{"id":15819,"date":"2013-09-26T10:34:17","date_gmt":"2013-09-26T07:34:17","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=15819"},"modified":"2013-09-26T10:34:17","modified_gmt":"2013-09-26T07:34:17","slug":"bucan-enerjiden-ankaraya-11-mwlik-caltepe-hes-projesi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bucan-enerjiden-ankaraya-11-mwlik-caltepe-hes-projesi\/","title":{"rendered":"(Turkish) Bucan Enerji\u2019den Ankara\u2019ya 11 MW\u2019l\u0131k \u00c7altepe HES Projesi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/15819\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Bucan Enerji Elektrik \u00dcretim \u0130n\u015faat San. Ve Tic. Ltd. \u015eti., Ankara Nall\u0131han\u2019da kuraca\u011f\u0131 \u00c7altepe Hidroelektrik Santrali (HES) i\u00e7in \u00e7al\u0131\u015fmalara ba\u015flad\u0131.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/guris-sarikavak-hes-i-satin-aldi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-14207\" title=\"bucan-enerji-den-ankara-ya-11-mwlik-caltepe-hes-projesi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/guris-sarikavak-hes-i-satin-aldi-300x217.jpg\" alt=\"\" width=\"300\" height=\"217\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/guris-sarikavak-hes-i-satin-aldi-300x217.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/guris-sarikavak-hes-i-satin-aldi-500x362.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/guris-sarikavak-hes-i-satin-aldi-69x50.jpg 69w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/guris-sarikavak-hes-i-satin-aldi.jpg 650w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>\u015eirket, projesi i\u00e7in \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) s\u00fcrecini ba\u015flat\u0131rken, rapora ili\u015fkin incelemeler ba\u015flat\u0131ld\u0131. Proje i\u00e7in EPDK\u2019dan da lisans al\u0131nmas\u0131 ile 2 y\u0131l s\u00fcrmesi hedeflenen in\u015faata ba\u015flanmas\u0131 hedefleniyor.<\/p>\n<p><strong>SANTRAL\u2019\u0130N KURULU G\u00dcC\u00dc 11 MW<\/strong><\/p>\n<p>Ankara \u0130li, Nall\u0131han \u0130l\u00e7esi s\u0131n\u0131rlar\u0131 i\u00e7erisinde, Alada\u011f \u00e7ay\u0131 \u00fczerinde enerji \u00fcretim ama\u00e7l\u0131 kurulacak \u00c7altepe Reg\u00fclat\u00f6r\u00fc ve Hidroelektrik Santrali\u2019nin kurulu g\u00fcc\u00fc, 11,25 (2&#215;5,625) MWm \/ 11,00 MWe olarak planland\u0131.<\/p>\n<p>Nehir Tipi Santral olarak hedeflenen proje kapsam\u0131nda y\u0131ll\u0131k \u00fcretilecek firm (g\u00fcvenilir) enerji, 5,758 GWh, sekonder (ikincil) enerji ise 17,942 GWh olacak. Hidroelektrik Santrali mevcut durumdaki ak\u0131mlarla toplam 23,700 GWh\/y\u0131l enerji \u00fcretecek.<\/p>\n<p>Proje servis \u00f6mr\u00fc 50 y\u0131l olarak \u00f6ng\u00f6r\u00fcld\u00fc.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/bucan-enerjiden-ankaraya-11-mwlik-caltepe-hes-proj_4975.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Bucan Enerji Elektrik \u00dcretim \u0130n\u015faat San. Ve Tic. Ltd. \u015eti., Ankara Nall\u0131han\u2019da kuraca\u011f\u0131 \u00c7altepe Hidroelektrik Santrali (HES) i\u00e7in \u00e7al\u0131\u015fmalara ba\u015flad\u0131. \u015eirket, projesi i\u00e7in [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14207,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[2674,9008,9009,2878,4275,63,67,1009,165,18,35370,1090,9010,9011],"views":1534,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/15819"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=15819"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/15819\/revisions"}],"predecessor-version":[{"id":15820,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/15819\/revisions\/15820"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/14207"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=15819"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=15819"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=15819"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}