{"id":157341,"date":"2022-06-13T11:44:11","date_gmt":"2022-06-13T08:44:11","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=157341"},"modified":"2022-06-13T11:55:32","modified_gmt":"2022-06-13T08:55:32","slug":"bim-in-6-inci-gunes-santrali-nin-kurulumu-samandira-deposuna-yapildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bim-in-6-inci-gunes-santrali-nin-kurulumu-samandira-deposuna-yapildi\/","title":{"rendered":"(Turkish) &#8217;B\u0130M&#8217;in 6. G\u00fcne\u015f Santrali\u2019nin Kurulumu Samand\u0131ra Deposu&#8217;na Yap\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/157341\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>\u0130klim de\u011fi\u015fikli\u011fiyle m\u00fccadeleye katk\u0131 sa\u011flamak \u00fczere yenilenebilir enerji yat\u0131r\u0131mlar\u0131n\u0131 da hayata ge\u00e7iren B\u0130M&#8217;in 6&#8217;\u0131nc\u0131 G\u00fcne\u015f Enerjisi Santrali\u2019nin (GES) kurulumu Samand\u0131ra deposunda tamamland\u0131.<\/h2>\n<p><strong>1,7 MW<\/strong> kurulu g\u00fcce sahip <strong>GES<\/strong> ile <strong>Samand\u0131ra deposu<\/strong>nun <strong>enerji t\u00fcketimi<\/strong>nin <strong>%100\u2019\u00fc<\/strong> g\u00fcne\u015ften kar\u015f\u0131lanacak. <strong>745 hanenin<\/strong> y\u0131ll\u0131k enerji t\u00fcketimine denk \u00fcretim ger\u00e7ekle\u015ftirecek olan <strong>g\u00fcne\u015f santrali<\/strong> <img loading=\"lazy\" class=\"alignright wp-image-157345\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/bim-in-6-inci-gunes-santrali-nin-kurulumu-samandira-deposuna-yapildi-2.jpg\" alt=\"\" width=\"320\" height=\"207\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/bim-in-6-inci-gunes-santrali-nin-kurulumu-samandira-deposuna-yapildi-2.jpg 478w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/bim-in-6-inci-gunes-santrali-nin-kurulumu-samandira-deposuna-yapildi-2-300x194.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/bim-in-6-inci-gunes-santrali-nin-kurulumu-samandira-deposuna-yapildi-2-77x50.jpg 77w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>ile<strong> karbon <\/strong><strong>sal\u0131m\u0131<\/strong>nda <strong>1.346 ton azalma<\/strong> elde edilecek olup <strong>16.500 a\u011fa\u00e7<\/strong> kazan\u0131m\u0131na denk oldu\u011fu da belirtildi.<\/p>\n<h3><strong>Karbon Sal\u0131m\u0131nda Y\u0131lda 8.030 Ton Azalma<\/strong><\/h3>\n<p>2020 y\u0131l\u0131nda <strong>Batman<\/strong>, ge\u00e7en y\u0131l<strong> \u0130stanbul Arnavutk\u00f6y, I\u011fd\u0131r<\/strong>, bu y\u0131l da <strong>Denizli, Konya<\/strong> ve <strong>Samand\u0131ra<\/strong>\u2019da bulunan <strong>depolar\u0131na g\u00fcne\u015f enerjisi sistemi<\/strong> kurulumu ger\u00e7ekle\u015ftiren B\u0130M, bu 6 deposunda enerji t\u00fcketiminin <strong>%100\u2019\u00fcn\u00fc<\/strong> <strong>GES\u2019<\/strong>lerden kar\u015f\u0131l\u0131yor.<\/p>\n<p><strong>Batman, Arnavutk\u00f6y, I\u011fd\u0131r, Denizli, Konya<\/strong> ve<strong> Samand\u0131ra depolar\u0131nda<\/strong> toplam g\u00fcc\u00fc <strong>9 MW<\/strong> olan GES\u2019ler <strong>5.000&#8217;den<\/strong> fazla hanenin <strong>y\u0131ll\u0131k enerji t\u00fcketimine denk<\/strong> \u00fcretim ger\u00e7ekle\u015ftirirken <strong>karbon sal\u0131m\u0131nda<\/strong> ise toplamda y\u0131ll\u0131k <strong>8.030 ton<\/strong> azalma olurken, <strong>120.000&#8217;in<\/strong> \u00fczerinde <strong>a\u011fa\u00e7 kazan\u0131m\u0131<\/strong> sa\u011flan\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130klim de\u011fi\u015fikli\u011fiyle m\u00fccadeleye katk\u0131 sa\u011flamak \u00fczere yenilenebilir enerji yat\u0131r\u0131mlar\u0131n\u0131 da hayata ge\u00e7iren B\u0130M&#8217;in 6&#8217;\u0131nc\u0131 G\u00fcne\u015f Enerjisi Santrali\u2019nin (GES) kurulumu Samand\u0131ra deposunda tamamland\u0131. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":157347,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[46776,2997,148,21886,45418,2206,1353,10921,2629,1245],"views":308,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/157341"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=157341"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/157341\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/157347"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=157341"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=157341"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=157341"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}