{"id":156918,"date":"2022-06-05T17:09:14","date_gmt":"2022-06-05T14:09:14","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=156918"},"modified":"2022-06-05T17:09:14","modified_gmt":"2022-06-05T14:09:14","slug":"koruma-sirketler-grubu-ofisleri-nin-enerjisi-ni-gunes-ten-karsiliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/koruma-sirketler-grubu-ofisleri-nin-enerjisi-ni-gunes-ten-karsiliyor\/","title":{"rendered":"(Turkish) Koruma \u015eirketler Grubu Ofisleri&#8217;nin Enerjisini G\u00fcne\u015ften Kar\u015f\u0131l\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/156918\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Kimya \u00fcreticilerinden olan Koruma \u015eirketler Grubu, Kocaeli\u2019nin Derince \u0130l\u00e7esi\u2019nde yer alan tesisindeki Ar-Ge Merkezi, \u0130dari Bina ve Koruma Temizlik A.\u015e Fabrikas\u0131 \u00e7at\u0131lar\u0131na 700 kW kurulu g\u00fcc\u00fcnde g\u00fcne\u015f enerjisi santrali kurarken b\u00f6lgedeki toplam hedefi ise kademeli olarak 2 MW \u00fczerinde kurulu g\u00fcce sahip olmak.<\/strong><\/h2>\n<p>Koruma \u015eirketler Grubu b\u00fcnyesindeki <strong>Koruma Temizlik, Koruma Tar\u0131m ve Koruma Klor Alkali fabrikalar\u0131<\/strong> \u00fcretim esnas\u0131nda y\u00fcksek miktarlarda<strong> elektrik enerjisine<\/strong> ihtiya\u00e7 duyuyor. T\u00fcrkiye pazar\u0131na ve \u00e7ok say\u0131da \u00fclkeye ihracat yapan <strong>Koruma \u015eirketler Grubu<\/strong> fabrikalar\u0131ndan her y\u0131l <strong>10&#8217;binlerce<\/strong>\u00a0\u00fcr\u00fcn t\u00fcketiciye sunuluyor.<\/p>\n<h3><strong>\u201cGES\u2019LER\u0130 UYGUN OLAN HER NOKTADA KULLANMA KARARI ALDIK\u201d<\/strong><\/h3>\n<h3><strong><img loading=\"lazy\" class=\"alignright wp-image-156921\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/koruma-sirketler-grubu-ofisleri-nin-enerjisi-ni-gunes-ten-karsiliyor.jpg\" alt=\"\" width=\"320\" height=\"179\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/koruma-sirketler-grubu-ofisleri-nin-enerjisi-ni-gunes-ten-karsiliyor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/koruma-sirketler-grubu-ofisleri-nin-enerjisi-ni-gunes-ten-karsiliyor-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/koruma-sirketler-grubu-ofisleri-nin-enerjisi-ni-gunes-ten-karsiliyor-500x280.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/koruma-sirketler-grubu-ofisleri-nin-enerjisi-ni-gunes-ten-karsiliyor-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/strong><\/h3>\n<p>Tesis b\u00fcnyesindeki Koruma Temizlik Fabrikas\u0131, <strong>Ar-Ge<\/strong> ve <strong>\u0130novasyon Merkezi<\/strong> ile <strong>\u0130dari Merkez Binas\u0131<\/strong>\u2019n\u0131n <strong>\u00e7at\u0131lar\u0131nda<\/strong> <strong>GES projelerini uygulamaya ba\u015flad\u0131klar\u0131n\u0131<\/strong> belirten <em>Koruma Klor Alkali Ar-Ge Direkt\u00f6r Yard\u0131mc\u0131s\u0131<\/em> <strong>S. Baran \u00d6neren<\/strong>, <em>\u201cT\u00fcrkiye ortalama <strong>y\u0131lda<\/strong> <strong>2.737 saat, g\u00fcnl\u00fck 7,5 saat<\/strong> verimli g\u00fcne\u015f alma potansiyeline sahip bir \u00fclke. <strong>Yenilenebilir<\/strong> ve <strong>\u00e7evreye duyarl\u0131<\/strong> enerji kaynaklar\u0131na y\u00f6nelik olarak biz tesisimiz b\u00fcnyesinde <strong>g\u00fcne\u015f enerji panellerini<\/strong> uygun olan her noktada kullanma karar\u0131 ald\u0131k.\u201d<\/em> ifadelerini kulland\u0131.<\/p>\n<h3><strong>\u201cOF\u0130SLER\u0130M\u0130ZDE G\u00dcNE\u015eLE \u00c7ALI\u015eACA\u011eIZ\u201d<\/strong><\/h3>\n<p>Kurulan g\u00fcne\u015f panellerinin kurulu g\u00fcc\u00fcn\u00fcn<strong> 700 kW<\/strong> oldu\u011funu belirten \u00d6neren,<em> \u201cSadece buradan \u00fcretilecek enerji ile bile <strong>Ar-Ge<\/strong> ve<strong> \u0130novasyon Merkezimiz<\/strong> ve <strong>\u0130dari Merkez binam\u0131zdaki<\/strong> ofislerimizin elektrik ihtiyac\u0131 kar\u015f\u0131lanabilecek, t\u00fcketimden <strong>artan enerji \u00fcretim tesislerimizde<\/strong> t\u00fcketilecek. K\u0131sacas\u0131 ofislerimizde g\u00fcne\u015fle \u00e7al\u0131\u015faca\u011f\u0131z. Hedefimiz kademeli olarak bu rakam\u0131 <strong>2 MW<\/strong>\u2019\u0131n \u00fczerine \u00e7\u0131karmak.