{"id":155491,"date":"2022-05-12T10:36:05","date_gmt":"2022-05-12T07:36:05","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=155491"},"modified":"2022-05-12T10:36:05","modified_gmt":"2022-05-12T07:36:05","slug":"huawei-ve-solarapex-gunes-enerjisinde-400-mwlik-isbirligine-imza-atti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/huawei-ve-solarapex-gunes-enerjisinde-400-mwlik-isbirligine-imza-atti\/","title":{"rendered":"(Turkish) Huawei ve SolarAPEX G\u00fcne\u015f Enerjisinde 400 MW\u2019l\u0131k \u0130\u015fbirli\u011fine \u0130mza Att\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/155491\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Huawei T\u00fcrkiye ve SolarAPEX, g\u00fcne\u015f enerjisi santrali (GES) alan\u0131nda yeni bir i\u015fbirli\u011fine imza atarken Intersolar Avrupa G\u00fcne\u015f Enerjisi Konferans ve Fuar\u0131&#8217;nda imzalanan toplam da 400 MW\u2019l\u0131k enerji hacmini i\u00e7eren s\u00f6zle\u015fme kapsam\u0131nda, Huawei\u2019in \u00fcr\u00fcnleri SolarAPEX\u2019in \u00e7e\u015fitli projelerinde yer alacak.<\/strong><\/h2>\n<p><img loading=\"lazy\" class=\"alignright wp-image-155493\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/huawei-ve-solarapex-gunes-enerjisinde-400-mwlik-isbirligine-imza-atti.jpg\" alt=\"\" width=\"320\" height=\"220\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/huawei-ve-solarapex-gunes-enerjisinde-400-mwlik-isbirligine-imza-atti.jpg 673w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/huawei-ve-solarapex-gunes-enerjisinde-400-mwlik-isbirligine-imza-atti-300x206.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/huawei-ve-solarapex-gunes-enerjisinde-400-mwlik-isbirligine-imza-atti-500x343.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/huawei-ve-solarapex-gunes-enerjisinde-400-mwlik-isbirligine-imza-atti-73x50.jpg 73w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Huawei ve SolarAPEX bu kapsamda yeni bir <strong>\u00fcr\u00fcn tedarik s\u00f6zle\u015fmesine<\/strong> imza att\u0131lar. S\u00f6zle\u015fme kapsam\u0131nda sa\u011flanacak <strong>400 MW<\/strong>\u2019l\u0131k \u00fcr\u00fcn\u00fcn <strong>140 MW<\/strong>\u2019l\u0131k k\u0131sm\u0131, Mart ay\u0131nda <strong>Tosyal\u0131 Holding<\/strong>\u2019in hayata ge\u00e7irdi\u011fi d\u00fcnyan\u0131n en b\u00fcy\u00fck <strong>\u00e7at\u0131 g\u00fcne\u015f enerjisi santrali projesi<\/strong>nde, geri kalan<strong> 260 MW<\/strong>\u2019l\u0131k birimin ise <strong>SolarAPEX\u2019<\/strong>in T\u00fcrkiye\u2019nin d\u00f6rt bir yan\u0131ndaki <strong>\u00e7at\u0131 ve saha uygulamal\u0131 GES projeleri<\/strong>nde kullan\u0131lmas\u0131 planlan\u0131yor.<\/p>\n<p>Projede kullan\u0131lacak<strong> Huawei SUN2000-100KTL-M1 Pro<\/strong> \u00fcr\u00fcn\u00fc, ek bir donan\u0131ma ihtiya\u00e7 duyulmadan, \u0131s\u0131 kaynakl\u0131 kazalara sebep olabilecek unsurlara kar\u015f\u0131 (DC ARK) <strong>tam koruma<\/strong> sa\u011flarken b\u00f6ylelikle projenin verimlili\u011fini de art\u0131r\u0131yor.<\/p>\n<p>S\u00f6zle\u015fme kapsam\u0131nda ayr\u0131ca, <strong>g\u00fcne\u015f panelleri<\/strong> i\u00e7in \u00e7evrimi\u00e7i kontrol yap\u0131lmas\u0131na imkan sa\u011flayan <strong>\u201cI-V Curve Lisans\u0131\u201d<\/strong> da <strong>Huawei<\/strong> taraf\u0131ndan sa\u011flan\u0131yor. Bu sayede <strong>mekanik m\u00fcdahaleye<\/strong> ve <strong>sahaya personel g\u00f6nderilmesine<\/strong> gerek kalmaks\u0131z\u0131n, g\u00fcne\u015f panellerinin<strong> performans<\/strong> ve <strong>g\u00fcvenlik riskleri<\/strong> uzaktan takip edilebiliniyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Huawei T\u00fcrkiye ve SolarAPEX, g\u00fcne\u015f enerjisi santrali (GES) alan\u0131nda yeni bir i\u015fbirli\u011fine imza atarken Intersolar Avrupa G\u00fcne\u015f Enerjisi Konferans ve Fuar\u0131&#8217;nda imzalanan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":155493,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[45418,2206,101424,13446,76482,103282],"views":251,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/155491"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=155491"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/155491\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/155493"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=155491"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=155491"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=155491"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}