{"id":160647,"date":"2022-08-18T16:46:44","date_gmt":"2022-08-18T13:46:44","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=160647"},"modified":"2022-08-18T16:46:44","modified_gmt":"2022-08-18T13:46:44","slug":"akkuyu-ngs-1-inci-unitesi-turbin-ekipmanlarinin-montajina-baslandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngs-1-inci-unitesi-turbin-ekipmanlarinin-montajina-baslandi\/","title":{"rendered":"(Turkish) &#8217;Akkuyu NGS&#8217; 1&#8217;inci \u00dcnitesi T\u00fcrbin Ekipmanlar\u0131n\u0131n Montaj\u0131na Ba\u015fland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/160647\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali (NGS) sahas\u0131nda \u00e7al\u0131\u015fmalar s\u00fcr\u00fcyor. Bu \u00e7al\u0131\u015fmalar kapsam\u0131nda 1\u2019inci \u00fcnitenin t\u00fcrbin b\u00f6l\u00fcm\u00fcnde t\u00fcrbin yo\u011fu\u015fturucusunun kurulumuna ba\u015fland\u0131. Yo\u011fu\u015fturucu, 10\u2019dan fazla \u00f6nceden birle\u015ftirilmi\u015f par\u00e7adan olu\u015fuyor. Bu par\u00e7alar aras\u0131nda, 4 b\u00f6l\u00fcmden olu\u015fan ve 42 ton a\u011f\u0131rl\u0131\u011f\u0131nda olan yo\u011fu\u015fma tahliye hatt\u0131 da yer al\u0131yor. Yo\u011fu\u015fma tahliye hatt\u0131 sayesinde kullan\u0131lan buhar tahliye ediliyor.<\/h2>\n<p>Yo\u011fu\u015fma tahliye hatt\u0131n\u0131n kurulumu ile kaynak haz\u0131rl\u0131\u011f\u0131n\u0131 kapsayan ve toplamda <strong>32 g\u00fcn<\/strong> s\u00fcrmesi planlanan montaj\u0131n ilk a\u015famas\u0131 tamamland\u0131. <strong>Yo\u011fu\u015fturucu<\/strong>, <strong>montaj\u0131<\/strong> bitirildi\u011finde <strong>25 metre<\/strong> uzunlu\u011fa, <strong>16 metre<\/strong> geni\u015fli\u011fe ve <strong>17 metre<\/strong> y\u00fcksekli\u011fe sahip olacak. Yap\u0131n\u0131n a\u011f\u0131rl\u0131\u011f\u0131 ise<strong> 1000 tonu<\/strong> a\u015facak.<\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-160652\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/08\/akkuyu-ngs-1-inci-unitesi-turbin-ekipmanlarinin-montajina-baslandi-3.jpg\" alt=\"\" width=\"320\" height=\"216\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/08\/akkuyu-ngs-1-inci-unitesi-turbin-ekipmanlarinin-montajina-baslandi-3.jpg 530w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/08\/akkuyu-ngs-1-inci-unitesi-turbin-ekipmanlarinin-montajina-baslandi-3-300x202.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/08\/akkuyu-ngs-1-inci-unitesi-turbin-ekipmanlarinin-montajina-baslandi-3-500x337.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/08\/akkuyu-ngs-1-inci-unitesi-turbin-ekipmanlarinin-montajina-baslandi-3-74x50.jpg 74w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>B\u00f6l\u00fcm\u00fcn kaynak i\u015flemleri yakla\u015f\u0131k <strong>10 g\u00fcn<\/strong> boyunca devam edecek. Bu s\u00fcrecin ard\u0131ndan <strong>alt<\/strong> ve <strong>orta b\u00f6l\u00fcmlerin kurulumu<\/strong> i\u00e7in yard\u0131mc\u0131 yap\u0131lar\u0131n montaj\u0131 ger\u00e7ekle\u015ftirilecek. <strong>T\u00fcrbin yo\u011fu\u015fturucu<\/strong>sunun montaj\u0131, <strong>uzman personeller<\/strong> taraf\u0131ndan yap\u0131lacak.<\/p>\n<p>AKKUYU N\u00dcKLEER Genel M\u00fcd\u00fcr <strong>Birinci Yard\u0131mc\u0131s\u0131<\/strong> ve NGS Yap\u0131 \u0130\u015fleri Direkt\u00f6r\u00fc <strong>Sergey Butckikh<\/strong>, konuyla ilgili yapt\u0131\u011f\u0131 a\u00e7\u0131klamada <span style=\"text-decoration: underline;\">\u015funlar\u0131 s\u00f6yledi:<\/span> <em>\u201c1&#8217;inci \u00fcnitenin t\u00fcrbin b\u00f6l\u00fcm\u00fcnde \u00f6nemli bir operasyon ba\u015fl\u0131yor. <strong>Termal<\/strong> ve <strong>mekanik ekipman\u0131n kurulumunda<\/strong> yer alacak t\u00fcm in\u015faat\u00e7\u0131lara ve uzmanlara ba\u015far\u0131lar diliyor, <strong>hepsini \u015fimdiden tebrik ediyorum!