\u201d<\/em> \u015feklinde konu\u015ftu.<\/p>\n<h3><strong>\u201c\u0130LERLEYEN S\u00dcRE\u00c7TE 4 MW G\u0130B\u0130 B\u0130R KURULU G\u00dcCE ULA\u015eACA\u011eIZ\u201d<\/strong><\/h3>\n<p><strong>Uygulanan Proje&#8217;nin<\/strong> sadece <strong>Derince\u2019ye<\/strong> y\u00f6nelik olmad\u0131\u011f\u0131n\u0131 belirten \u00d6neren, <em>\u201c<strong>Hatay<\/strong>\u2019daki ve <strong>Denizli<\/strong>\u2019deki tesislerimizde de kurumuna ba\u015flad\u0131\u011f\u0131m\u0131z <strong>GES\u2019ler<\/strong> ile birlikte ilerleyen s\u00fcre\u00e7te<strong> 4 MW<\/strong> gibi bir kurulu g\u00fcce ula\u015faca\u011f\u0131z.\u201d<\/em> ifadelerini kulland\u0131.<\/p>\n<h3><strong>\u201cKOJENERASYON SANTRALLER\u0130M\u0130Z \u0130LE B\u0130RL\u0130KTE 33,5 MEGAVATLIK B\u0130R ENERJ\u0130 \u00dcRET\u0130YORUZ\u201d<\/strong><\/h3>\n<p>\u00dcretim i\u00e7in ihtiya\u00e7 duyulan y\u00fcksek enerji ihtiyac\u0131n\u0131n b\u00fcy\u00fck oranda kar\u015f\u0131lanmas\u0131na destek olmak amac\u0131yla tesis b\u00fcnyesinde kurulan <strong>kojenerasyon santralleri ile<\/strong>\u00a0do\u011falgaz yard\u0131m\u0131yla <strong>elektrik \u00fcreterek<\/strong> en az <strong>karbon sal\u0131m\u0131n\u0131yla<\/strong> \u00fcretimlerini s\u00fcrd\u00fcrd\u00fcklerini belirten <em>Koruma Klor Alkali Elektrik M\u00fchendisi ve Enerji Y\u00f6neticisi<\/em> <strong>Ali Sait Berat G\u00fcne\u015fli<\/strong> ise, <em>\u201c<strong>Kocaeli, Hatay<\/strong> ve <strong>Denizli\u2019<\/strong>deki tesislerimizde kurulu ve faal durumda olan \u00fcretim lisans\u0131na sahip<strong> kojenerasyon tesislerimizde<\/strong> toplamda <strong>33,5 MWh<\/strong> elektrik \u00fcretim kapasitemiz mevcut. Bu mevcut kapasite <strong>2022 itibariyle<\/strong> kurulumu devam eden <strong>yeni gaz motorlar\u0131yla<\/strong> desteklenerek Kocaeli tesisimizdeki <strong>kojenerasyon santral kapasitesi 13,4 Mwh<\/strong>\u2019ten <strong>22 MW<\/strong>\u2019e , <strong>Hatay tesisindeki kapasite<\/strong> ise<strong> 10 MW<\/strong>\u2019ten <strong>18,6 MW<\/strong>\u2019e \u00e7\u0131kar\u0131lacakt\u0131r. Nihai durumda <strong>50,7 MWh<\/strong> kapasiteye \u00e7\u0131kacak <strong>kojenerasyon santrallerinin<\/strong> enerji ihtiyac\u0131n\u0131n b\u00fcy\u00fck oranda kar\u015f\u0131lamakla beraber \u015febekeye de emre amade bir \u015fekilde katk\u0131 sa\u011flamaktad\u0131r. <strong>ISO 50001 Enerji Y\u00f6netim Sistemi<\/strong> kapsam\u0131nda sertifikal\u0131 olan tesislerimizde enerjiyi <strong>\u00fcretme<\/strong> ve<strong> t\u00fcketme<\/strong> noktas\u0131nda fark\u0131ndal\u0131\u011fa sahip kadromuz ile <strong>her 3 lokasyonda<\/strong> h\u0131z kesmeden \u00e7al\u0131\u015fmalar\u0131m\u0131za devam ediyoruz.\u201d<\/em> a\u00e7\u0131klamas\u0131nda bulundu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Kimya \u00fcreticilerinden olan Koruma \u015eirketler Grubu, Kocaeli\u2019nin Derince \u0130l\u00e7esi\u2019nde yer alan tesisindeki Ar-Ge Merkezi, \u0130dari Bina ve Koruma Temizlik A.\u015e Fabrikas\u0131 \u00e7at\u0131lar\u0131na [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":156921,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[9736,2390,2326,12792,2569,2206,909,103805,99686],"views":174,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/156918"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=156918"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/156918\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/156921"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=156918"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=156918"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=156918"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}