\/strong> y\u00f6nelik program da aktif olarak uygulanmaktad\u0131r. Programdan mezun olan <strong>5<\/strong> T\u00fcrk vatanda\u015f\u0131 bu y\u0131l <strong>&#8220;Reakt\u00f6r \u0130\u015fletim Ba\u015f Uzman\u0131&#8221;<\/strong> pozisyonu i\u00e7in <strong>teorik<\/strong> ve <strong>uygulamal\u0131 e\u011fitim<\/strong> kurslar\u0131n\u0131n t\u00fcm\u00fcn\u00fc ba\u015far\u0131yla tamamlam\u0131\u015f ve testlerin sonu\u00e7lar\u0131na g\u00f6re y\u00fcksek d\u00fczeydeki bilgi ve becerilerini kan\u0131tlam\u0131\u015flard\u0131r. T\u00fcrk uzmanlar, <strong>Akkuyu NGS<\/strong>&#8216;nin <strong>ilk g\u00fc\u00e7 \u00fcnitesi<\/strong> devreye al\u0131nd\u0131ktan sonra reakt\u00f6r\u00fcn y\u00f6netiminde <strong>Rus \u00e7al\u0131\u015fma arkada\u015flar\u0131<\/strong> ile e\u015fit olarak yer alacaklard\u0131r.<\/p>\n<p>AKKUYU NGS, toplu i\u015ften \u00e7\u0131karma yapt\u0131\u011f\u0131 veya \u00e7al\u0131\u015fanlar\u0131na zorunlu izin verdi\u011fi \u015feklinde medyada ve sosyal a\u011flarda yay\u0131nlanan iddialar ise <strong>ger\u00e7e\u011fi yans\u0131tmamaktad\u0131r<\/strong>. Bu iddialar, Akkuyu NGS projesini itibars\u0131zla\u015ft\u0131rmak amac\u0131yla <strong>anonim kaynaklar taraf\u0131ndan<\/strong> ortaya at\u0131lmaktad\u0131r. Akkuyu NGS&#8217;nin yeni ana y\u00fcklenicisi <strong>TSM Enerji<\/strong> ile<strong> in\u015faat<\/strong> ve<strong> montaj<\/strong> i\u015fleriyle ilgili s\u00f6zle\u015fmeleri yeniden imzalayan \u015firket personeli ve alt y\u00fckleniciler, T\u00fcrkiye&#8217;nin ilk n\u00fckleer santrali i\u00e7in mesleki g\u00f6revlerini yerine getirmeye ve in\u015faat projesinin<strong> hayata ge\u00e7irilmesine<\/strong> katk\u0131da bulunmaya devam etmektedir.<\/p>\n<p>AKKUYU NGS, halka Akkuyu NGS projesinin ilerleyi\u015fi konusunda d\u00fczenli olarak <strong>g\u00fcncel<\/strong> ve <strong>g\u00fcvenilir<\/strong> bilgi vermeye devam edecektir.<\/p>\n<p><strong>AKKUYU N\u00dcKLEER A.\u015e. \u0130leti\u015fim Birimi<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin ilk n\u00fckleer g\u00fc\u00e7 santrali olan Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali (NGS) projesinin hayata ge\u00e7irilmesine ili\u015fkin \u00e7al\u0131\u015fmalar her zamanki h\u0131z\u0131yla devam ederken in\u015faat [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":161216,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[3019,1026,18,105620,23134,105621],"views":355,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/161213"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=161213"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/161213\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/161216"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=161213"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=161213"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=161213"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}