{"id":154577,"date":"2022-04-21T14:29:13","date_gmt":"2022-04-21T11:29:13","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=154577"},"modified":"2022-04-21T14:30:38","modified_gmt":"2022-04-21T11:30:38","slug":"botas-yenilenebilir-enerji-kapasitesini-15-mwa-yukseltecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/botas-yenilenebilir-enerji-kapasitesini-15-mwa-yukseltecek\/","title":{"rendered":"(Turkish) &#8217;BOTA\u015e&#8217; Yenilenebilir Enerji Kapasitesini 15 MW&#8217;a Y\u00fckseltecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/154577\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>BOTA\u015e taraf\u0131ndan <strong>Avrupa Birli\u011fi Kat\u0131l\u0131m \u00d6ncesi Yard\u0131m Arac\u0131 (IPA)<\/strong> program\u0131 \u00e7er\u00e7evesinde <strong>Tuz G\u00f6l\u00fc Yer Alt\u0131 Depolama Tesisleri<\/strong> ve \u00e7e\u015fitli pompa istasyonlar\u0131na <img loading=\"lazy\" class=\"alignright wp-image-154580\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/botas-yenilenebilir-enerji-kapasitesini-15-mwa-yukseltecek.jpg\" alt=\"\" width=\"320\" height=\"211\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/botas-yenilenebilir-enerji-kapasitesini-15-mwa-yukseltecek.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/botas-yenilenebilir-enerji-kapasitesini-15-mwa-yukseltecek-300x197.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/botas-yenilenebilir-enerji-kapasitesini-15-mwa-yukseltecek-500x329.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/botas-yenilenebilir-enerji-kapasitesini-15-mwa-yukseltecek-76x50.jpg 76w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>y\u00f6nelik<strong>\u00a08 MW<\/strong> kapasiteli<strong> GES projesi<\/strong><strong>\u00a0ihale ilan\u0131<\/strong> yay\u0131mland\u0131.<\/h2>\n<p><strong>GES projelerine <\/strong><span style=\"text-decoration: underline;\">ilaveten<\/span>, b\u00f6lgesinde pek \u00e7ok say\u0131da <strong>r\u00fczgar enerji santrali (RES)<\/strong> yer alan <em>Silivri \u0130\u015fletme M\u00fcd\u00fcrl\u00fc\u011f\u00fc&#8217;<\/em>ne <strong>4,2 MW<\/strong> kurulu g\u00fc\u00e7teki <strong>RES kurulumu<\/strong> i\u00e7in de gerekli <strong>\u00e7al\u0131\u015fmalar<\/strong> yap\u0131lm\u0131\u015f olup<strong> ihale s\u00fcreci<\/strong> tamamlan\u0131rken <strong>R\u00fczgar santrali <\/strong>ise bu y\u0131l <strong>Haziran&#8217;da<\/strong> devreye al\u0131nm\u0131\u015f olacak.<\/p>\n<p>Bununla birlikte, <strong>Do\u011fubayaz\u0131t Kompres\u00f6r \u0130stasyonu<\/strong>&#8216;nun elektrik ihtiyac\u0131n\u0131n <strong>yenilenebilir kaynaklardan<\/strong> kar\u015f\u0131lanmas\u0131na y\u00f6nelik <strong>GES kurulmas\u0131<\/strong> planlan\u0131rken <strong>BOTA\u015e<\/strong>\u2019\u0131n temiz enerji kapasitesi ise 2022&#8217;de ise yakla\u015f\u0131k <strong>15 mw<\/strong> seviyesine \u00e7\u0131kacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. BOTA\u015e taraf\u0131ndan Avrupa Birli\u011fi Kat\u0131l\u0131m \u00d6ncesi Yard\u0131m Arac\u0131 (IPA) program\u0131 \u00e7er\u00e7evesinde Tuz G\u00f6l\u00fc Yer Alt\u0131 Depolama Tesisleri ve \u00e7e\u015fitli pompa istasyonlar\u0131na y\u00f6nelik\u00a08 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":154580,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,50],"tags":[102853,19488,2326,21886,20026,102858,474,22653,57762,102856,102854],"views":505,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/154577"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=154577"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/154577\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/154580"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=154577"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=154577"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=154577"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}