{"id":158931,"date":"2022-07-10T19:33:58","date_gmt":"2022-07-10T16:33:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=158931"},"modified":"2022-07-10T19:34:56","modified_gmt":"2022-07-10T16:34:56","slug":"abd-2029-yilina-kadar-6-gw-offshore-ruzgar-kapasitesi-ilave-edecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/abd-2029-yilina-kadar-6-gw-offshore-ruzgar-kapasitesi-ilave-edecek\/","title":{"rendered":"U.S. to Add 6 GW Offshore Wind Capacity Through 2029"},"content":{"rendered":"<p><\/p>\n<div class=\"article-body__content__17Yit paywall-article\">\n<h2 class=\"text__text__1FZLe text__dark-grey__3Ml43 text__regular__2N1Xr text__large__nEccO body__base__22dCE body__large_body__FV5_X article-body__element__2p5pI\" data-testid=\"paragraph-0\">Power plant developers and operators plan to install more than 6 gigawatts of offshore wind capacity at sites mostly along the U.S. eastern seaboard over the next seven years, <img loading=\"lazy\" class=\"alignright wp-image-158934\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/07\/abd-2029-yilina-kadar-6-gw-offshore-ruzgar-kapasitesi-ilave-edecek.jpeg\" alt=\"\" width=\"320\" height=\"195\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/07\/abd-2029-yilina-kadar-6-gw-offshore-ruzgar-kapasitesi-ilave-edecek.jpeg 770w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/07\/abd-2029-yilina-kadar-6-gw-offshore-ruzgar-kapasitesi-ilave-edecek-300x183.jpeg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/07\/abd-2029-yilina-kadar-6-gw-offshore-ruzgar-kapasitesi-ilave-edecek-768x469.jpeg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/07\/abd-2029-yilina-kadar-6-gw-offshore-ruzgar-kapasitesi-ilave-edecek-500x305.jpeg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/07\/abd-2029-yilina-kadar-6-gw-offshore-ruzgar-kapasitesi-ilave-edecek-80x50.jpeg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>the U.S. Energy Information Administration (EIA) said in a report on Thursday.<\/h2>\n<p>While the Biden administration has set a goal of reaching <strong>30 GW<\/strong> offshore capacity by<strong> 2030<\/strong>, from just <strong>42 megawatts<\/strong> currently with <strong>2 small projects<\/strong>, the Biden administration noted that projects include the <strong>New Jersey, Maryland<\/strong> and <strong>Virginia<\/strong> coasts and <strong>Lake Erie<\/strong> near <strong>Cleveland, Ohio.<\/strong><\/p>\n<p><strong>The White House<\/strong> said earlier this month that the Biden administration plans to partner with <strong>11 East Coast states<\/strong> to accelerate the development of<strong> offshore wind facilities<\/strong> and create jobs for the industry by supporting a <strong>local supply chain.<\/strong><\/p>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Power plant developers and operators plan to install more than 6 gigawatts of offshore wind capacity at sites mostly along the U.S. eastern seaboard over the next seven years, the U.S. Energy Information Administration (EIA) said in a report on Thursday. While the Biden administration has set a goal of reaching 30 GW offshore capacity [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":158934,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[64043,104690,104476,85368,5353,46156,37306,46159,104477,66248,474,5320,104691,104692],"views":547,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/158931"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=158931"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/158931\/revisions"}],"predecessor-version":[{"id":158936,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/158931\/revisions\/158936"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/158934"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=158931"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=158931"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=158931"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}