{"id":156856,"date":"2022-06-04T16:12:32","date_gmt":"2022-06-04T13:12:32","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=156856"},"modified":"2022-06-04T16:12:32","modified_gmt":"2022-06-04T13:12:32","slug":"duru-bulgur-enerji-tuketiminin-yuzde-85-ini-gunesten-saglayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/duru-bulgur-enerji-tuketiminin-yuzde-85-ini-gunesten-saglayacak\/","title":{"rendered":"(Turkish) &#8217;Duru Bulgur&#8217; Enerji T\u00fcketiminin % 85\u2019ini G\u00fcne\u015ften Sa\u011flayacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/156856\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Duru Bulgur, 2,8 mw&#8217;l\u0131k ges kapasitesini y\u0131lsonuna kadar 5,8 mw&#8217;a y\u00fckseltecek.<\/strong><\/h2>\n<p>T\u00fcm d\u00fcnyada her y\u0131l <strong>05 Haziran\u2019da<\/strong> kutlanan<strong>\u00a0\u201cD\u00fcnya \u00c7evre G\u00fcn\u00fc\u201d<\/strong>, g\u0131dan\u0131n gelece\u011fi ve s\u00fcrd\u00fcr\u00fclebilirlik faaliyetleri gibi konu ba\u015fl\u0131klar\u0131n\u0131n g\u00fcndeme gelmesine \u00f6nemli katk\u0131lar sa\u011fl\u0131yor. <strong>Do\u011faya duyarl\u0131<\/strong> ve <strong>s\u00fcrd\u00fcr\u00fclebilir \u00e7evrenin<\/strong> sorumluluklar\u0131n\u0131 \u00fcstlenerek faaliyetlerini s\u00fcrd\u00fcren <strong>Duru Bulgur<\/strong>, temiz enerji yat\u0131r\u0131mlar\u0131yla <strong>karbon ayak izini<\/strong> kademeli olarak azaltmaya devam ediyor. <img loading=\"lazy\" class=\"alignright wp-image-156858\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/duru-bulgur-enerji-tuketiminin-yuzde-85-ini-gunesten-saglayacak-1.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/duru-bulgur-enerji-tuketiminin-yuzde-85-ini-gunesten-saglayacak-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/duru-bulgur-enerji-tuketiminin-yuzde-85-ini-gunesten-saglayacak-1-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/duru-bulgur-enerji-tuketiminin-yuzde-85-ini-gunesten-saglayacak-1-500x282.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/06\/duru-bulgur-enerji-tuketiminin-yuzde-85-ini-gunesten-saglayacak-1-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><strong>Do\u011fa dostu faaliyetleri<\/strong> ve<strong> yenilenebilir enerjiye<\/strong> yapt\u0131\u011f\u0131 yat\u0131r\u0131mlarla g\u0131da sekt\u00f6r\u00fcnde \u00f6rnek bir model olu\u015fturan Duru Bulgur, ge\u00e7ti\u011fimiz y\u0131l hayata ge\u00e7irdi\u011fi<strong> g\u00fcne\u015f enerjisi yat\u0131r\u0131mlar\u0131nda<\/strong> kapasite art\u0131r\u0131m\u0131na gitme karar\u0131 ald\u0131. Duru Bulgur bu kapsamda g\u00fcne\u015f enerjisi alt yap\u0131s\u0131n\u0131<strong> 2022 y\u0131l\u0131<\/strong> sonuna kadar <strong>5,8 mw&#8217;a<\/strong> \u00e7\u0131karacak. Duru Bulgur b\u00f6ylece enerji t\u00fcketiminin <strong>% 85<\/strong>\u2019ini <strong>g\u00fcne\u015f panelleriyle<\/strong> \u00fcretecek.<\/p>\n<p><strong>S\u00fcrd\u00fcr\u00fclebilir<\/strong> \u00fcretim prosesleri ve <strong>ye\u015fil d\u00f6n\u00fc\u015f\u00fcm yat\u0131r\u0131mlar\u0131<\/strong>na a\u011f\u0131rl\u0131k verdiklerini aktard\u0131. \u0130lk etapta <strong>tesis \u00e7at\u0131lar\u0131 \u00fczerinde<\/strong> kurulu olan <strong>2,8 mw<\/strong> g\u00fcce sahip <strong>g\u00fcne\u015f enerji santrallerinin<\/strong> kapasitesini 2022 y\u0131l\u0131n\u0131n sonuna kadar <strong>5,8 megavata<\/strong> \u00e7\u0131karacaklar\u0131n\u0131 dile getiren Emin Duru, <em>\u201c2022 y\u0131l\u0131 sonu elektrik t\u00fcketimimizin <strong>% 85<\/strong>\u2019ini g\u00fcne\u015f panellerinden \u00fcretmeyi \u00f6ng\u00f6r\u00fcyoruz. Yap\u0131lacak bu \u00e7al\u0131\u015fma ile y\u0131lda <strong>3.270 ton<\/strong> karbon sal\u0131m\u0131n\u0131n \u00f6n\u00fcne ge\u00e7ip yakla\u015f\u0131k<strong> 54.000 a\u011fac\u0131n<\/strong> kesilmesine de engel olaca\u011f\u0131z. Daha iyi bir \u00e7evre yaratmak i\u00e7in ayr\u0131ca<strong> 10 y\u0131l i\u00e7inde<\/strong> yeni a\u011fa\u00e7lar\u0131n yeti\u015ftirilmesine de direkt olarak katk\u0131 sa\u011flayaca\u011f\u0131z. <strong>Ye\u015fil d\u00f6n\u00fc\u015f\u00fcmle<\/strong> s\u00fcrd\u00fcr\u00fclebilir <strong>\u00fcretim prosesleri<\/strong> geli\u015ftirece\u011fiz\u201d<\/em> ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Duru Bulgur, 2,8 mw&#8217;l\u0131k ges kapasitesini y\u0131lsonuna kadar 5,8 mw&#8217;a y\u00fckseltecek. T\u00fcm d\u00fcnyada her y\u0131l 05 Haziran\u2019da kutlanan\u00a0\u201cD\u00fcnya \u00c7evre G\u00fcn\u00fc\u201d, g\u0131dan\u0131n gelece\u011fi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":156859,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[15555,103782,18,2326,41848,431,5982,842,2482],"views":175,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/156856"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=156856"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/156856\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/156859"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=156856"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=156856"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=156856"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}