{"id":15953,"date":"2013-09-30T09:22:41","date_gmt":"2013-09-30T06:22:41","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=15953"},"modified":"2013-09-30T09:24:00","modified_gmt":"2013-09-30T06:24:00","slug":"sivasin-ilk-gunes-enerji-santrali-devreye-alindi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sivasin-ilk-gunes-enerji-santrali-devreye-alindi\/","title":{"rendered":"(Turkish) Sivas\u2019\u0131n \u0130lk G\u00fcne\u015f Enerji Santrali Devreye Al\u0131nd\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/15953\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ankara Karayolu \u00fczerindeki 250.000 m\u00b2\u2019lik alanda kurulan, Anadolu\u2019nun en b\u00fcy\u00fck besi \u00e7iftlikleri aras\u0131nda g\u00f6sterilen Marka Grup Besi \u00c7iftli\u011fi\u2019ndeki 500kWp\u2019lik g\u00fcne\u015f enerji santralinin uygulamas\u0131n\u0131 ve resmi kabullerini tamamlayarak devreye ald\u0131.<\/strong><\/p>\n<p>Santrale ait TEDA\u015e proje onay\u0131, \u00c7EDA\u015e ile da\u011f\u0131t\u0131m ba\u011flant\u0131 ve sistem kullan\u0131m anla\u015fmalar\u0131n\u0131n imzalanmas\u0131 ve santralin resmi kabul s\u00fcre\u00e7leri b\u00fcy\u00fck bir titizlikle tamamlanm\u0131\u015f oldu.<\/p>\n<p>Daha \u00f6nce tamamlad\u0131\u011f\u0131 Prokon A.\u015e \u2018ye ait 500 kWp\u2019lik g\u00fcne\u015f enerji santrali projesinde oldu\u011fu gibi; m\u00fchendislik, tedarik ve uygulama basamaklar\u0131n\u0131n tamam\u0131 Else Enerji\u2019nin liderli\u011finde tamamlanm\u0131\u015f olan santral, b\u00f6lgenin \u00f6nde gelen firmalar\u0131ndan olan Sivas Aktif Enerji ve Else Enerji i\u015f ortakl\u0131\u011f<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/sivasin-ilk-gunes-enerji-santrali-devreye-alindi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-15954\" title=\"sivasin-ilk-gunes-enerji-santrali-devreye-alindi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/sivasin-ilk-gunes-enerji-santrali-devreye-alindi-300x199.jpg\" alt=\"\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/sivasin-ilk-gunes-enerji-santrali-devreye-alindi-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/sivasin-ilk-gunes-enerji-santrali-devreye-alindi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/sivasin-ilk-gunes-enerji-santrali-devreye-alindi.jpg 495w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\u0131 ile hayata ge\u00e7irildi.<\/p>\n<p>Marka Grup Besi \u00c7iftli\u011fi, g\u00fcne\u015f enerji santralinin devreye girmesi ile birlikte elektrik t\u00fcketiminin %100 \u2019\u00fcn\u00fc bu santralden kar\u015f\u0131layacak. Bununla birlikte Marka Grup Besi \u00c7iftli\u011fi ihtiya\u00e7 fazlas\u0131 enerjiyi satarak firmaya ek gelir de sa\u011flayacak. Projenin bir di\u011fer \u00f6zelli\u011fi de Ekonomi Bakanl\u0131\u011f\u0131 taraf\u0131ndan verilen KDV ve KKDF te\u015fviklerinden yararlan\u0131lm\u0131\u015f olmas\u0131. Marka Grup, g\u00fcne\u015f enerji santrali yat\u0131r\u0131m\u0131nda KDV\u2019den muaft\u0131. Projede kaz\u0131k \u00e7akmal\u0131 ta\u015f\u0131y\u0131c\u0131 konstr\u00fcksiyon sistemi \u00f6zellikle kullan\u0131ld\u0131. Burada ama\u00e7 bir taraftan maliyeti d\u00fc\u015f\u00fcrmek, di\u011fer taraftan da b\u00fcy\u00fck (lisansl\u0131) g\u00fcne\u015f enerji santrallerine daha k\u00fc\u00e7\u00fck \u00e7apta \u00f6rnek olu\u015fturmakt\u0131.