{"id":153621,"date":"2022-04-04T13:57:50","date_gmt":"2022-04-04T10:57:50","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=153621"},"modified":"2022-04-04T13:59:42","modified_gmt":"2022-04-04T10:59:42","slug":"yeka-ges-4-yarismalari-08-nisan-da-yapiliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yeka-ges-4-yarismalari-08-nisan-da-yapiliyor\/","title":{"rendered":"(Turkish) YEKA GES-4 Yar\u0131\u015fmalar\u0131 08 Nisan\u2019da Yap\u0131l\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/153621\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>14\/07\/2021 tarih ve 31541 say\u0131l\u0131 Resmi Gazete\u2019de yay\u0131mlanan \u201cG\u00fcne\u015f Enerjisine Dayal\u0131 Yenilenebilir Enerji Kaynak Alanlar\u0131 ve Ba\u011flant\u0131 Kapasitelerinin Tahsisine \u0130li\u015fkin Yar\u0131\u015fma \u0130lan\u0131\u201d \u00e7er\u00e7evesinde yar\u0131\u015fmalar 08\/04\/2022 <img loading=\"lazy\" class=\"alignright wp-image-153623\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/yeka-ges-4-yarismalari-08-nisan-da-yapiliyor.jpg\" alt=\"\" width=\"320\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/yeka-ges-4-yarismalari-08-nisan-da-yapiliyor.jpg 601w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/yeka-ges-4-yarismalari-08-nisan-da-yapiliyor-300x211.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/yeka-ges-4-yarismalari-08-nisan-da-yapiliyor-500x351.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/04\/yeka-ges-4-yarismalari-08-nisan-da-yapiliyor-71x50.jpg 71w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>tarihinde saat 10:00\u2019da Bor-1, Bor-2 ve Bor-3 s\u0131ralamas\u0131yla ihaleler \u015feklinde yap\u0131lacakt\u0131r. Ni\u011fde\u2019nin Bor il\u00e7esi s\u0131n\u0131rlar\u0131nda yer alan YEKA i\u00e7in elektrik al\u0131m tavan fiyat\u0131 kilovatsaat ba\u015f\u0131na 95 kuru\u015f olarak belirlendi.<\/strong><\/h2>\n<p><strong>30 Mart 2022 tarihinde<\/strong>\u00a0YEKA GES-4 kapsam\u0131nda <strong>24 \u015firket<\/strong> taraf\u0131ndan<strong> Bor-1<\/strong> v<strong>e Bor-2 yar\u0131\u015fmas\u0131<\/strong> i\u00e7in <strong>18 <\/strong>ve <strong>Bor-3<\/strong> yar\u0131\u015fmas\u0131na y\u00f6nelik <strong>13<\/strong> olmak \u00fczere toplam <strong>49 yar\u0131\u015fma<\/strong> ba\u015fvurusu ger\u00e7ekle\u015fti.<\/p>\n<p><strong>Yar\u0131\u015fmalar i\u00e7in <a href=\"https:\/\/enerji.gov.tr\/Media\/Dizin\/BHIM\/tr\/Duyurular\/\/YKHKBasvuruSahipleri_202204011830.pdf\" target=\"_blank\" rel=\"noopener\">ekteki &gt;&gt;<\/a> ba\u015fvuru sahiplerinin yetkili temsilcilerine ait imza sirk\u00fcleri, yetki belgesi\/vek\u00e2letnameleri ve \u015firket ka\u015feleri ile kat\u0131l\u0131m sa\u011flamas\u0131 gerekiyor.<\/strong><\/p>\n<p><strong>Konuyla ilgili Bakanl\u0131k duyurusuna ula\u015fmak i\u00e7in <a href=\"https:\/\/enerji.gov.tr\/duyuru-detay?id=20232\" target=\"_blank\" rel=\"noopener\">T\u0131klay\u0131n&gt;&gt;&gt;<\/a><\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 14\/07\/2021 tarih ve 31541 say\u0131l\u0131 Resmi Gazete\u2019de yay\u0131mlanan \u201cG\u00fcne\u015f Enerjisine Dayal\u0131 Yenilenebilir Enerji Kaynak Alanlar\u0131 ve Ba\u011flant\u0131 Kapasitelerinin Tahsisine \u0130li\u015fkin Yar\u0131\u015fma \u0130lan\u0131\u201d [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":153623,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[58830,8767,18,2206,4899,101821],"views":253,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/153621"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=153621"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/153621\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/153623"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=153621"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=153621"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=153621"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}