{"id":156404,"date":"2022-05-28T14:52:26","date_gmt":"2022-05-28T11:52:26","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=156404"},"modified":"2022-05-28T14:52:56","modified_gmt":"2022-05-28T11:52:56","slug":"akkuyu-ngs-nin-4-unitesi-ndeki-calismalar-suruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngs-nin-4-unitesi-ndeki-calismalar-suruyor\/","title":{"rendered":"(Turkish) Akkuyu NGS\u2019nin 4. \u00dcnitesi\u2019ndeki \u00c7al\u0131\u015fmalar S\u00fcr\u00fcyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/156404\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 4\u2019\u00fcnc\u00fc \u00fcnitesinde t\u00fcrbin b\u00f6l\u00fcm\u00fc binas\u0131n\u0131n temel plakas\u0131n\u0131n beton d\u00f6kme i\u015flemi ba\u015flad\u0131. Maksimum dayan\u0131kl\u0131l\u0131\u011f\u0131n elde edilmesi i\u00e7in temel plakas\u0131, 17.500 metrek\u00fcp beton ve 3.500 ton in\u015faat demiri ile g\u00fc\u00e7lendirilecek ve plakan\u0131n y\u00fcksekli\u011fi 7 metre olacak.<\/h2>\n<p><strong>T\u00fcrbin tesisinin kurulaca\u011f\u0131<\/strong> binan\u0131n temel plakas\u0131,<strong> \u201cano\u201d<\/strong> denilen<strong> 12 b\u00f6l\u00fcmden<\/strong> olu\u015fuyor. \u0130\u015flemler s\u0131ras\u0131nda ilk anoya<strong> 680 metrek\u00fcp<\/strong> beton d\u00f6k\u00fclecek, ard\u0131ndan da <strong>turbojenerat\u00f6r tesisi so\u011futma sisteminin<\/strong> bir par\u00e7as\u0131 olan<strong> 3 metre<\/strong> \u00e7ap\u0131ndaki <strong>geni\u015f boru hatlar\u0131ndan<\/strong> kurulumu yap\u0131lacak.<\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-156406\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/akkuyu-ngs-nin-4-unitesi-ndeki-calismalar-surduruluyor-2.jpg\" alt=\"\" width=\"320\" height=\"212\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/akkuyu-ngs-nin-4-unitesi-ndeki-calismalar-surduruluyor-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/akkuyu-ngs-nin-4-unitesi-ndeki-calismalar-surduruluyor-2-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/akkuyu-ngs-nin-4-unitesi-ndeki-calismalar-surduruluyor-2-500x331.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/akkuyu-ngs-nin-4-unitesi-ndeki-calismalar-surduruluyor-2-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/akkuyu-ngs-nin-4-unitesi-ndeki-calismalar-surduruluyor-2-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><strong>Beton d\u00f6kme i\u015flemine<\/strong> ba\u015flamadan \u00f6nce,<strong> 38 bin metrek\u00fcp<\/strong> beton hacimli temelin beton taban\u0131n\u0131n olu\u015fturulmas\u0131n\u0131, <strong>su yal\u0131t\u0131m\u0131n\u0131n kurulumu<\/strong>nu ve<strong> temel levhan\u0131n g\u00fc\u00e7lendirilmesi<\/strong>ni kapsayan, \u00e7ukurun haz\u0131rlanmas\u0131yla ilgili \u00e7al\u0131\u015fmalar yap\u0131ld\u0131. <strong>Beton d\u00f6kme i\u015fleminde<\/strong> 2 vardiya olarak \u00e7al\u0131\u015fan toplam <strong>450 i\u015f\u00e7i<\/strong> ve uzman yer al\u0131yor. <strong>4\u2019\u00fcnc\u00fc \u00fcnitenin<\/strong> en \u00f6nemli binalar\u0131ndan biri olan<strong> t\u00fcrbin b\u00f6l\u00fcm\u00fc<\/strong> binas\u0131n\u0131n <strong>temel plakas\u0131n\u0131n<\/strong> toplam alan\u0131 yakla\u015f\u0131k <strong>6.000 metrekareyi<\/strong> buluyor.