{"id":15573,"date":"2013-09-20T10:47:30","date_gmt":"2013-09-20T07:47:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=15573"},"modified":"2013-09-20T10:49:33","modified_gmt":"2013-09-20T07:49:33","slug":"borusan-enbw-50mw-kurulu-guce-sahip-balabanli-resin-temelini-atti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/borusan-enbw-50mw-kurulu-guce-sahip-balabanli-resin-temelini-atti\/","title":{"rendered":"(Turkish) Borusan EnBW, 50 MW Kurulu G\u00fcce Sahip Balabanl\u0131 RES`in Temelini Att\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/15573\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Borusan ve Alman EnBW ortakl\u0131\u011f\u0131 Borusan EnBW Enerji, Tekirda\u011f\u2019daki Balabanl\u0131 R\u00fczg\u00e2r Enerji Santrali\u2019nin (RES) temelini att\u0131. Balabanl\u0131 R\u00fczgar Enerji Santrali\u2019nin (RES) temeli t\u00f6renle at\u0131ld\u0131. T\u00f6rene Tekirda\u011f Vali Vekili Mahmut Y\u0131ld\u0131r\u0131m, Tekirda\u011f Vali Yard\u0131mc\u0131s\u0131 Mustafa Masatl\u0131, Tekirda\u011f \u0130l Parti Ba\u015fkanlar\u0131, Borusan EnBW Enerji Murahhas Azalar\u0131 Mehmet Betil ve Marcel Desai, Borusan EnBW Enerji Genel M\u00fcd\u00fcr\u00fc Mehmet Acarla ve Almanya EnBW AG y\u00f6neticileri kat\u0131ld\u0131.<\/strong><\/p>\n<p><strong>KAPAS\u0130TE 160 MW`YE \u00c7IKACAK<\/strong><br \/>\nTamamland\u0131\u011f\u0131nda 22 r\u00fczg\u00e2r t\u00fcrbininden olu\u015facak ve 50 MW toplam kurulu g\u00fcce sahip olacak santralle birlikte Borusan EnBW Enerji\u2019nin toplam kapasitesi 160 MW, toplam r\u00fczg\u00e2r enerjisi kurulu g\u00fcc\u00fc ise 110 MW d\u00fczeyine y\u00fckselecek.<\/p>\n<p><strong>1.3 M\u0130LYAR DOLARLIK YATIRIM<\/strong><br \/>\nT\u00f6rende konu\u015fan Borusan EnBW En<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/borusan-enbw-balabanli-resin-temelini-atti.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-15574\" title=\"borusan-enbw-balabanli-resin-temelini-atti\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/borusan-enbw-balabanli-resin-temelini-atti-300x214.jpg\" alt=\"\" width=\"300\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/borusan-enbw-balabanli-resin-temelini-atti-300x214.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/borusan-enbw-balabanli-resin-temelini-atti-70x50.jpg 70w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/borusan-enbw-balabanli-resin-temelini-atti.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>erji Genel M\u00fcd\u00fcr\u00fc Mehmet Acarla, &#8220;2013-2014 y\u0131llar\u0131nda a\u011f\u0131rl\u0131kl\u0131 olarak r\u00fczg\u00e2r enerjisi santralleri olmak \u00fczere yenilenebilir enerji alan\u0131nda yakla\u015f\u0131k 1,3 milyar ABD dolar\u0131 d\u00fczeyinde yat\u0131r\u0131ma ba\u015flam\u0131\u015f olaca\u011f\u0131z. Balabanl\u0131 RES\u2019i 2014 y\u0131l\u0131 sonunda devreye almay\u0131 planl\u0131yoruz&#8221; dedi.