{"id":157691,"date":"2022-06-19T19:22:28","date_gmt":"2022-06-19T16:22:28","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=157691"},"modified":"2022-06-19T19:25:39","modified_gmt":"2022-06-19T16:25:39","slug":"eaton-microsoft-ile-olan-grid-interactive-ups-teknolojisi-is-birligini-buyutuyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/eaton-microsoft-ile-olan-grid-interactive-ups-teknolojisi-is-birligini-buyutuyor\/","title":{"rendered":"(Turkish) Eaton Grid-Interactive UPS Teknolojisi \u0130\u015f Birli\u011fini B\u00fcy\u00fct\u00fcyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/157691\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Ak\u0131ll\u0131 g\u00fc\u00e7 y\u00f6netimi \u015firketi Eaton, d\u00fcnya genelindeki temel segmentlerde Energy Aware kesintisiz g\u00fc\u00e7 kayna\u011f\u0131 (UPS) sistemi teknolojisinin hayata ge\u00e7irilmesi amac\u0131yla Microsoft ile yap\u0131lan i\u015f birli\u011finin b\u00fcy\u00fcyece\u011fini a\u00e7\u0131klad\u0131.<\/h2>\n<p>Bu b\u00fcy\u00fcme, end\u00fcstrideki<strong> dijital d\u00f6n\u00fc\u015f\u00fcm, s\u00fcrd\u00fcr\u00fclebilirlik<\/strong> ve<strong> enerji ge\u00e7i\u015fi<\/strong> gibi temel geli\u015fmelere hitap etmek amac\u0131yla<strong> Eaton<\/strong> ve<strong> Microsoft<\/strong> aras\u0131nda yap\u0131lm\u0131\u015f olan yeni stratejik \u00e7er\u00e7eve anla\u015fmas\u0131 b\u00fcnyesinde ger\u00e7ekle\u015fiyor.<\/p>\n<p>Bu stratejik \u00e7er\u00e7eve anla\u015fmas\u0131n\u0131n temel amac\u0131, Eaton\u2019\u0131n kendi geli\u015ftirdi\u011fi <strong>EnergyAware UPS teknolojisi&#8217;<\/strong>nin Microsoft projelerinde kullan\u0131lmas\u0131. Bu<strong> UPS \u00fcnitesinin<\/strong> temel fonksiyonu, <strong>kritik g\u00fc\u00e7 <img loading=\"lazy\" class=\"alignright wp-image-157693\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/eaton-microsoft-ile-olan-grid-interactive-ups-teknolojisi-is-birligini-buyutuyor.jpeg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/eaton-microsoft-ile-olan-grid-interactive-ups-teknolojisi-is-birligini-buyutuyor.jpeg 800w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/eaton-microsoft-ile-olan-grid-interactive-ups-teknolojisi-is-birligini-buyutuyor-300x200.jpeg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/eaton-microsoft-ile-olan-grid-interactive-ups-teknolojisi-is-birligini-buyutuyor-768x512.jpeg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/eaton-microsoft-ile-olan-grid-interactive-ups-teknolojisi-is-birligini-buyutuyor-500x333.jpeg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/eaton-microsoft-ile-olan-grid-interactive-ups-teknolojisi-is-birligini-buyutuyor-75x50.jpeg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/eaton-microsoft-ile-olan-grid-interactive-ups-teknolojisi-is-birligini-buyutuyor-450x300.jpeg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>uygulamalar\u0131<\/strong> ve tesisler i\u00e7in <strong>back-up g\u00fc\u00e7 korumas\u0131<\/strong> sa\u011flaman\u0131n yan\u0131 s\u0131ra, <strong>g\u00fc\u00e7 kesintilerini<\/strong> veya <strong>g\u00fc\u00e7 kalitesine<\/strong> dair sorunlar\u0131 \u00f6nlemek. Eaton ve Microsoft, belirli bir s\u00fcredir devam eden yak\u0131n i\u015f birli\u011finin bir sonucu olarak, <strong>UPS \u00fcnitesine<\/strong> \u00f6zel yetenekler ekledi. Bu \u00f6zel yetenekler sayesinde, kullan\u0131c\u0131lar bu \u00fcniteleri, \u015febekeleri kendi i\u00e7inde \u00fcretilen <strong>yenilenebilir enerjiyle destekleyen<\/strong> bir <strong>enerji kayna\u011f\u0131<\/strong> olarak kullan\u0131labilecek.