{"id":153654,"date":"2022-04-05T12:22:16","date_gmt":"2022-04-05T09:22:16","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=153654"},"modified":"2022-04-05T12:22:16","modified_gmt":"2022-04-05T09:22:16","slug":"sedas-in-duzce-deki-yatirimlari-araliksiz-suruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sedas-in-duzce-deki-yatirimlari-araliksiz-suruyor\/","title":{"rendered":"(Turkish) &#8217;SEDA\u015e\u2019\u0131n D\u00fczce\u2019deki Yat\u0131r\u0131mlar\u0131 Aral\u0131ks\u0131z S\u00fcr\u00fcyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/153654\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>SEDA\u015e, 2021\u2019de tamamlad\u0131\u011f\u0131 projelerle 20.000 kilometrekarelik hizmet b\u00f6lgesine y\u00f6nelik yat\u0131r\u0131mlar\u0131n\u0131 art\u0131rd\u0131. Kentte artan enerji ihtiyac\u0131na yan\u0131t vermeyi hedefleyen yat\u0131r\u0131mlar\u0131n bir y\u0131l i\u00e7indeki tamamlanma oran\u0131 y\u00fcksek seviyelere ula\u015ft\u0131. SEDA\u015e b\u00f6ylelikle k\u00f6yler de dahil olmak \u00fczere il genelindeki alt ve \u00fcstyap\u0131 hizmetlerini<img loading=\"lazy\" class=\"alignright wp-image-153656\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/sedas-in-duzce-deki-yatirimlari-araliksiz-suruyor-2.jpg\" alt=\"\" width=\"320\" height=\"250\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/sedas-in-duzce-deki-yatirimlari-araliksiz-suruyor-2.jpg 470w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/sedas-in-duzce-deki-yatirimlari-araliksiz-suruyor-2-300x234.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/sedas-in-duzce-deki-yatirimlari-araliksiz-suruyor-2-64x50.jpg 64w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/> g\u00fc\u00e7lendirirken enerji kesintilerinde de iyile\u015fme kaydetti.<\/h2>\n<p><strong>D\u00fczce\u2019de<\/strong> y\u0131l i\u00e7inde tesis \u00e7al\u0131\u015fmas\u0131 bitirilen \u015febeke yat\u0131r\u0131m\u0131 kapsam\u0131nda <strong>175 km<\/strong> uzunlukta havai hat ve <strong>11 km<\/strong> uzunlukta yer alt\u0131 \u015febekesi \u00e7ekildi. Ayr\u0131ca <strong>54<\/strong> trafo postas\u0131, <strong>4.458<\/strong> beton direk, <strong>3.231<\/strong> armat\u00fcr ve <strong>6 kabinin montajlar\u0131<\/strong> tamamland\u0131. Konut in\u015faatlar\u0131n\u0131n h\u0131zland\u0131\u011f\u0131 ve n\u00fcfusun yo\u011funla\u015ft\u0131\u011f\u0131 b\u00f6lgeler ile k\u0131\u015f aylar\u0131ndaki <strong>kar ya\u011f\u0131\u015flar\u0131ndan<\/strong> etkilenen, <strong>ekonomik \u00f6mr\u00fc<\/strong> sona ermi\u015f <strong>k\u00f6y \u015febekelerine<\/strong> yap\u0131lan yat\u0131r\u0131mlarla<strong> enerji talepleri<\/strong> kar\u015f\u0131land\u0131. K\u00fc\u00e7\u00fck ek tesis \u00e7al\u0131\u015fmalar\u0131nda ise <strong>enerji m\u00fcsaadesi<\/strong> ba\u015fvurusunu ger\u00e7ekle\u015ftiren<strong> 300\u2019e yak\u0131n<\/strong> m\u00fc\u015fterinin <strong>tesis \u00e7al\u0131\u015fmas\u0131<\/strong> tamamland\u0131.<\/p>\n<p><img loading=\"lazy\" class=\"alignleft wp-image-153657\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/sedas-in-duzce-deki-yatirimlari-araliksiz-suruyor-3.jpg\" alt=\"\" width=\"320\" height=\"229\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/sedas-in-duzce-deki-yatirimlari-araliksiz-suruyor-3.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/sedas-in-duzce-deki-yatirimlari-araliksiz-suruyor-3-300x215.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/sedas-in-duzce-deki-yatirimlari-araliksiz-suruyor-3-500x358.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/sedas-in-duzce-deki-yatirimlari-araliksiz-suruyor-3-70x50.jpg 70w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>SEDA\u015e\u2019\u0131n y\u0131l boyunca <strong>D\u00fczce<\/strong> kent \u00e7ap\u0131nda kapsaml\u0131 bak\u0131m \u00e7al\u0131\u015fmalar\u0131 neticesinde; <strong>20 km<\/strong> havai hat \u015febeke, <strong>2 km<\/strong> yer alt\u0131 \u015febeke tesisi yenilerek <strong>523 beton<\/strong> direk ve <strong>237<\/strong> <strong>armat\u00fcr\u00fcn<\/strong> montaj\u0131 tamamland\u0131. Ayr\u0131ca<strong> SEDA\u015e ekiplerinin<\/strong> d\u00fczenli \u015febeke bak\u0131m i\u015flemlerine de devam edildi.<\/p>\n<h3><strong>Yat\u0131r\u0131mlar m\u00fc\u015fteri memnuniyetini art\u0131rd\u0131 <\/strong><\/h3>\n<p><strong>SEDA\u015e<\/strong> taraf\u0131ndan ger\u00e7ekle\u015ftirilen <strong>projeler<\/strong> ve<strong> bak\u0131m \u00e7al\u0131\u015fmalar\u0131<\/strong> sayesinde ortalama <strong>kesinti s\u00fcreleri<\/strong> ve s\u0131kl\u0131\u011f\u0131 b\u00fcy\u00fck \u00f6l\u00e7\u00fcde iyile\u015ftirilirken, <strong>m\u00fc\u015fteri memnuniyetinin<\/strong> art\u0131\u015f g\u00f6sterdi\u011fi g\u00f6zlemlendi. <strong>D\u00fczce\u2019deki<\/strong> talep say\u0131lar\u0131 ise bir \u00f6nceki y\u0131la g\u00f6re<strong> 2021\u2019de<\/strong> art\u0131\u015f g\u00f6stermesine ra\u011fmen, m\u00fc\u015fterilerden gelen <strong>\u015fikayet say\u0131lar\u0131<\/strong> bir \u00f6nceki y\u0131la g\u00f6re <strong>% 42<\/strong> oran\u0131nda azald\u0131. Yat\u0131r\u0131m faaliyetlerini ve iyile\u015ftirme aksiyonlar\u0131n\u0131 t\u00fcm h\u0131z\u0131yla s\u00fcrd\u00fcren SEDA\u015e, <strong>m\u00fc\u015fteri memnuniyetine<\/strong> y\u00f6nelik yeni d\u00f6nem \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcyor&#8230;<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. SEDA\u015e, 2021\u2019de tamamlad\u0131\u011f\u0131 projelerle 20.000 kilometrekarelik hizmet b\u00f6lgesine y\u00f6nelik yat\u0131r\u0131mlar\u0131n\u0131 art\u0131rd\u0131. Kentte artan enerji ihtiyac\u0131na yan\u0131t vermeyi hedefleyen yat\u0131r\u0131mlar\u0131n bir y\u0131l i\u00e7indeki [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":153658,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[26353,102342,2444],"views":74,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/153654"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=153654"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/153654\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/153658"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=153654"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=153654"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=153654"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}