{"id":16102,"date":"2013-10-03T16:32:24","date_gmt":"2013-10-03T13:32:24","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=16102"},"modified":"2013-10-03T16:32:57","modified_gmt":"2013-10-03T13:32:57","slug":"lisanssiz-uretimde-yeni-donem-basliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/lisanssiz-uretimde-yeni-donem-basliyor\/","title":{"rendered":"(Turkish) Lisanss\u0131z \u00dcretimde Yeni D\u00f6nem Ba\u015fl\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/16102\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kendi konutlar\u0131nda, sitelerde ve di\u011fer alanlarda lisans almadan g\u00fcne\u015f, r\u00fczgar kaynaklar\u0131na dayal\u0131 \u00fcretim tesisleri kurarak elektrik \u00fcretebilmek ve ihtiya\u00e7 fazlas\u0131n\u0131 satmak isteyenlerin bekledi\u011fi y\u00f6netmelik yay\u0131mland\u0131.<\/strong><\/p>\n<p>Yeni d\u00fczenleme ile lisanss\u0131z elektrik \u00fcretiminde s\u0131n\u0131rlama 2 kat\u0131na \u00e7\u0131kar\u0131larak 1 megavat oldu.<\/p>\n<p>Y\u00f6netmeli\u011fin yay\u0131nlanmas\u0131 sayesinde bug\u00fcnden itibaren da\u011f\u0131t\u0131m \u015firketleri taraf\u0131ndan yeni lisanss\u0131z \u00fcretim ba\u015fvurular\u0131 kabul edilmeye ba\u015flanacak.<\/p>\n<p>Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK) Ba\u015fkan\u0131 Hasan K\u00f6kta\u015f, uygulaman\u0131n ba\u015flamas\u0131yla birlikte T\u00fcrkiye&#8217;de lisans almadan elektrik \u00fcretmek ve ihtiyac\u0131ndan fazlas\u0131n\u0131 satmak isteyenler i\u00e7in b\u00fcy\u00fck bir potansiyelin harekete ge\u00e7ti\u011fini ifade ederek, &#8220;Toplu konutlar, \u00fcniversiteler, al\u0131\u015fveri\u015f merkezleri s\u0131raya girdi. \u015eimdi bu potansiyeli 2 kat artt\u0131r\u0131yoruz. Ayr\u0131ca kanun gere\u011fi ilerde potansiyele g\u00f6re Bakanlar Kurulu karar\u0131 ile 5 megavata kadar \u00e7\u0131kart\u0131labilecek. Lisanss\u0131z elektrik \u00fcretimi konusunda bug\u00fcn y\u00fcr\u00fcrl\u00fc\u011fe giren mevzuat\u0131m\u0131zda teknik d\u00fczenlemeleri olabildi\u011fince h\u0131zl\u0131 \u00e7\u0131kararak ilgilenen herkesin bu uygulamay\u0131 anlamas\u0131n\u0131 ve bu alandaki b\u00fcy\u00fck potansiyeli da<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/Irak-enerji-elektrik-hat-83453645-505x284.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-14027\" title=\"Irak-enerji-elektrik-hat-83453645-505x284\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/Irak-enerji-elektrik-hat-83453645-505x284-300x168.jpg\" alt=\"\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/Irak-enerji-elektrik-hat-83453645-505x284-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/Irak-enerji-elektrik-hat-83453645-505x284-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/Irak-enerji-elektrik-hat-83453645-505x284-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/Irak-enerji-elektrik-hat-83453645-505x284.jpg 505w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ha da artt\u0131rmay\u0131 hedefliyoruz&#8221; dedi.