{"id":16094,"date":"2013-10-03T09:52:46","date_gmt":"2013-10-03T06:52:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=16094"},"modified":"2013-10-03T09:54:21","modified_gmt":"2013-10-03T06:54:21","slug":"5-ruzgar-enerjisi-santrali-projesi-icin-enda-enerji-kredi-sagladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/5-ruzgar-enerjisi-santrali-projesi-icin-enda-enerji-kredi-sagladi\/","title":{"rendered":"(Turkish) 5 R\u00fczgar Enerjisi Santrali \u0130\u00e7in Enda Enerji Kredi Sa\u011flad\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/16094\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Enda Enerji Holding A.\u015e.&#8217;nin be\u015f ayr\u0131 r\u00fczg\u00e2r enerjisi santrali yat\u0131r\u0131m\u0131 i\u00e7in\u00a0 T\u00fcrkiye \u0130\u015f Bankas\u0131&#8217;ndan<br \/>\n120 milyon dolarl\u0131k projeleri i\u00e7in\u00a0 96 milyon ABD Dolar\u0131 tutar\u0131nda kaynak sa\u011flad\u0131\u011f\u0131\u00a0 a\u00e7\u0131kland\u0131. \u0130\u015f Bankas\u0131 taraf\u0131ndan konu ile ilgili yap\u0131lan a\u00e7\u0131klamada kayna\u011f\u0131n ilk 2,5\u00a0 y\u0131l\u0131n\u0131n anapara geri \u00f6demesiz olmak \u00fczere toplam 12 y\u0131l vade ile kulland\u0131r\u0131ld\u0131\u011f\u0131 belirtildi.<\/strong><\/p>\n<p>Toplam yat\u0131r\u0131m b\u00fcy\u00fckl\u00fc\u011f\u00fc 120 milyon dolar olacak ve 2015&#8217;in ilk \u00e7eyre\u011finde\u00a0 i\u015fletmeye al\u0131nmas\u0131 \u00f6ng\u00f6r\u00fclen santrallerin (Ala\u00e7at\u0131 RES, Germiyan RES, Urla RES,\u00a0 Mordog\u0306an RES, Yaylak\u00f6y RES) toplam kurulu g\u00fc\u00e7leri ise 68.6 MW olacak.\u00a0 Santrallerin toplamda y\u0131ll\u0131k 197 milyon kilovat-saat (kWh) elektrik \u00fcretimi\u00a0 sa\u011flamas\u0131 hedefleniyor.<\/p>\n<p>Finansman\u0131n kulland\u0131r\u0131lmas\u0131 d<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/11\/79689_ruzgar_enerjisi-480x268.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-3324\" title=\"5-ruzgar-enerjisi-santrali-icin-enda-enerji-kredi-sagladi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/11\/79689_ruzgar_enerjisi-480x268-300x197.jpg\" alt=\"\" width=\"300\" height=\"197\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/11\/79689_ruzgar_enerjisi-480x268-300x197.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/11\/79689_ruzgar_enerjisi-480x268-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/11\/79689_ruzgar_enerjisi-480x268.jpg 408w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>olay\u0131s\u0131 ile d\u00fczenlenen imza t\u00f6reninde konu\u015fan\u00a0 I\u0307s\u0327 Bankas\u0131 Genel M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 Suat \u0130nce, Enda Enerji Holding A.S\u0327.&#8217;nin\u00a0 yak\u0131n zamanda faaliyete ge\u00e7irdi\u011fi Eg\u0306lence I ve Eg\u0306lence II hidroelektrik\u00a0 santral projelerini i\u00e7in de iki y\u0131l \u00f6nce 80 milyon ABD Dolar\u0131 tutar\u0131nda\u00a0 finansman sag\u0306lad\u0131klar\u0131n\u0131 hat\u0131rlat\u0131rken, \u0130\u015f Bankas\u0131&#8217;n\u0131n enerji projelerine\u00a0 sa\u011flad\u0131\u011f\u0131 toplam finansman\u0131n ise 6 milyar dolara ula\u015ft\u0131\u011f\u0131 bilgisini verdi.<\/p>\n<p>Suat\u00a0 \u0130nce \u0130\u015f Bankas\u0131&#8217;n\u0131n T\u00fcrkiye&#8217;nin ihtiya\u00e7lar\u0131 paralelinde dog\u0306ru yap\u0131land\u0131r\u0131lm\u0131s\u0327,\u00a0 fizibilitesi yeterli ve \u00f6zellikle \u00e7evresel konularda t\u00fcm \u00f6nlemleri al\u0131nm\u0131s\u0327\u00a0 enerji projelerine finansman desteg\u0306ini \u00f6n\u00fcm\u00fczdeki d\u00f6nemde de s\u00fcrd\u00fcreceg\u0306ini\u00a0 s\u00f6zlerine ekledi.<\/p>\n<p>Enda Enerji Holding Y\u00f6netim Kurulu \u00dcyesi ve RES Projeleri I\u0307cra Kurulu\u00a0 Bas\u0327kan\u0131 Enis \u00d6zsaruhan ise a\u00e7\u0131klamas\u0131nda Enda Enerji&#8217;nin hali haz\u0131rda 6\u00a0 hidroelektrik, 2 dog\u0306al gaz \u00e7evirim ve 1 jeotermal enerji santralinden olu\u015fan\u00a0 toplam 297 MW&#8217;l\u0131k kurulu g\u00fcc\u00fc bulundu\u011fu bilgisini verirken, 2015 y\u0131l\u0131 ilk\u00a0 \u00e7eyreg\u0306inde devreye girecek 5 adet r\u00fczg\u00e2r enerjisi santrali ile toplam santral\u00a0 say\u0131s\u0131n\u0131 14&#8217;e, kurulu g\u00fcc\u00fcn\u00fc ise 365 MW&#8217;a \u00e7\u0131karaca\u011f\u0131n\u0131 belirtti.<\/p>\n<p>\u00d6zsaruhan\u00a0 s\u00f6zlerinin devam\u0131nda bu yat\u0131r\u0131mlara ba\u015flamak ile de elektrik \u00fcretim portf\u00f6ylerinde yenilenebilir enerji kaynaklar\u0131n\u0131n pay\u0131n\u0131n art\u0131r\u0131lmas\u0131 hedefinde\u00a0 \u00f6nemli bir ad\u0131m daha att\u0131klar\u0131na da vurgu yapt\u0131.<\/p>\n<p>Yay\u0131nc\u0131: <a href=\"https:\/\/www.enerjigazetesi.ist\" target=\"_blank\">Enerji Gazetesi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Enda Enerji Holding A.\u015e.&#8217;nin be\u015f ayr\u0131 r\u00fczg\u00e2r enerjisi santrali yat\u0131r\u0131m\u0131 i\u00e7in\u00a0 T\u00fcrkiye \u0130\u015f Bankas\u0131&#8217;ndan 120 milyon dolarl\u0131k projeleri i\u00e7in\u00a0 96 milyon ABD Dolar\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3324,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[8814,9246,519,9247,63,67,1009,1306,165,9243,8815,9244,6628,9242,474,231,312,9245,8813,8816,8818,5844],"views":1025,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16094"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=16094"}],"version-history":[{"count":5,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16094\/revisions"}],"predecessor-version":[{"id":16099,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/16094\/revisions\/16099"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/3324"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=16094"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=16094"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=16094"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}