{"id":161002,"date":"2022-08-25T12:11:10","date_gmt":"2022-08-25T09:11:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=161002"},"modified":"2022-08-25T12:46:42","modified_gmt":"2022-08-25T09:46:42","slug":"toplam-10-mw-lik-4-kardes-proje-asunim-e-emanet","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/toplam-10-mw-lik-4-kardes-proje-asunim-e-emanet\/","title":{"rendered":"(Turkish) &#8217;Nipa\u015f Tekstil&#8217; Toplam da 10MW Kurulu G\u00fcce Sahip 4 GES Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/161002\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>&#8216;Nipa\u015f Tekstil&#8217;in farkl\u0131 lokasyonlarda bulunan fabrikalar\u0131na e\u015fzamanl\u0131 olarak toplam 10.075,84kWp kurulu g\u00fcc\u00fcnde GES kurulumu ASUN\u0130M T\u00fcrkiye taraf\u0131ndan yap\u0131lacak.<\/h2>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-161005\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/08\/toplam-10-mw-lik-4-kardes-proje-asunim-e-emanet-2.jpg\" alt=\"\" width=\"270\" height=\"202\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/08\/toplam-10-mw-lik-4-kardes-proje-asunim-e-emanet-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/08\/toplam-10-mw-lik-4-kardes-proje-asunim-e-emanet-2-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/08\/toplam-10-mw-lik-4-kardes-proje-asunim-e-emanet-2-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/08\/toplam-10-mw-lik-4-kardes-proje-asunim-e-emanet-2-67x50.jpg 67w\" sizes=\"(max-width: 270px) 100vw, 270px\" \/>ASUN\u0130M T\u00fcrkiye<\/strong> tek yat\u0131r\u0131mc\u0131ya ait olmak \u00fczere <strong>Osmaniye<\/strong>\u2019de<strong> 1.515,15kWp<\/strong> ve <strong>1.605,24kWp<\/strong> g\u00fcc\u00fcnde, <strong>Kahramanmara\u015f<\/strong>\u2019ta <strong>1.924,65kWp<\/strong> ve<strong> 5.030,80kWp<\/strong> g\u00fcc\u00fcnde toplamda <strong>4 fabrika \u00e7at\u0131s\u0131&#8217;<\/strong>na anahtar teslim <strong>g\u00fcne\u015f enerjisi santrali kurulumu<\/strong> i\u00e7in s\u00f6zle\u015fme imzalad\u0131. <em>Yurt i\u00e7i ve yurt d\u0131\u015f\u0131<\/em> pazarlara bu topraklar\u0131n ipli\u011fini sunan <strong>Nipa\u015f Tekstil<\/strong>, bu sayede enerjisini<strong> temiz<\/strong> ve <strong>s\u0131n\u0131rs\u0131z<\/strong> bir kaynaktan <strong>d\u00fc\u015f\u00fck maliyetlerle<\/strong> sa\u011flayarak t\u00fcm pazarlarda <strong>rekabet g\u00fcc\u00fcn\u00fc<\/strong> art\u0131r\u0131rken <strong>\u00e7evreye<\/strong> de <strong>dost \u00fcretim<\/strong> ger\u00e7ekle\u015ftirecek.<\/p>\n<p><em>T\u00fcm projelendirme ve m\u00fchendislik hizmetleri, g\u00f6lge analizleri, \u00fcretim sim\u00fclasyonlar\u0131, optimizasyonlar<\/em> <strong>ASUN\u0130M<\/strong>\u2019in Avrupa\u2019daki<strong> m\u00fchendislik departman\u0131<\/strong> taraf\u0131ndan <strong>en g\u00fcncel teknikler<\/strong> ve ASUN\u0130M\u2019e <strong>\u00f6zel yaz\u0131l\u0131mlar<\/strong> kullan\u0131larak yap\u0131lacak olan <strong>projenin bak\u0131m onar\u0131m faaliyetleri<\/strong>, <strong>ASUN\u0130M<\/strong>\u2019in i\u015ftiraki olan <strong>MAXIMA Enerji<\/strong> taraf\u0131ndan y\u00fcr\u00fct\u00fclecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. &#8216;Nipa\u015f Tekstil&#8217;in farkl\u0131 lokasyonlarda bulunan fabrikalar\u0131na e\u015fzamanl\u0131 olarak toplam 10.075,84kWp kurulu g\u00fcc\u00fcnde GES kurulumu ASUN\u0130M T\u00fcrkiye taraf\u0131ndan yap\u0131lacak. ASUN\u0130M T\u00fcrkiye tek yat\u0131r\u0131mc\u0131ya [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":161006,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[6742,6743,32265,21886,105524,2206,36099,26556,105523,105522,105526,105527,6490,105525],"views":496,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/161002"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=161002"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/161002\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/161006"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=161002"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=161002"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=161002"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}