{"id":158670,"date":"2022-07-06T12:22:02","date_gmt":"2022-07-06T09:22:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=158670"},"modified":"2022-07-06T12:22:02","modified_gmt":"2022-07-06T09:22:02","slug":"borusan-cat-2022-sonu-guneste-kurulu-gucunu-7-mwin-uzerine-cikaracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/borusan-cat-2022-sonu-guneste-kurulu-gucunu-7-mwin-uzerine-cikaracak\/","title":{"rendered":"(Turkish) &#8217;Borusan Cat&#8217; 2022 Sonu G\u00fcne\u015f&#8217;te Kurulu G\u00fcc\u00fcn\u00fc 7 MW&#8217;\u0131n \u00dczerine \u00c7\u0131karacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/158670\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>\u201cDaha \u0130yi Bir D\u00fcnya \u0130\u00e7in \u00c7\u00f6z\u00fcm \u00dcretiriz\u201d anlay\u0131\u015f\u0131yla T\u00fcrkiye, Azerbaycan, G\u00fcrcistan, Kazakistan, K\u0131rg\u0131zistan ve Uzak Do\u011fu Rusya olmak \u00fczere 6 \u00fclkede operasyonlar\u0131n\u0131 y\u00fcr\u00fcten Borusan Cat, \u00f6zellikle \u00fcretim sekt\u00f6r\u00fcn\u00fc daha s\u00fcrd\u00fcr\u00fclebilir k\u0131lan GES projeleri alan\u0131nda iddias\u0131n\u0131 her ge\u00e7en g\u00fcn art\u0131r\u0131rken 2022 y\u0131l sonunda g\u00fcne\u015f enerjisi kurulu g\u00fcc\u00fcn\u00fc 7 MW \u00fczerine \u00e7\u0131karmay\u0131 ama\u00e7l\u0131yor.<\/h2>\n<p><em>Borusan Cat Enerji ve Ula\u015f\u0131m End\u00fcstrisi \u0130cra Kurulu \u00dcyesi<\/em> <strong>Harun Ak\u00e7\u0131nar<\/strong>, son<strong> 8 y\u0131lda<\/strong> T\u00fcrkiye\u2019nin <strong>8.000 MW<\/strong> \u00fczerinde bir kurulu g\u00fcce ula\u015ft\u0131\u011f\u0131n\u0131, <strong>2022 y\u0131l\u0131nda<\/strong> duyurulan <strong>yeni te\u015fviklerle<\/strong> pek \u00e7ok sanayii \u015firketinin <strong>GES\u2019e olan ilgisinin artt\u0131\u011f\u0131n\u0131<\/strong> ifade ederken Borusan Cat olarak, bu alana yat\u0131r\u0131m <img loading=\"lazy\" class=\"alignright wp-image-158672\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/07\/borusan-cat-2022-sonu-guneste-kurulu-gucunu-7-mwin-uzerine-cikaracak.jpg\" alt=\"\" width=\"320\" height=\"233\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/07\/borusan-cat-2022-sonu-guneste-kurulu-gucunu-7-mwin-uzerine-cikaracak.jpg 491w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/07\/borusan-cat-2022-sonu-guneste-kurulu-gucunu-7-mwin-uzerine-cikaracak-300x218.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/07\/borusan-cat-2022-sonu-guneste-kurulu-gucunu-7-mwin-uzerine-cikaracak-69x50.jpg 69w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>yapmay\u0131 d\u00fc\u015f\u00fcnen firmalara <strong>\u00f6zel projeler geli\u015ftirdiklerini<\/strong> ve s\u00fcrecin ba\u015f\u0131ndan sonuna <strong>komple bir hizmet<\/strong> sunduklar\u0131n\u0131 belirten Ak\u00e7\u0131nar <span style=\"text-decoration: underline;\">\u015fu de\u011ferlendirmeleri yapt\u0131:<\/span><\/p>\n<p><em>\u201cGES alan\u0131ndaki \u00e7al\u0131\u015fmalar\u0131m\u0131z\u0131 h\u0131zland\u0131rarak 2022 y\u0131l\u0131nda \u00e7ok \u00f6nemli iki projeye imza