<\/p>\n<p><em>AKKUYU N\u00dcKLEER\u00a0 Genel M\u00fcd\u00fcr\u00fc<\/em> Anastasia Zoteeva konuya ili\u015fkin \u015funlar\u0131 s\u00f6yledi: \u201c<em>T\u00fcrbin tesisinin alt\u0131ndaki temel, t\u00fcrbinin \u00e7al\u0131\u015fmas\u0131 s\u0131ras\u0131nda ortaya \u00e7\u0131kan <strong>y\u00fckleri ta\u015f\u0131yabilen<\/strong> ve <strong>e\u015fit olarak da\u011f\u0131tabilen<\/strong> karma\u015f\u0131k bir yap\u0131d\u0131r. Temel, a\u015famalar halinde in\u015fa edilecek. Her a\u015famada, <strong>betonun kalitesine<\/strong> ili\u015fkin s\u0131k\u0131 gereklilikler yerine getiriliyor. <strong>Akkuyu NGS<\/strong> sahas\u0131nda kullan\u0131lan t\u00fcm teknolojik \u00e7\u00f6z\u00fcmler gibi <strong>4\u2019\u00fcnc\u00fc \u00fcnitenin<\/strong> t\u00fcrbin binas\u0131n\u0131n<strong> temel plakas\u0131n\u0131n betonlanmas\u0131<\/strong> s\u00fcreci<strong> IAEA\u2019<\/strong>nin g\u00fcvenlik standartlar\u0131na, T\u00fcrkiye Cumhuriyeti\u2019nin <strong>mevzuat h\u00fck\u00fcmlerine<\/strong> ve <strong>n\u00fckleer alandaki modern gereksinimlerine<\/strong> uygun olarak y\u00fcr\u00fct\u00fcl\u00fcyor.<\/em>\u201d<\/p>\n<p>Beton, tasar\u0131mda \u00f6ng\u00f6r\u00fclen dayan\u0131kl\u0131l\u0131\u011fa ula\u015ft\u0131ktan sonra kalitesi <strong>N\u00fckleer D\u00fczenleme Kurumu (NDK)<\/strong> ve ba\u011f\u0131ms\u0131z denetleme kurulu\u015fu temsilcilerinden olu\u015fan \u00f6zel bir komisyon taraf\u0131ndan kontrol edilecek. Ard\u0131ndan <strong>4\u2019\u00fcnc\u00fc \u00fcnitenin<\/strong> t\u00fcrbin b\u00f6l\u00fcm\u00fc binas\u0131n\u0131n <strong>temel plakas\u0131n\u0131n in\u015fas\u0131<\/strong> tamamlanm\u0131\u015f olacak.<\/p>\n<p><strong>Temel olu\u015fturma \u00e7al\u0131\u015fmalar\u0131<\/strong> yap\u0131lan <strong>binada<\/strong>, enerji \u00fcretimine ili\u015fkin<strong> sistemler<\/strong> ve <strong>ekipmanlar<\/strong> yer al\u0131yor. Bu ekipmanlar aras\u0131nda, <strong>t\u00fcrbin tesisi, suyu gaz kat\u0131\u015f\u0131klar\u0131ndan<\/strong> ar\u0131nd\u0131rmaya y\u00f6nelik bir cihaz olan <strong>degaz\u00f6r, besleme suyu pompas\u0131<\/strong> ve <strong>yard\u0131mc\u0131 ekipmanlar<\/strong> bulunuyor. T\u00fcrbin binas\u0131nda, su buhar\u0131n\u0131n termal enerjisi rotasyon enerjisine ve ard\u0131ndan da jenerat\u00f6rde elektrik enerjisine d\u00f6n\u00fc\u015ft\u00fcr\u00fcl\u00fcyor.<\/p>\n<p><strong>AKKUYU N\u00dcKLEER A.\u015e,<\/strong> 4\u2019\u00fcnc\u00fc \u00fcnite i\u00e7in ge\u00e7en Ekim ay\u0131nda <strong>n\u00fckleer g\u00fcvenlik tesisleri<\/strong> de dahil t\u00fcm <strong>in\u015faat<\/strong> ve <strong>montaj i\u015flerinin<\/strong> ba\u015flamas\u0131na izin veren <strong>in\u015faat lisans\u0131n\u0131<\/strong> alm\u0131\u015ft\u0131. \u015eu anda Akkuyu NGS&#8217;nin <strong>4 g\u00fc\u00e7 \u00fcnitesinde<\/strong> in\u015faat ve montaj \u00e7al\u0131\u015fmalar\u0131<strong> e\u015f zamanl\u0131<\/strong> olarak y\u00fcr\u00fct\u00fcl\u00fcyor. <strong>G\u00fc\u00e7 \u00fcnitelerinin in\u015fas\u0131na paralel o<\/strong>larak n\u00fckleer santralin i\u015fletilmesi i\u00e7in gerekli <strong>genel ama\u00e7l\u0131 binalar<\/strong> ve <strong>yard\u0131mc\u0131 tesisler de<\/strong> in\u015fa ediliyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 4\u2019\u00fcnc\u00fc \u00fcnitesinde t\u00fcrbin b\u00f6l\u00fcm\u00fc binas\u0131n\u0131n temel plakas\u0131n\u0131n beton d\u00f6kme i\u015flemi ba\u015flad\u0131. Maksimum dayan\u0131kl\u0131l\u0131\u011f\u0131n elde edilmesi i\u00e7in temel [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":156407,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[3019,1303,103619,18,98027,34930],"views":185,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/156404"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=156404"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/156404\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/156407"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=156404"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=156404"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=156404"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}