{"id":158169,"date":"2022-06-28T06:34:07","date_gmt":"2022-06-28T03:34:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=158169"},"modified":"2022-06-28T06:42:27","modified_gmt":"2022-06-28T03:42:27","slug":"altinyildiz-classics-cati-gunes-santrali-ile-enerjisini-gunesten-alacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/altinyildiz-classics-cati-gunes-santrali-ile-enerjisini-gunesten-alacak\/","title":{"rendered":"(Turkish) &#8217;Alt\u0131ny\u0131ld\u0131z Classics&#8217; \u00c7at\u0131 G\u00fcne\u015f Santrali ile Enerjisini G\u00fcne\u015ften Alacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/158169\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>S\u00fcrd\u00fcr\u00fclebilir bir d\u00fcnya i\u00e7in ye\u015fil ad\u0131mlar atan Alt\u0131ny\u0131ld\u0131z Classics, kendi elektri\u011fini \u00fcretti\u011fi \u201cYe\u015fil \u00c7at\u0131\u201d projesini hayata ge\u00e7irerek \u0130zmir Torbal\u0131\u2019da yer alan genel merkezinde 10.000 m2&#8217;lik G\u00fcne\u015f Enerjisi Santrali (GES) ile enerjisini \u00fcretiyor.<\/strong><\/h2>\n<p><strong>\u201cD\u00fcnya Ya\u015fas\u0131n Diye\u201d<\/strong> ileti\u015fimi kapsam\u0131nda daha s\u00fcrd\u00fcr\u00fclebilir bir d\u00fcnya i\u00e7in uzun s\u00fcredir pek \u00e7ok \u00e7al\u0131\u015fmaya imza atan Alt\u0131ny\u0131ld\u0131z Classics, g\u00fcne\u015f enerjisiyle kendi elektri\u011fini \u00fcretti\u011fi <strong>\u201cYe\u015fil \u00c7at\u0131\u201d projesini<\/strong> hayata ge\u00e7irdi. <strong>\u0130zmir Torbal\u0131\u2019da<\/strong> yer alan genel merkezinin <strong>10.000 metrekarelik<\/strong> <img loading=\"lazy\" class=\"alignright wp-image-158171\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/altinyildiz-classics-cati-gunes-santrali-ile-enerjisini-gunesten-alacak.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/altinyildiz-classics-cati-gunes-santrali-ile-enerjisini-gunesten-alacak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/altinyildiz-classics-cati-gunes-santrali-ile-enerjisini-gunesten-alacak-300x201.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/altinyildiz-classics-cati-gunes-santrali-ile-enerjisini-gunesten-alacak-500x335.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/altinyildiz-classics-cati-gunes-santrali-ile-enerjisini-gunesten-alacak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/altinyildiz-classics-cati-gunes-santrali-ile-enerjisini-gunesten-alacak-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>alan\u0131nda faaliyete ge\u00e7irilen <strong>G\u00fcne\u015f Enerjisi Santrali (GES) projesiyle<\/strong> may\u0131s ay\u0131ndan itibaren <strong>1.7 megawatt<\/strong> kurulu g\u00fc\u00e7 ile enerji \u00fcretimini ger\u00e7ekle\u015ftirdi. Bu sayede<strong> 1177 ki\u015fiye istihdam<\/strong> sa\u011flanan fabrika ve merkez ofisin t\u00fcm elektrik ihtiyac\u0131 ile birlikte <strong>108 adet<\/strong> ma\u011fazas\u0131n\u0131n da <strong>elektrik ihtiyac\u0131n\u0131n<\/strong> <strong>%35<\/strong>\u2019ini kar\u015f\u0131lam\u0131\u015f oldu.<\/p>\n<p><strong>Alt\u0131ny\u0131ld\u0131z Classics\u2019in<\/strong> merkezdeki <strong>ayl\u0131k\/y\u0131ll\u0131k ortalama<\/strong> elektrik t\u00fcketimi<strong> 120.000 kW<\/strong> saat iken, fabrika binas\u0131 ve merkez ofisin t\u00fcm \u00e7at\u0131s\u0131 boyunca <strong>10.000 m2&#8217;lik<\/strong> alana kurulan g\u00fcne\u015f panelleriyle <strong>330.000 kW saat \/ ay<\/strong>\u00a0elektrik \u00fcretildi. <strong>GES ile elektrik \u00fcretimi<\/strong> i\u00e7in bir y\u0131l \u00f6nce harekete ge\u00e7en marka, bu s\u00fcre i\u00e7erisinde h\u0131zla projeyi tamamlayarak <strong>elektrik \u00fcretimine<\/strong> ba\u015flad\u0131. Alt\u0131ny\u0131ld\u0131z Classics\u2019in hedefi en fazla <strong>2 y\u0131l<\/strong> i\u00e7erisinde T\u00fcrkiye \u00e7ap\u0131ndaki t\u00fcm ma\u011fazalar\u0131n\u0131n <strong>elektri\u011fini g\u00fcne\u015f enerjisiyle<\/strong> sa\u011flamak.<strong> \u201cYe\u015fil \u00c7at\u0131\u201d projesi<\/strong>nin<strong> may\u0131s ay\u0131nda<\/strong> faaliyete ge\u00e7erek tamamen <strong>temiz enerji<\/strong> kullan\u0131lmas\u0131yla do\u011faya sal\u0131nan karbon emisyonu<strong> 1.948.320 kg<\/strong> azalt\u0131larak <strong>4740 a\u011fa\u00e7 \/ 13.000 m2<\/strong> b\u00fcy\u00fckl\u00fc\u011f\u00fcnde ye\u015fil alan kurtar\u0131ld\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. S\u00fcrd\u00fcr\u00fclebilir bir d\u00fcnya i\u00e7in ye\u015fil ad\u0131mlar atan Alt\u0131ny\u0131ld\u0131z Classics, kendi elektri\u011fini \u00fcretti\u011fi \u201cYe\u015fil \u00c7at\u0131\u201d projesini hayata ge\u00e7irerek \u0130zmir Torbal\u0131\u2019da yer alan genel [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":158171,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[104332,104331,36606,18,45418,2206,842],"views":170,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/158169"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=158169"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/158169\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/158171"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=158169"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=158169"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=158169"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}