att\u0131k. Bu projelerimizden Borusan Cat Adana B\u00f6lge Binas\u0131 <strong>End\u00fcstriyel \u00c7at\u0131 GES<\/strong> i\u00e7in<strong> 136.6kWp<\/strong> g\u00fcc\u00fcnde, <strong>304<\/strong> adet <strong>450Wp<\/strong> <strong>CAT PV paneli<\/strong> kulland\u0131k. \u0130lk y\u0131l i\u00e7in yakla\u015f\u0131k <strong>172.3 kWh<\/strong>\u2019l\u0131k enerji \u00fcretimi \u00f6ng\u00f6rd\u00fc\u011f\u00fcm\u00fcz bu proje ile y\u0131lda yakla\u015f\u0131k <strong>72 ton karbon emisyonunun<\/strong> \u00f6n\u00fcne ge\u00e7ece\u011fiz. Y\u0131l i\u00e7erisinde ger\u00e7ekle\u015ftirdi\u011fimiz di\u011fer projemizi ise <strong>Adana\u2019da<\/strong> yer alan <strong>Do\u011fu\u015f Fiberglas \u015firketi<\/strong> i\u00e7in geli\u015ftirdik. Do\u011fu\u015f Fiberglas Adana <strong>End\u00fcstriyel \u00c7at\u0131 GES<\/strong> projemizde <strong>534kWp<\/strong> g\u00fcc\u00fcnde, <strong>1187 adet<\/strong> <strong>450Wp CAT PV panel<\/strong> kulland\u0131k. Bu projemizle de ilk y\u0131l i\u00e7in yakla\u015f\u0131k <strong>673.9 kWh<\/strong> enerji \u00fcretimini sa\u011flayarak y\u0131lda yakla\u015f\u0131k<strong> 280 ton karbon emisyonunu<\/strong> engellemi\u015f olaca\u011f\u0131z.<\/em><\/p>\n<p><em>\u015eirketimizin <strong>s\u00fcrd\u00fcr\u00fclebilirli\u011fe katk\u0131 sa\u011flama<\/strong> misyonu ve t\u00fcm payda\u015flar\u0131m\u0131z\u0131<strong> daha s\u00fcrd\u00fcr\u00fclebilir k\u0131lma anlay\u0131\u015f\u0131<\/strong> do\u011frultusunda \u00f6nemli bir g\u00fcndemimiz bulunuyor. Bu do\u011frultuda m\u00fc\u015fterilerimizin ihtiya\u00e7lar\u0131na tam olarak hitap eden<strong> anahtar teslim proje s\u00fcre\u00e7leri<\/strong> tasarl\u0131yor ve uyguluyoruz. Projelerimizde <strong>Cat panellerinin<\/strong> yan\u0131 s\u0131ra <strong>Tier I panel \u00fcreticileri<\/strong>yle de i\u015f birlikleri ger\u00e7ekle\u015ftirebiliyoruz. \u00d6n\u00fcm\u00fczdeki s\u00fcre\u00e7te hedefimiz daha fazla \u00fcretici firma ile<strong> projeler \u00fcreterek<\/strong> bu alandaki <strong>kurulu g\u00fcc\u00fcm\u00fcz\u00fc art\u0131rmak<\/strong> olacak.\u201d<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u201cDaha \u0130yi Bir D\u00fcnya \u0130\u00e7in \u00c7\u00f6z\u00fcm \u00dcretiriz\u201d anlay\u0131\u015f\u0131yla T\u00fcrkiye, Azerbaycan, G\u00fcrcistan, Kazakistan, K\u0131rg\u0131zistan ve Uzak Do\u011fu Rusya olmak \u00fczere 6 \u00fclkede operasyonlar\u0131n\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":158674,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[104569,104570,79882,20026,2206],"views":201,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/158670"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=158670"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/158670\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/158674"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=158670"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=158670"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=158670"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}