{"id":155940,"date":"2022-05-20T12:23:13","date_gmt":"2022-05-20T09:23:13","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=155940"},"modified":"2022-05-20T12:23:13","modified_gmt":"2022-05-20T09:23:13","slug":"yakutistan-buzkiranina-ait-ilk-ritm-200-reaktorunun-uretimi-tamamlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yakutistan-buzkiranina-ait-ilk-ritm-200-reaktorunun-uretimi-tamamlandi\/","title":{"rendered":"(Turkish) &#8217;Yakutistan Buzk\u0131ran\u0131&#8217;na Ait \u0130lk RITM-200 Reakt\u00f6r\u00fcn\u00fcn \u00dcretimi Tamamland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/155940\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Yeni nesil Yakutistan seri buzk\u0131ran gemisinin ilk RITM-200 reakt\u00f6r\u00fcn\u00fcn \u00fcretimi tamamland\u0131. Rusya Devlet Atom Enerjisi Kurumu Rosatom\u2019un makine yap\u0131m\u0131 birimi Atomenergomash\u2019a ba\u011fl\u0131 ZiO-Podolsk A.\u015e \u00fcretim tesisinde \u00fcretilen reakt\u00f6r, sevkiyata haz\u0131rland\u0131.<\/h2>\n<p><strong>147,5<\/strong> tonluk bir a\u011f\u0131rl\u0131\u011fa,<strong> 7,3<\/strong> metrelik bir y\u00fcksekli\u011fe ve <strong>3,3<\/strong> metrelik \u00e7apa sahip olan reakt\u00f6r, <strong>240 ton<\/strong> kapasiteli \u00f6zel bir demiryolu ta\u015f\u0131t\u0131 ile teslim edilecek. Reakt\u00f6r, demiryolu ile St. Petersburg&#8217;daki Novy Liman\u0131 istasyonuna g\u00f6t\u00fcr\u00fclerek \u00f6zel bir mavnaya aktar\u0131lacak, ard\u0131ndan da deniz yoluyla <strong>Balt\u0131k <img loading=\"lazy\" class=\"alignright wp-image-155942\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/yakutistan-buzkiranina-ait-ilk-ritm-200-reaktorunun-uretimi-tamamlandi.jpg\" alt=\"\" width=\"320\" height=\"267\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/yakutistan-buzkiranina-ait-ilk-ritm-200-reaktorunun-uretimi-tamamlandi.jpg 400w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/yakutistan-buzkiranina-ait-ilk-ritm-200-reaktorunun-uretimi-tamamlandi-300x251.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/yakutistan-buzkiranina-ait-ilk-ritm-200-reaktorunun-uretimi-tamamlandi-60x50.jpg 60w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Tersanesi<\/strong>&#8216;ne ula\u015ft\u0131r\u0131lacak.<\/p>\n<p><strong>Atomenergomash,<\/strong> daha \u00f6nce de <strong>Arktika 22220 Projesi<\/strong>&#8216;nin son Rus evrensel n\u00fckleer lider buzk\u0131ran\u0131 <strong>LK-60Ya<\/strong> i\u00e7in <strong>RITM-200<\/strong> gemi reakt\u00f6r tesisinin ana ekipman\u0131 ile \u00fclkenin <strong>n\u00fckleer ticaret<\/strong> filosuna y\u00f6nelik <strong>Sibir<\/strong> ve<strong> Ural seri buzk\u0131ranlar\u0131<\/strong>n\u0131n ekipmanlar\u0131n\u0131 tedarik etmi\u015fti. Birime ba\u011fl\u0131 \u015firketler,<strong> hidrolik ak\u00fcm\u00fclat\u00f6rler, su depolama tanklar\u0131, hidrolik ak\u00fcm\u00fclat\u00f6r tanklar\u0131<\/strong> ve <strong>bas\u0131n\u00e7 tanklar\u0131<\/strong> gibi gemi ekipmanlar\u0131 da \u00fcretiyor.