{"id":155415,"date":"2022-05-10T13:38:59","date_gmt":"2022-05-10T10:38:59","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=155415"},"modified":"2022-05-10T13:38:59","modified_gmt":"2022-05-10T10:38:59","slug":"turkiye-nin-biyokutle-haritasi-yayinlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiye-nin-biyokutle-haritasi-yayinlandi\/","title":{"rendered":"(Turkish) T\u00fcrkiye\u2019nin Biyok\u00fctle Haritas\u0131 Yay\u0131nland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/155415\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131<\/strong> resmi sosyal medya hesab\u0131nda T\u00fcrkiye\u2019nin biyok\u00fctle haritas\u0131 payla\u015f\u0131ld\u0131.<\/h2>\n<p>Payla\u015f\u0131m ile T\u00fcrkiye\u2019nin <strong>73<\/strong> \u015fehrinde <strong>biyok\u00fctleden elektrik \u00fcretildi\u011fi<\/strong> belirtilmi\u015f olup T\u00fcrkiye\u2019nin <em>biyok\u00fctle enerjisi kurulu g\u00fcc\u00fcn\u00fcn<\/em> toplam da <strong>2.102 MW<\/strong> oldu\u011funa dikkat \u00e7ekilirken <strong>Biyok\u00fctle enerjisinin<\/strong> toplam <strong>elektrik kurulu g\u00fcc\u00fcn\u00fcn<\/strong> pay\u0131n\u0131n da <strong>% 2<\/strong> oldu\u011funun bilgisine yer verildi.<\/p>\n<p><img loading=\"lazy\" class=\"aligncenter wp-image-155417\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/turkiye-nin-biyokutle-haritasi-yayinlandi.jpg\" alt=\"\" width=\"500\" height=\"364\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/turkiye-nin-biyokutle-haritasi-yayinlandi.jpg 547w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/turkiye-nin-biyokutle-haritasi-yayinlandi-300x218.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/turkiye-nin-biyokutle-haritasi-yayinlandi-500x364.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/turkiye-nin-biyokutle-haritasi-yayinlandi-69x50.jpg 69w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<h3>Peki Biyok\u00fctle Nedir?<\/h3>\n<p>Biyok\u00fctle, <strong>hayvansal<\/strong> ve <strong>bitkisel<\/strong> <em>do\u011fal ve organik maddeler<\/em> i\u00e7erirken; fosil kaynaklardan elde edilen <strong>k\u00f6m\u00fcr<\/strong> ve <strong>petrol<\/strong> gibi maddeleri i\u00e7ermez. Bu nedenle genelde<strong> kuru a\u011f\u0131rl\u0131kla \u00f6l\u00e7\u00fcl\u00fcrken<\/strong> enerji elde etmede, <strong>motorlarda<\/strong> ve<strong> elektrik enerjisi \u00fcretiminde<\/strong> kullan\u0131lan <strong>organik<\/strong> ve<strong> do\u011fal<\/strong> kaynaklard\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 resmi sosyal medya hesab\u0131nda T\u00fcrkiye\u2019nin biyok\u00fctle haritas\u0131 payla\u015f\u0131ld\u0131. Payla\u015f\u0131m ile T\u00fcrkiye\u2019nin 73 \u015fehrinde biyok\u00fctleden elektrik \u00fcretildi\u011fi belirtilmi\u015f [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":155419,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[103229,29817,103230,18,1972,1635,34977],"views":922,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/155415"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=155415"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/155415\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/155419"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=155415"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=155415"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=155415"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}