{"id":155069,"date":"2022-05-03T20:14:06","date_gmt":"2022-05-03T17:14:06","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=155069"},"modified":"2022-05-03T20:14:06","modified_gmt":"2022-05-03T17:14:06","slug":"balikesir-deki-tatlipinar-res-e-70-mw-kapasiteli-gunes-santrali-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/balikesir-deki-tatlipinar-res-e-70-mw-kapasiteli-gunes-santrali-kurulacak\/","title":{"rendered":"(Turkish) Bal\u0131kesir\u2019deki Tatl\u0131p\u0131nar RES\u2019e 70 MW Kapasiteli G\u00fcne\u015f Santrali Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/155069\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>A\u011fao\u011flu Enerji Grubu \u015firketlerinden Tatl\u0131p\u0131nar Enerji&#8217;nin i\u015fletti\u011fi Bal\u0131kesir&#8217;deki 120,2 MW kapasiteli Tatl\u0131p\u0131nar <img loading=\"lazy\" class=\"alignright wp-image-155071\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/balikesir-deki-tatlipinar-res-e-70-mw-kapasiteli-gunes-santrali-kurulacak.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/balikesir-deki-tatlipinar-res-e-70-mw-kapasiteli-gunes-santrali-kurulacak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/balikesir-deki-tatlipinar-res-e-70-mw-kapasiteli-gunes-santrali-kurulacak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/balikesir-deki-tatlipinar-res-e-70-mw-kapasiteli-gunes-santrali-kurulacak-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/balikesir-deki-tatlipinar-res-e-70-mw-kapasiteli-gunes-santrali-kurulacak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/balikesir-deki-tatlipinar-res-e-70-mw-kapasiteli-gunes-santrali-kurulacak-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>R\u00fczgar Enerji Santrali\u2019ne (RES) 70 MW kurulu g\u00fcc\u00fcnde G\u00fcne\u015f Enerji Santrali (GES) kurulacak.<\/h2>\n<p>Tatl\u0131p\u0131nar RES\u2019e yard\u0131mc\u0131 GES&#8217;te<strong> 158 bin<\/strong> adet g\u00fcne\u015f paneli kullan\u0131lacak olup <strong>983 bin metrekarelik<\/strong> \u00f6zel bir alan tahsis edildi.<\/p>\n<p>Santralin hayata ge\u00e7irilmesiyle birlikte \u015fu anda faaliyette olan<strong>\u00a0r\u00fczgar enerji santrali<\/strong> ile birlikte toplamda y\u0131ll\u0131k ortalama <strong>420.700 GWh<\/strong> enerji \u00fcretiminin yap\u0131laca\u011f\u0131 tahmin edilirken santralin ekonomik \u00f6mr\u00fcn\u00fcn ise<strong> 20 y\u0131l<\/strong> olaca\u011f\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. A\u011fao\u011flu Enerji Grubu \u015firketlerinden Tatl\u0131p\u0131nar Enerji&#8217;nin i\u015fletti\u011fi Bal\u0131kesir&#8217;deki 120,2 MW kapasiteli Tatl\u0131p\u0131nar R\u00fczgar Enerji Santrali\u2019ne (RES) 70 MW kurulu g\u00fcc\u00fcnde G\u00fcne\u015f Enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":155071,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,50],"tags":[56671,24836,3613,80741,18,2326,227,2569,5410,231,103075,103076,34977],"views":470,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/155069"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=155069"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/155069\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/155071"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=155069"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=155069"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=155069"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}