{"id":153929,"date":"2022-04-10T12:09:46","date_gmt":"2022-04-10T09:09:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=153929"},"modified":"2022-04-10T12:28:21","modified_gmt":"2022-04-10T09:28:21","slug":"asunim-den-genese-natural-ortakligiyla-portekize-13-mwlik-ges-yatirimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/asunim-den-genese-natural-ortakligiyla-portekize-13-mwlik-ges-yatirimi\/","title":{"rendered":"13 MW Ges Investment in Portugal with Partnership from ASUN\u0130M"},"content":{"rendered":"<p><\/p>\n<h2>ASUN\u0130M, together with its partner G\u00e9nese Natural in Portugal, will invest 13 million Euros in the photovoltaic power plant located in Faro and will have an energy <img loading=\"lazy\" class=\"alignright wp-image-153935\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/asunimden-genese-natural-ortakligiyla-portekize-13-mwlik-ges-yatirimi.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/asunimden-genese-natural-ortakligiyla-portekize-13-mwlik-ges-yatirimi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/asunimden-genese-natural-ortakligiyla-portekize-13-mwlik-ges-yatirimi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/asunimden-genese-natural-ortakligiyla-portekize-13-mwlik-ges-yatirimi-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/asunimden-genese-natural-ortakligiyla-portekize-13-mwlik-ges-yatirimi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/asunimden-genese-natural-ortakligiyla-portekize-13-mwlik-ges-yatirimi-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>production capacity of 24 GWh per year.<\/h2>\n<p>While the construction of the <strong>GES power plant<\/strong>, which is located on a gross area of <strong>24 hectares<\/strong>, is currently underway, with more than <strong>24,000<\/strong> double-surface<strong> 540Wp<\/strong> solar panels distributed over an area of <strong>14 hectares<\/strong>, a total power of<strong> 13MWp<\/strong> is being installed. Production will be equivalent to the energy needs of <strong>7,000 houses.<\/strong><\/p>\n<p>While the <strong>Santa B\u00e1rbara de Nexe proje<\/strong>ct is planned to be completed in <strong>2022<\/strong>, it is aimed to build a solar power plant with a total installed power of<strong> 100MW<\/strong> in <strong>Portugal<\/strong>, including these investments by <strong>Genese Natural<\/strong>, a partnership of <strong>ASUN\u0130M.<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>ASUN\u0130M, together with its partner G\u00e9nese Natural in Portugal, will invest 13 million Euros in the photovoltaic power plant located in Faro and will have an energy production capacity of 24 GWh per year. While the construction of the GES power plant, which is located on a gross area of 24 hectares, is currently underway, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":153936,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[6742,18,77344,44580,96495,43953,21886,2206,102492,102491,4722,96502,43827,102494,102490,102493],"views":293,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/153929"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=153929"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/153929\/revisions"}],"predecessor-version":[{"id":153942,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/153929\/revisions\/153942"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/153936"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=153929"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=153929"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=153929"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}