<\/p>\n<p>Yeni d\u00fczenlemedeki yeniliklere dikkati \u00e7eken K\u00f6kta\u015f, eski y\u00f6netmelikte, \u00fcretim tesisi kurulmadan \u00f6nce, ilgili t\u00fcketim tesisinin de haz\u0131r olmas\u0131 gerekti\u011fini, yeni y\u00f6netmelikle \u00fcretim ile t\u00fcketim tesisinin e\u015f zamanl\u0131 olarak projelendirilip in\u015fa edilebilmesine izin verildi\u011fini s\u00f6yledi. K\u00f6kta\u015f, &#8220;B\u00f6ylece, site veya al\u0131\u015fveri\u015f merkezi tarz\u0131 yap\u0131lar\u0131n projelendirilmesi ve yap\u0131m\u0131nda, enerji tesislerinin de e\u015f zamanl\u0131 olarak yap\u0131m\u0131na imkan sa\u011fland\u0131. Bu sayede sonradan ek maliyetlerin ortaya \u00e7\u0131kmas\u0131n\u0131 engelleyip, projelerin daha verimli bir \u015fekilde ger\u00e7ekle\u015ftirilmesine imkan tan\u0131yoruz&#8221; diye konu\u015ftu.<\/p>\n<p>K\u00f6kta\u015f, ayr\u0131ca y\u00f6netmelikle, lisanss\u0131z elektrik \u00fcretim tesislerinin kapsam\u0131na belediyelerin kat\u0131 at\u0131k tesisleri ile ar\u0131tma tesisi \u00e7amurlar\u0131n\u0131n bertaraf\u0131nda kullan\u0131lmak \u00fczere kurulan elektrik \u00fcretim tesislerinin, \u00fcretti\u011fi enerjinin tamam\u0131n\u0131 iletim veya da\u011f\u0131t\u0131m sistemine vermeden kullanan, \u00fcretimi ve t\u00fcketimi ayn\u0131 \u00f6l\u00e7\u00fcm noktas\u0131nda olan, yenilenebilir enerji kaynaklar\u0131na dayal\u0131 \u00fcretim tesislerinin ve sermayesinin yar\u0131s\u0131ndan fazlas\u0131 belediyeye ait olan t\u00fczel ki\u015filerce, belediyeler taraf\u0131ndan i\u015fletilen su isale hatlar\u0131 ile at\u0131k su isale hatlar\u0131 \u00fczerinde kurulan tesislerin de eklendi\u011fini ifade etti.<\/p>\n<p>D\u00fczenleme ile lisansl\u0131 \u00fcretimden lisanss\u0131z \u00fcretime, lisans\u0131z \u00fcretimden ise lisansl\u0131 \u00fcretime ge\u00e7i\u015fe imkan sa\u011fland\u0131\u011f\u0131na dikkati \u00e7eken K\u00f6kta\u015f, kojenerasyonlar hari\u00e7 olmak \u00fczere yenilenebilir enerji kaynaklar\u0131na dayal\u0131 olmayan lisanss\u0131z \u00fcretim tesislerinde de Yenilenebilir Enerji Kaynaklar\u0131n\u0131 Destekleme Mekanizmas\u0131 (YEKDEM) kapsam\u0131nda 7,3 dolar sent al\u0131m garantisi verilmesinin \u00f6n\u00fcn\u00fcn a\u00e7\u0131ld\u0131\u011f\u0131n\u0131 kaydetti.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.energyworld.com.tr\/root.vol?title=lisanssiz-uretimde-yeni-donem-basliyor&amp;exec=page&amp;nid=578324\" target=\"_blank\">Energy World<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kendi konutlar\u0131nda, sitelerde ve di\u011fer alanlarda lisans almadan g\u00fcne\u015f, r\u00fczgar kaynaklar\u0131na dayal\u0131 \u00fcretim tesisleri kurarak elektrik \u00fcretebilmek ve ihtiya\u00e7 fazlas\u0131n\u0131 satmak isteyenlerin bekledi\u011fi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14027,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,50],"tags":[68,19,63,67,1009,1046,165,750,227,2989,9250,3518,2282,69,2705],"views":627,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16102"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=16102"}],"version-history":[{"count":6,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16102\/revisions"}],"predecessor-version":[{"id":16108,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16102\/revisions\/16108"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/14027"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=16102"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=16102"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=16102"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}