<\/p>\n<p>B\u00f6ylece, \u015febeke operat\u00f6rlerine esneklik kazand\u0131rmak amac\u0131yla, Microsoft taraf\u0131ndan i\u015fletilen veri merkezleri de dahil olmak \u00fczere yeni nesil <strong>\u201cgrid interactive\u201d<\/strong> veri merkezlerinin olu\u015fturulmas\u0131na zemin haz\u0131rlanacak. \u015eebekeye esneklik kazand\u0131rmak, veri merkezlerinin yeterince kullan\u0131lmayan <strong>varl\u0131klar\u0131n\u0131n kazanca d\u00f6n\u00fc\u015ft\u00fcrmesi<\/strong> i\u00e7in bir f\u0131rsatt\u0131r. \u00d6rne\u011fin,<strong> enerji depolanabilecek<\/strong> ve <strong>yenilenebilir enerji kapasitesi<\/strong> art\u0131\u015f g\u00f6sterdik\u00e7e ve <strong>\u015febeke fosil yak\u0131t t\u00fcketimi<\/strong>yle ili\u015fkili ataletini kaybettik\u00e7e \u015febeke operat\u00f6rlerinin gitgide daha fazla ihtiya\u00e7 duyaca\u011f\u0131 <strong>h\u0131zl\u0131 frekans de\u011fi\u015fimlerine<\/strong> anl\u0131k h\u0131zl\u0131 yan\u0131tlar verilmesi sa\u011flanabilecektir.<\/p>\n<p>Eaton Enerji Ge\u00e7i\u015fi ve Dijitalizasyon B\u00f6l\u00fcm\u00fc K\u0131demli Ba\u015fkan Yard\u0131mc\u0131s\u0131 <strong>Craig McDonnell<\/strong>, bunun \u00f6nemini: <em>\u201cGrid-interactive UPS \u00fcnitesi, enerjinin \u015febeke seviyesinde<strong> karbonsuzla\u015ft\u0131r\u0131lmas\u0131na<\/strong> yard\u0131mc\u0131 oluyor. B\u00f6ylece, <strong>\u015febekenin s\u00fcrd\u00fcr\u00fclebilirli\u011fi<\/strong> veri merkezinin beklentilerini dahi a\u015facak. Bu da veri merkezinin \u00e7evre \u00fczerinde b\u0131rakt\u0131\u011f\u0131 genel etki profili i\u00e7erisindeki <strong>enerji y\u00f6netimi<\/strong> bak\u0131m\u0131ndan adeta \u00e7\u0131\u011f\u0131r a\u00e7acak bir geli\u015fme.\u201d<\/em> ifadelerini kullanarak a\u00e7\u0131klad\u0131.<\/p>\n<p><em>Microsoft Veri Merkezi Ara\u015ft\u0131rma Direkt\u00f6r\u00fc<\/em> <strong>Sean James<\/strong> ise \u015funlar\u0131 <span style=\"text-decoration: underline;\">dile getirdi:<\/span> <em>\u201cGrid interactive (\u015febeke etkile\u015fimli) bir veri merkezi,<strong> elektrik sisteminin<\/strong> yaln\u0131zca m\u00fc\u015fterilerin<strong> BT verilerini<\/strong> ve uygulamalar\u0131n\u0131 koruma de\u011fil, ayn\u0131 zamanda<strong> iletim sistemi operat\u00f6r\u00fcne<\/strong> ve<strong> \u015febekeye de\u011ferli elektrik hizmetleri sa\u011flama<\/strong> i\u015flevi g\u00f6rd\u00fc\u011f\u00fc bir yerdir. Bu yard\u0131mc\u0131 hizmetlerin, \u015febekelerin b\u00fcy\u00fck miktarda <strong>de\u011fi\u015fken yenilenebilir enerjiyi y\u00f6netebilmelerine<\/strong> yard\u0131mc\u0131 olmak ad\u0131na <strong>gitgide daha kritik bir rol<\/strong> \u00fcstlenmesi ka\u00e7\u0131n\u0131lmaz&#8221;.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ak\u0131ll\u0131 g\u00fc\u00e7 y\u00f6netimi \u015firketi Eaton, d\u00fcnya genelindeki temel segmentlerde Energy Aware kesintisiz g\u00fc\u00e7 kayna\u011f\u0131 (UPS) sistemi teknolojisinin hayata ge\u00e7irilmesi amac\u0131yla Microsoft ile [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":157693,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,157],"tags":[73071,31910,45735,104107,104108,11568,104109,1296,8886],"views":75,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/157691"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=157691"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/157691\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/157693"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=157691"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=157691"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=157691"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}