<\/p>\n<p><strong>HEDEF R\u00dcZGARDA 1000 MW<\/strong><br \/>\nBalabanl\u0131`y\u0131 takiben devreye al\u0131nacak di\u011fer santralin \u0130zmir Kemalpa\u015fa`daki 30 MW`l\u0131k Fuat RES Projesi olaca\u011f\u0131n\u0131 anlatan Acarla, &#8220;Her biri 50 MW kurulu g\u00fcce sahip olacak di\u011fer santrallerimiz \u00c7anakkale, Bursa ve Mersin\u2019de kurulacak. 2014 y\u0131l\u0131nda da T\u00fcrkiye`nin en b\u00fcy\u00fck r\u00fczg\u00e2r enerjisi santrallerinden biri olmas\u0131 planlanan 138 MW`l\u0131k Saroz projesine de ba\u015flayaca\u011f\u0131z. R\u00fczgar enerjisinde orta vadede 455 MW; uzun vadede ise 1000 MW\u2019\u0131n \u00fcst\u00fcnde bir r\u00fczg\u00e2r kurulu g\u00fcc\u00fcne ula\u015fmay\u0131 \u00f6ng\u00f6r\u00fcyoruz&#8221; diye konu\u015ftu.<\/p>\n<p><strong>SANTRAL\u0130N \u0130N\u015eAATI DA \u00c7EVREC\u0130<\/strong><br \/>\n\u015eirket yetkilileri, Balabanl\u0131 RES projesinde \u00fcretilen enerjinin \u00e7evreye duyarl\u0131 olaca\u011f\u0131n\u0131 belirtti. Hem T\u00fcrk \u00c7evre Mevzuat\u0131\u2019na hem de uluslararas\u0131 standartlara uyumlu in\u015fa edilecek santral projesinin in\u015faat ve i\u015fletme d\u00f6nemlerinde \u00c7evre Y\u00f6netim Plan\u0131 uygulanaca\u011f\u0131 kaydedildi. Bu sayede santralin in\u015faat ve i\u015fletme d\u00f6nemindeki faaliyetleri de \u00e7evreye duyarl\u0131 bir \u015fekilde y\u00fcr\u00fct\u00fclecek.<\/p>\n<p><strong>PORTF\u00d6Y\u00dcN Y\u00dcZDE 62`S\u0130 R\u00dcZGAR<\/strong><br \/>\nBorusan EnBW Enerji portf\u00f6y\u00fcn\u00fcn y\u00fczde 62\u2019sini (455 MW) r\u00fczg\u00e2r projeleri y\u00fczde 38\u2019ini (280 MW) ise hidroelektrik santral projeleri olu\u015fturuyor. Borusan EnBW Enerji`nin ilk operasyonel santrali olan Band\u0131rma R\u00fczg\u00e2r Enerjisi Santrali (Bal\u0131kesir) 2009 y\u0131l\u0131n\u0131n Eyl\u00fcl ay\u0131nda devreyeal\u0131nd\u0131 ve Temmuz 2010`da kapasite art\u0131r\u0131m\u0131 yap\u0131larak 60 MW kurulu g\u00fcce ula\u015ft\u0131. Borusan EnBW Enerji\u2019nin toplam kurulu g\u00fcc\u00fc 110 MW d\u00fczeyinde bulunuyor.<\/p>\n<p>Yay\u0131nc\u0131: <a href=\"https:\/\/www.enerjigazetesi.ist\" target=\"_blank\">Enerji Gazetesi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Borusan ve Alman EnBW ortakl\u0131\u011f\u0131 Borusan EnBW Enerji, Tekirda\u011f\u2019daki Balabanl\u0131 R\u00fczg\u00e2r Enerji Santrali\u2019nin (RES) temelini att\u0131. Balabanl\u0131 R\u00fczgar Enerji Santrali\u2019nin (RES) temeli t\u00f6renle [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":15574,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[8804,829,63,67,1009,165,474,231],"views":930,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/15573"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=15573"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/15573\/revisions"}],"predecessor-version":[{"id":15576,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/15573\/revisions\/15576"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/15574"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=15573"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=15573"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=15573"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}