<\/p>\n<p>&nbsp;<\/p>\n<p>Tesis ile ilgili olarak Marka Grup Y\u00f6netim Kurulu Ba\u015fkan\u0131 Halis KAPLAN \u015funlar\u0131 s\u00f6yledi:<\/p>\n<p>Marka Grup olarak ilk kuruldu\u011fumuzdan beri ilklerin \u00f6nc\u00fcs\u00fc olma vizyonuyla hareket ettik. Yapm\u0131\u015f oldu\u011fumuz bu yat\u0131r\u0131m da yine b\u00f6lgedeki ilklerden bir tanesi oldu. Yat\u0131r\u0131m karar\u0131n\u0131 al\u0131rken \u00f6nceli\u011fimiz \u00e7evresel duyarl\u0131l\u0131\u011f\u0131m\u0131z\u0131 g\u00f6stermek ve karbon sal\u0131m\u0131 konusunda bir ad\u0131m atmak oldu. Bunun yan\u0131nda artan elektrik fiyatlar\u0131 da bir ba\u015fka etken elbette. Kurulan tesisin y\u0131lda \u00fcretece\u011fi elektrik miktar\u0131n\u0131n 700.000 kWh ila 750.000 kWh seviyelerinde olaca\u011f\u0131n\u0131 bekliyoruz.<\/p>\n<p>\u00dcretilecek bu elektrik ile marketlerimizin ve besi \u00e7iftli\u011fimizin elektrik t\u00fcketimlerine katk\u0131 sa\u011flanacak. Tesisin amortisman s\u00fcresini asl\u0131na bak\u0131l\u0131rsa T\u00fcrkiye\u2019deki elektrik fiyat art\u0131\u015flar\u0131 belirleyecek. \u015eu anda yap\u0131lan hesaplamalar 7-8 y\u0131l seviyelerinde olabilece\u011fini g\u00f6steriyor. 25 y\u0131l performans\u0131 garanti edilen bir yat\u0131r\u0131m i\u00e7in bu amortisman s\u00fcresi olduk\u00e7a cazip, g\u00fcne\u015f enerji santrali yat\u0131r\u0131mlar\u0131m\u0131za kademeli olarak devam edece\u011fiz. \u00dclkemizde g\u00fcne\u015f enerji santrali kurmak isteyen b\u00fct\u00fcn yat\u0131r\u0131mc\u0131lara kap\u0131m\u0131z a\u00e7\u0131k, isteyen herkes santralimizi ziyaret edip inceleyebilir.<\/p>\n<p>Proje onay s\u00fcrecinden, devreye alma s\u00fcrecine kadar t\u00fcm a\u015famalar\u0131n Else Enerji liderli\u011finde, Sivas Aktif Enerji ile birlikte y\u00fcr\u00fct\u00fclen projede, kullan\u0131lan markalar \u015fu \u015fekildedir:<\/p>\n<p><img loading=\"lazy\" class=\"aligncenter\" src=\"http:\/\/enerjienstitusu.com\/medya\/2221-505x378.jpg\" alt=\"2221\" width=\"505\" height=\"378\" \/><\/p>\n<p>Performans-kalite-fiyat dengesi g\u00f6z \u00f6n\u00fcne al\u0131narak Hanwha SolarOne SF220 \u2013 245Wp model g\u00fcne\u015f paneli tercih edildi. \u0130nverter olarak yine d\u00fcnyan\u0131n en iyi inverter markalar\u0131ndan bir tanesi olarak g\u00f6sterilen Alman SMA\u2019n\u0131n STP20000TL-EE model y\u00fcksek verimli inverteri kullan\u0131ld\u0131. Ta\u015f\u0131y\u0131c\u0131 konstr\u00fcksiyon ve sabitleme sisteminde yerli mal\u0131 olan Alkor Al\u00fcminyum taraf\u0131ndan \u00fcretilen ta\u015f\u0131y\u0131c\u0131 sistem tercih edildi. Sistemin \u00f6nemli\u00a0komponentlerinden olan solar kablo ve konekt\u00f6rlerde ise pazar\u0131n \u00f6nc\u00fc markas\u0131 olan Multi-Contact markas\u0131 tercih edildi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/09\/30\/sivasin-ilk-gunes-enerji-santrali-devreye-alindi\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ankara Karayolu \u00fczerindeki 250.000 m\u00b2\u2019lik alanda kurulan, Anadolu\u2019nun en b\u00fcy\u00fck besi \u00e7iftlikleri aras\u0131nda g\u00f6sterilen Marka Grup Besi \u00c7iftli\u011fi\u2019ndeki 500kWp\u2019lik g\u00fcne\u015f enerji santralinin uygulamas\u0131n\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":15954,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[9094,9099,9098,9091,9093,9096,19,6653,63,67,1009,165,2326,227,13,2569,9095,9097,9090,9100,2437,9092],"views":1180,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/15953"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=15953"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/15953\/revisions"}],"predecessor-version":[{"id":15956,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/15953\/revisions\/15956"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/15954"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=15953"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=15953"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=15953"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}