{"id":158066,"date":"2022-06-25T11:49:08","date_gmt":"2022-06-25T08:49:08","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=158066"},"modified":"2022-06-25T11:51:33","modified_gmt":"2022-06-25T08:51:33","slug":"hsa-enerji-manisa-osbdeki-tesisinde-kapasiteyi-yillik-500-mw-a-yukseltti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/hsa-enerji-manisa-osbdeki-tesisinde-kapasiteyi-yillik-500-mw-a-yukseltti\/","title":{"rendered":"(Turkish) &#8217;HSA Enerji&#8217; Manisa OSB\u2019deki Tesisinde Kapasiteyi 500 MW\u2019a \u00c7\u0131kard\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/158066\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Manisa OSB<\/strong>\u2019de bulunan HSA Enerji\u2019nin g\u00fcne\u015f paneli fabrikas\u0131 <strong>01 Eyl\u00fcl 2021<\/strong> y\u0131l\u0131nda<strong> seri \u00fcretime<\/strong> ba\u015flam\u0131\u015ft\u0131. \u0130lk faz\u0131 <strong>250 MW\/y\u0131l<\/strong> olarak faaliyete ge\u00e7en fabrika <strong>Haziran 2022\u2019de<\/strong> kapasitesini <strong>2 kat\u0131na<\/strong> \u00e7\u0131kartarak <strong>500 MW\/y\u0131l<\/strong> olarak \u00fcretimini s\u00fcrd\u00fcrecek. Kapasite art\u0131\u015f\u0131 ayn\u0131 fabrika i\u00e7erisinde ger\u00e7ekle\u015fecek olup fabrika tek \u00fcretim hatt\u0131 ile <strong>500 MW<\/strong> \u00fcretim yapacak.<\/h2>\n<h3><strong>Artan Taleplere \u00c7\u00f6z\u00fcm Sunuluyor<\/strong><\/h3>\n<p><em><img loading=\"lazy\" class=\"alignright wp-image-158068\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/hsa-enerji-manisa-osbdeki-tesisinde-kapasiteyi-yillik-500-mw-a-yukseltti-2.jpg\" alt=\"\" width=\"300\" height=\"236\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/hsa-enerji-manisa-osbdeki-tesisinde-kapasiteyi-yillik-500-mw-a-yukseltti-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/hsa-enerji-manisa-osbdeki-tesisinde-kapasiteyi-yillik-500-mw-a-yukseltti-2-300x236.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/hsa-enerji-manisa-osbdeki-tesisinde-kapasiteyi-yillik-500-mw-a-yukseltti-2-500x393.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/hsa-enerji-manisa-osbdeki-tesisinde-kapasiteyi-yillik-500-mw-a-yukseltti-2-64x50.jpg 64w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>HSA Enerji Sat\u0131\u015f ve Pazarlama Direkt\u00f6r\u00fc<\/em> <strong>Mehmet Ayba\u015f<\/strong> bu kapasite art\u0131\u015f\u0131 hakk\u0131nda <em>\u201cUlusal \u00f6l\u00e7ekte <strong>geni\u015f \u00fcretim kapasitesine<\/strong> sahip olan, g\u00fcne\u015f enerji sekt\u00f6r\u00fcnde<strong> kalitesi<\/strong> ve <strong>teknolojisi<\/strong> ile \u00f6ne \u00e7\u0131kan HSA Enerji, \u00fcretti\u011fi <strong>Mavi \u00c7am G\u00fcne\u015f Panelleri<\/strong> ve <strong>JA Solar panelleri<\/strong>ni daha fazla g\u00fcne\u015f enerji santrali \u00e7\u00f6z\u00fcmlerine sunmak i\u00e7in mevcut kapasitesini art\u0131rd\u0131. Bu ba\u011flamda da <strong>mevcut kapasite<\/strong> art\u0131\u015f\u0131m\u0131za ilave olarak <strong>2&#8217;inci fabrikam\u0131z\u0131n in\u015faat\u0131na<\/strong> ba\u015flad\u0131k ve <strong>2023 y\u0131l\u0131nda<\/strong> toplamda <strong>1 GW\/Y\u0131l<\/strong> \u00fcretim kapasitesi ile<strong>\u00a0ulusal<\/strong> ve<strong> uluslararas\u0131 pazara<\/strong> hizmet etmeyi planl\u0131yoruz.\u201d<\/em> ifadelerini kulland\u0131.<\/p>\n<h3><strong>2&#8217;inci Fabrika \u0130\u00e7in 160 Milyon TL Yat\u0131r\u0131m<\/strong><\/h3>\n<p><strong>HSA Enerji<\/strong>\u2019nin 2&#8217;inci fabrikas\u0131, <strong>Manisa OSB<\/strong>\u2019de yer alan <strong>ilk fabrikas\u0131n\u0131n hemen yan\u0131nda<\/strong> kurulacak. Yat\u0131r\u0131m b\u00fct\u00e7esi <strong>160 milyon TL<\/strong> olan bu art\u0131\u015f ile birlikte yine <strong>son teknoloji<\/strong> ve<strong> tam otomasyon \u00fcretim hatt\u0131yla<\/strong> <strong>Mavi \u00c7am ve JA Solar panelleri<\/strong> \u00fcretim kapasitesi <strong>1 GW\/y\u0131l<\/strong>\u2019a ula\u015fm\u0131\u015f olacak. Sadece T\u00fcrkiye\u2019de de\u011fil <strong>global piyasada<\/strong> da hedeflerine ula\u015fmak i\u00e7in yat\u0131r\u0131mlar\u0131na s\u00fcrd\u00fcren HSA Enerji, b\u00fcy\u00fcme ad\u0131mlar\u0131n\u0131 sa\u011flamla\u015ft\u0131rarak <strong>pazar pay\u0131n\u0131 da art\u0131rmay\u0131<\/strong> s\u00fcrd\u00fcr\u00fcyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Manisa OSB\u2019de bulunan HSA Enerji\u2019nin g\u00fcne\u015f paneli fabrikas\u0131 01 Eyl\u00fcl 2021 y\u0131l\u0131nda seri \u00fcretime ba\u015flam\u0131\u015ft\u0131. \u0130lk faz\u0131 250 MW\/y\u0131l olarak faaliyete ge\u00e7en [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":158069,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[2206,8255,98765,104267,68120,81274,104266],"views":207,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/158066"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=158066"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/158066\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/158069"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=158066"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=158066"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=158066"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}