<\/strong> Bu a\u015fama, t\u00fcrbin adas\u0131n\u0131n in\u015fas\u0131nda hayati bir \u00f6nem ta\u015f\u0131yor. Sonras\u0131nda <strong>t\u00fcrbin jenerat\u00f6r setinin<\/strong> ana ekipman\u0131n\u0131n kurulumu yap\u0131lacak. Sahadaki <strong>in\u015faat i\u015fleri<\/strong> ve <strong>ekipman montaj\u0131<\/strong>, haftan\u0131n <strong>7 g\u00fcn\u00fc<\/strong>, g\u00fcn\u00fcn her saati vardiyalar halinde kesintisiz bir \u015fekilde devam ediyor. Profesyonel <strong>in\u015faat\u00e7\u0131lar, montajc\u0131lar, kaynak\u00e7\u0131lar<\/strong> ve <strong>di\u011fer uzmanlardan<\/strong> olu\u015fan ekipler yo\u011fun bir tempoda emek vererek iyi koordine edilmi\u015f bir ekip \u00e7al\u0131\u015fmas\u0131 sergiliyorlar.\u201d<\/em><\/p>\n<p>T\u00fcrbin yo\u011fu\u015fturucusu, Rosatom\u2019un <strong>yak\u0131t<\/strong> ve<strong> enerji kompleksi i\u015fletmeleri<\/strong> i\u00e7in son derece karma\u015f\u0131k \u0131s\u0131 de\u011fi\u015fim ekipmanlar\u0131n\u0131n \u00fcretiminde uzmanla\u015fm\u0131\u015f, n\u00fckleer ve termal enerji santralleri, petrol ve gaz end\u00fcstrisi ile gemi yap\u0131m\u0131 g\u00f6revlerini y\u00fcr\u00fcten <strong>makine in\u015fa tesisi<\/strong> olan<strong> ZiO Podolsk<\/strong> taraf\u0131ndan \u00fcretildi.<\/p>\n<p><strong>1&#8217;inci g\u00fc\u00e7 \u00fcnitesinin<\/strong> t\u00fcrbin binas\u0131nda <strong>t\u00fcrbin \u00fcnitesinin kurulumu<\/strong> i\u00e7in <strong>temel betonlama i\u015flemleri<\/strong> bu y\u0131l\u0131n <strong>haziran ay\u0131nda<\/strong> tamamlanm\u0131\u015ft\u0131. Temel gerekli sa\u011flaml\u0131\u011f\u0131 kazand\u0131ktan sonra uzmanlar g\u00f6m\u00fcl\u00fc par\u00e7alar\u0131n kurulumunu ger\u00e7ekle\u015ftirerek <strong>t\u00fcrbin yo\u011fu\u015fturucu bile\u015fenlerinin montaj\u0131na<\/strong> devam ediyorlar. \u0130lerleyen d\u00f6nemde buraya bir <strong>t\u00fcrbin tesisi<\/strong> kurulacak.<\/p>\n<p><strong>Akkuyu NGS sahas\u0131<\/strong>ndaki in\u015faat\u0131n t\u00fcm a\u015famalar\u0131, <strong>ba\u011f\u0131ms\u0131z yap\u0131 denetim kurulu\u015flar\u0131<\/strong> ve <strong>ulusal d\u00fczenleyici<\/strong> olan<strong> N\u00fckleer D\u00fczenleme Kurumu (NDK)<\/strong> taraf\u0131ndan <strong>yak\u0131ndan denetlenmeye<\/strong> devam ediyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali (NGS) sahas\u0131nda \u00e7al\u0131\u015fmalar s\u00fcr\u00fcyor. Bu \u00e7al\u0131\u015fmalar kapsam\u0131nda 1\u2019inci \u00fcnitenin t\u00fcrbin b\u00f6l\u00fcm\u00fcnde t\u00fcrbin yo\u011fu\u015fturucusunun kurulumuna ba\u015fland\u0131. Yo\u011fu\u015fturucu, 10\u2019dan fazla [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":160653,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[48024,19356,105372,105375,105374,105373,105370,105371],"views":314,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/160647"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=160647"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/160647\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/160653"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=160647"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=160647"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=160647"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}