{"id":157667,"date":"2022-06-18T14:27:40","date_gmt":"2022-06-18T11:27:40","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=157667"},"modified":"2022-06-18T14:28:57","modified_gmt":"2022-06-18T11:28:57","slug":"avustralya-eyaletinden-elektrik-sebekesine-850-milyon-dolarlik-yatirim","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/avustralya-eyaletinden-elektrik-sebekesine-850-milyon-dolarlik-yatirim\/","title":{"rendered":"Australian State to Invest $850 mln in Power Grid"},"content":{"rendered":"<p><\/p>\n<h2 class=\"text__text__1FZLe text__dark-grey__3Ml43 text__regular__2N1Xr text__large__nEccO body__base__22dCE body__large_body__FV5_X article-body__element__2p5pI\" data-testid=\"paragraph-0\">Australia&#8217;s New South Wales state on Friday said it would invest A$1.2 billion ($850 million) in new transmission lines over 10 years to speed up connections to the grid for new renewable energy projects as the state looks to shift to greener power.<\/h2>\n<p class=\"text__text__1FZLe text__dark-grey__3Ml43 text__regular__2N1Xr text__large__nEccO body__base__22dCE body__large_body__FV5_X article-body__element__2p5pI\" data-testid=\"paragraph-1\"><img loading=\"lazy\" class=\"alignright wp-image-157670\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/avustralya-eyaletinden-elektrik-sebekesine-850-milyon-dolarlik-yatirim.jpg\" alt=\"\" width=\"320\" height=\"211\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/avustralya-eyaletinden-elektrik-sebekesine-850-milyon-dolarlik-yatirim.jpg 960w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/avustralya-eyaletinden-elektrik-sebekesine-850-milyon-dolarlik-yatirim-300x198.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/avustralya-eyaletinden-elektrik-sebekesine-850-milyon-dolarlik-yatirim-768x507.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/avustralya-eyaletinden-elektrik-sebekesine-850-milyon-dolarlik-yatirim-500x330.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/avustralya-eyaletinden-elektrik-sebekesine-850-milyon-dolarlik-yatirim-76x50.jpg 76w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>State Treasurer Matt Kean said with the A$1.2 billion Transmission Acceleration Facility, the state hopes to attract least A$14 billion in private investment in transmission infrastructure.<\/p>\n<p class=\"text__text__1FZLe text__dark-grey__3Ml43 text__regular__2N1Xr text__large__nEccO body__base__22dCE body__large_body__FV5_X article-body__element__2p5pI\" data-testid=\"paragraph-2\">Australia is grappling with power and gas price spikes due to a string of outages at coal-fired plants, a cold snap which has driven up gas demand and record high global coal and gas prices.<\/p>\n<p class=\"text__text__1FZLe text__dark-grey__3Ml43 text__regular__2N1Xr text__large__nEccO body__base__22dCE body__large_body__FV5_X article-body__element__2p5pI\" data-testid=\"paragraph-3\">&#8220;Fast-tracking the construction of renewable energy is the best way to reduce our exposure to these risks and take advantage of cleaner, cheaper power sources,&#8221; Kean said in a statement.<\/p>\n<p class=\"text__text__1FZLe text__dark-grey__3Ml43 text__regular__2N1Xr text__large__nEccO body__base__22dCE body__large_body__FV5_X article-body__element__2p5pI\" data-testid=\"paragraph-4\">More than 50 large-scale renewable energy projects with capacity of 16,000 megawatts have been proposed in Australia&#8217;s most populous state, but many of them cannot go ahead without additional grid capacity.<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Australia&#8217;s New South Wales state on Friday said it would invest A$1.2 billion ($850 million) in new transmission lines over 10 years to speed up connections to the grid for new renewable energy projects as the state looks to shift to greener power. State Treasurer Matt Kean said with the A$1.2 billion Transmission Acceleration Facility, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":157670,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[43837,4599,104099,56393,3445,104098,104096,104101,104102,42466,104100,104097,104095,3866],"views":101,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/157667"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=157667"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/157667\/revisions"}],"predecessor-version":[{"id":157671,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/157667\/revisions\/157671"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/157670"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=157667"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=157667"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=157667"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}