{"id":155065,"date":"2022-05-03T19:58:54","date_gmt":"2022-05-03T16:58:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=155065"},"modified":"2022-05-03T19:58:54","modified_gmt":"2022-05-03T16:58:54","slug":"bergama-cop-gaz-bes-tesisinin-kurulu-gucu-5565mwa-cikiyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bergama-cop-gaz-bes-tesisinin-kurulu-gucu-5565mwa-cikiyor\/","title":{"rendered":"(Turkish) Bergama \u00c7\u00f6p Gaz BES Tesisi&#8217;nin Kurulu G\u00fcc\u00fc 5,565MW&#8217;a \u00c7\u0131k\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/155065\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>\u0130zmir Do\u011fu Star Elektrik \u00dcretim&#8217; ait olan Bergama \u00c7\u00f6p Gaz Elektrik \u00dcretim Tesisi (BES), 15 Nisan 2022&#8217;da 4,242 MWe olan kurulu g\u00fcc\u00fc 5,656 MWe d\u00fczeyine \u00e7\u0131kar\u0131lmas\u0131 i\u00e7in <img loading=\"lazy\" class=\"alignright wp-image-155067\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/bergama-cop-gaz-bes-tesisinin-kurulu-gucu-5565mwa-cikiyor.jpg\" alt=\"\" width=\"300\" height=\"184\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/bergama-cop-gaz-bes-tesisinin-kurulu-gucu-5565mwa-cikiyor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/bergama-cop-gaz-bes-tesisinin-kurulu-gucu-5565mwa-cikiyor-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/bergama-cop-gaz-bes-tesisinin-kurulu-gucu-5565mwa-cikiyor-500x307.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/05\/bergama-cop-gaz-bes-tesisinin-kurulu-gucu-5565mwa-cikiyor-80x50.jpg 80w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>ETKB&#8217;den k\u0131smi kabul ald\u0131.<\/h2>\n<p><strong>4,242 MWe<\/strong> kurulu g\u00fcce sahip olan <strong>Bergama \u00c7\u00f6p Gaz Elektrik \u00dcretim tesisi (BES)<\/strong>, kabul i\u015flemi sonras\u0131 <strong>5,656 MWe<\/strong> kurulu g\u00fcce ula\u015farak b\u00f6ylece <strong>Biotrend Enerji<\/strong>\u2019nin toplam kurulu g\u00fcc\u00fc de <strong>92,2 MWe<\/strong>&#8216;ye ula\u015fm\u0131\u015f oldu.<\/p>\n<p>Tesisi, Biotrend \u00c7evre ve Enerji Yat\u0131r\u0131mlar\u0131 A\u015e\u2019nin ba\u011fl\u0131 ortakl\u0131\u011f\u0131 olan <strong>\u0130zmir Do\u011fu Star Elektrik \u00dcretim A.\u015e <\/strong>i\u015fletiyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130zmir Do\u011fu Star Elektrik \u00dcretim&#8217; ait olan Bergama \u00c7\u00f6p Gaz Elektrik \u00dcretim Tesisi (BES), 15 Nisan 2022&#8217;da 4,242 MWe olan kurulu g\u00fcc\u00fc [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":155067,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[103074,103071,10848,94715,87594,1678,103072,103073],"views":630,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/155065"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=155065"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/155065\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/155067"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=155065"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=155065"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=155065"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}