{"id":157197,"date":"2022-06-10T11:30:28","date_gmt":"2022-06-10T08:30:28","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=157197"},"modified":"2022-06-10T11:32:43","modified_gmt":"2022-06-10T08:32:43","slug":"tosyali-holding-tesisleri-nin-cati-ustu-gesi-140-mw-lik-guce-sahip-olacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tosyali-holding-tesisleri-nin-cati-ustu-gesi-140-mw-lik-guce-sahip-olacak\/","title":{"rendered":"(Turkish) Tosyal\u0131 Holding Tesislerinin \u00c7at\u0131 \u00dcst\u00fc GES&#8217;i 140 MW&#8217;l\u0131k G\u00fcce Sahip Olacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/157197\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Tosyal\u0131 Holding tesislerinde 632 bin metrekare alan \u00fczerinde kurulacak \u00e7at\u0131 \u00fcst\u00fc GES projesi toplamda 140 megawatt kurulu g\u00fcce sahip olurken 71 milyon dolar yat\u0131r\u0131m bedeli ile hayata ge\u00e7irilecek.<\/h2>\n<p>Proje, y\u0131ll\u0131k <strong>250 milyon kWh<\/strong>\u2019lik \u00fcretimiyle T\u00fcrkiye\u2019nin en fazla y\u0131ll\u0131k \u00fcretim ger\u00e7ekle\u015ftirilen <strong>\u00e7at\u0131 \u00fcst\u00fc g\u00fcne\u015f enerjisi santrali<\/strong> olacak. Bu sayede <strong>116.525.000 kg<\/strong> karbon sal\u0131m\u0131 engellenerek d\u00fcnyan\u0131n en <img loading=\"lazy\" class=\"alignright wp-image-157200\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/tosyali-holding-tesisleri-nin-cati-ustu-gesi-140-mw-lik-guce-sahip-olacak.jpg\" alt=\"tosyali-holding-tesisleri-nin-cati-ustu-gesi-140-mw-lik-guce-sahip-olacak\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/tosyali-holding-tesisleri-nin-cati-ustu-gesi-140-mw-lik-guce-sahip-olacak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/tosyali-holding-tesisleri-nin-cati-ustu-gesi-140-mw-lik-guce-sahip-olacak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/tosyali-holding-tesisleri-nin-cati-ustu-gesi-140-mw-lik-guce-sahip-olacak-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/tosyali-holding-tesisleri-nin-cati-ustu-gesi-140-mw-lik-guce-sahip-olacak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/tosyali-holding-tesisleri-nin-cati-ustu-gesi-140-mw-lik-guce-sahip-olacak-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>temiz \u00e7elik \u00fcretimi ger\u00e7ekle\u015ftirilecek. <strong>Tosyal\u0131 Holding<\/strong>\u2019in \u00e7e\u015fitli fabrika ve tesislerini kapsayan <strong>GES projesi<\/strong>\u00a0ayn\u0131 zamanda T\u00fcrkiye\u2019nin<strong> net s\u0131f\u0131r karbon<\/strong> hedefine ula\u015fmas\u0131na da katk\u0131 sa\u011flayacak.<\/p>\n<p>Konuya y\u00f6nelik bilgi veren <em>Garanti BBVA Genel M\u00fcd\u00fcr\u00fc<\/em><strong> Recep Ba\u015ftu\u011f<\/strong>, <em>\u201cBankalar\u0131n <strong>s\u00fcrd\u00fcr\u00fclebilir kalk\u0131nma<\/strong> konusunda\u00a0kritik role sahip oldu\u011funa inan\u0131yor ve <strong>iklim krizine kar\u015f\u0131<\/strong> \u00e7al\u0131\u015fmalar\u0131m\u0131za 15 y\u0131l\u0131 a\u015fk\u0131n s\u00fcredir devam ediyoruz. 2014\u2019ten bu yana <strong>proje finansman\u0131<\/strong> faaliyetlerimiz kapsam\u0131nda yeni <strong>elektrik \u00fcretimi yat\u0131r\u0131mlar\u0131na<\/strong> aktard\u0131\u011f\u0131m\u0131z toplam finansman tutar\u0131n\u0131n <strong>%100<\/strong>&#8216;\u00fcn\u00fc <strong>yenilenebilir enerji yat\u0131r\u0131mlar\u0131na<\/strong> y\u00f6nlendirdik. Bug\u00fcne kadar ger\u00e7ekle\u015ftirdi\u011fimiz \u00f6nc\u00fc uygulamalarla yenilenebilir enerji i\u00e7in sa\u011flad\u0131\u011f\u0131m\u0131z<strong>\u00a0k\u00fcm\u00fclatif finansman<\/strong> tutar\u0131n\u0131\u00a06<strong> milyar dolar\u0131n \u00fczerine<\/strong> \u00e7\u0131kard\u0131k. Bu kapsamda \u00f6z t\u00fcketim ama\u00e7l\u0131 <strong>\u00e7at\u0131 \u00fcst\u00fc g\u00fcne\u015f enerjisi santrali (GES)<\/strong> projelerine b\u00fcy\u00fck \u00f6nem veriyor, toplumumuzun ve m\u00fc\u015fterilerimizin daha <strong>ye\u015fil bir gelece\u011fe<\/strong> ge\u00e7i\u015f yapmalar\u0131 i\u00e7in \u00e7al\u0131\u015fmalar\u0131m\u0131z\u0131\u00a0s\u00fcrd\u00fcr\u00fcyoruz. <strong>Garanti BBVA<\/strong>, <strong>k\u00f6m\u00fcr santralleri<\/strong> ve <strong>madenleriyle<\/strong> ilgili yeni yat\u0131r\u0131mlar\u0131 finanse etmeyece\u011fini a\u00e7\u0131klayan ilk banka olarak,\u00a0T\u00fcrkiye\u2019nin en b\u00fcy\u00fck <strong>\u00e7at\u0131 \u00fcst\u00fc g\u00fcne\u015f enerjisi santralinin\u00a0finansman\u0131yla<\/strong> sekt\u00f6rdeki \u00f6nc\u00fc duru\u015funu ve <strong>d\u00fc\u015f\u00fck karbonlu ekonomiyi destekleme<\/strong> vizyonunu bir kez daha kan\u0131tlam\u0131\u015f oldu.\u201d<\/em> a\u00e7\u0131klamalar\u0131nda bulundu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Tosyal\u0131 Holding tesislerinde 632 bin metrekare alan \u00fczerinde kurulacak \u00e7at\u0131 \u00fcst\u00fc GES projesi toplamda 140 megawatt kurulu g\u00fcce sahip olurken 71 milyon [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":157200,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[24218,75892,18,52480,2206,98742,8903,21101,27592],"views":181,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/157197"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=157197"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/157197\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/157200"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=157197"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=157197"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=157197"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}