{"id":157287,"date":"2022-06-12T08:11:12","date_gmt":"2022-06-12T05:11:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=157287"},"modified":"2022-06-12T08:11:12","modified_gmt":"2022-06-12T05:11:12","slug":"saden-enerji-ege-bolgesinde-48-mwlik-res-kurulumu-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/saden-enerji-ege-bolgesinde-48-mwlik-res-kurulumu-yapacak\/","title":{"rendered":"(Turkish) &#8217;Saden Enerji&#8217; Ege B\u00f6lgesi&#8217;nde 48 MW\u2019l\u0131k RES Kurulumu Yapacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/157287\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Saden Enerji, Bal\u0131kesir \u0130vrindi&#8217;de ile \u0130zmir Bergama&#8217;da 48 <img loading=\"lazy\" class=\"alignright wp-image-157289\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/saden-enerji-ege-bolgesinde-48-mwlik-res-kurulumu-yapacak.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/saden-enerji-ege-bolgesinde-48-mwlik-res-kurulumu-yapacak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/saden-enerji-ege-bolgesinde-48-mwlik-res-kurulumu-yapacak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/saden-enerji-ege-bolgesinde-48-mwlik-res-kurulumu-yapacak-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/saden-enerji-ege-bolgesinde-48-mwlik-res-kurulumu-yapacak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/saden-enerji-ege-bolgesinde-48-mwlik-res-kurulumu-yapacak-450x300.jpg 450w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>MW kurulu g\u00fcce sahip Karaburun R\u00fczgar Enerji Santrali (RES) kurarak i\u015fletecek.<\/h2>\n<p>Kurulacak olan r\u00fczgar santralin 12 t\u00fcrbini \u0130zmir il s\u0131n\u0131rlar\u0131nda 4 r\u00fczgar t\u00fcrbini ise Bal\u0131kesir&#8217;de kurulacak. Santralde y\u0131ll\u0131k <strong>192 milyon kWh<\/strong> elektrik \u00fcretilece\u011fi tahmin edilirken \u00fcretilen enerji <em>Alibey RES TM ile <\/em>ulusal enterkonnekte sistemine ba\u011flanacak.<\/p>\n<p><strong>16 r\u00fczgar santrali<\/strong> t\u00fcrbininden olu\u015facak r\u00fczgar santrali yat\u0131r\u0131m\u0131n\u0131n yat\u0131r\u0131m bedeli ise<strong> 120 milyon TL<\/strong> olacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Saden Enerji, Bal\u0131kesir \u0130vrindi&#8217;de ile \u0130zmir Bergama&#8217;da 48 MW kurulu g\u00fcce sahip Karaburun R\u00fczgar Enerji Santrali (RES) kurarak i\u015fletecek. Kurulacak olan r\u00fczgar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":157289,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[103945,3613,18,2689,474,231,103944,842],"views":499,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/157287"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=157287"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/157287\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/157289"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=157287"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=157287"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=157287"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}