<\/p>\n<p>Buzk\u0131ran filosu i\u00e7in Atomenergomash&#8217;ta geli\u015ftirilen son reakt\u00f6r tesisi <strong>RITM-200<\/strong>, ana g\u00fc\u00e7 santralinin bir par\u00e7as\u0131n\u0131 olu\u015fturuyor. Tesis, her biri <strong>175 MW<\/strong> termal kapasiteye sahip iki reakt\u00f6r i\u00e7eriyor. K\u00fc\u00e7\u00fck boyutu ve maliyet verimlili\u011fi avantajlar\u0131yla \u00f6ne \u00e7\u0131kan tesiste, ana ekipman\u0131n do\u011frudan buhar \u00fcreten \u00fcnite g\u00f6vdesinin i\u00e7ine yerle\u015ftirilmesini sa\u011flayan benzersiz bir enerji tasarruflu entegre yerle\u015fim d\u00fczeni bulunuyor. Tesis, <strong>KLT<\/strong> tipi <strong>buzk\u0131ran filosu<\/strong> i\u00e7in halihaz\u0131rda kullan\u0131lan reakt\u00f6r tesislerinden <strong>2 kat<\/strong> daha hafif, bir bu\u00e7uk kat daha kompakt ve <strong>25 MW<\/strong> daha g\u00fc\u00e7l\u00fc olma \u00f6zelli\u011fi ta\u015f\u0131yor. B\u00f6ylece buzk\u0131ranlar\u0131n <strong>\u00e7ift y\u00f6nl\u00fc<\/strong> draft tasar\u0131m\u0131na ve h\u0131z, buz k\u0131rma kapasitesi gibi a\u00e7\u0131lardan geli\u015fmi\u015f teknik \u00f6zelliklere de sahip oluyor. <strong>\u00b145\u00ba<\/strong> yalpalayan, <strong>\u00b115\u00ba<\/strong> yana yatan ve uzun s\u00fcre <strong>30\u00ba<\/strong>\u2019ye kadar yan yatarak yol alan gemi ile g\u00fcvenilir \u015fekilde faaliyet g\u00f6sterebilecek \u015fekilde tasarlanan reakt\u00f6rlerin hizmet \u00f6mr\u00fc<strong> 40 y\u0131la<\/strong> ula\u015f\u0131yor.<\/p>\n<p><strong>Atomenergomash A.\u015e<\/strong>\u2019ye ba\u011fl\u0131 \u015firketler, i\u015f par\u00e7alar\u0131n\u0131n t<strong>asar\u0131m\u0131 ve \u00fcretiminden, ekipman \u00fcretimi<\/strong> ve <strong>kurulumuna<\/strong> kadar bir<strong> RITM-200 tesisi<\/strong>nin olu\u015fturulmas\u0131 i\u00e7in eksiksiz bir \u00fcretim zinciri olu\u015fturuyor. <strong>Atomenergomash<\/strong> b\u00fcnyesinde yer alan \u015firketlerden <strong>Afrikantov OKBM A.\u015e,<\/strong> g\u00fc\u00e7 santralinin bir dizi \u00f6nemli unsurunu da \u00fcreten <strong>tasar\u0131mc\u0131<\/strong> ve <strong>tek kaynak \u00fcreticisi<\/strong> olma \u00f6zelli\u011fini ta\u015f\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Yeni nesil Yakutistan seri buzk\u0131ran gemisinin ilk RITM-200 reakt\u00f6r\u00fcn\u00fcn \u00fcretimi tamamland\u0131. Rusya Devlet Atom Enerjisi Kurumu Rosatom\u2019un makine yap\u0131m\u0131 birimi Atomenergomash\u2019a ba\u011fl\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":155942,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[103458,46136,63815,101033,103459,75000,79029,65627,103457],"views":207,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/155940"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=155940"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/155940\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/155942"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=155940"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=155940"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=155940"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}