{"id":152395,"date":"2022-03-14T19:00:45","date_gmt":"2022-03-14T16:00:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=152395"},"modified":"2022-03-14T19:01:27","modified_gmt":"2022-03-14T16:01:27","slug":"cernobil-nukleer-santrali-enerji-dagitim-agina-yeniden-baglandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cernobil-nukleer-santrali-enerji-dagitim-agina-yeniden-baglandi\/","title":{"rendered":"(Turkish) &#8217;\u00c7ernobil N\u00fckleer Santrali&#8217; Enerji Da\u011f\u0131t\u0131m A\u011f\u0131na Yeniden Ba\u011fland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/152395\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Ukrayna n\u00fckleer enerji kurulu\u015fu Energoatom taraf\u0131ndan <img loading=\"lazy\" class=\"alignright wp-image-152397\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/03\/cernobil-nukleer-santrali-enerji-dagitim-agina-yeniden-baglandi.jpg\" alt=\"\" width=\"320\" height=\"223\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/03\/cernobil-nukleer-santrali-enerji-dagitim-agina-yeniden-baglandi.jpg 589w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/03\/cernobil-nukleer-santrali-enerji-dagitim-agina-yeniden-baglandi-300x209.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/03\/cernobil-nukleer-santrali-enerji-dagitim-agina-yeniden-baglandi-500x348.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/03\/cernobil-nukleer-santrali-enerji-dagitim-agina-yeniden-baglandi-72x50.jpg 72w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Uluslararas\u0131 Atom Enerjisi Ajans\u0131&#8217;na (UAEA) \u00c7ernobil N\u00fckleer Santrali&#8217;nin (NPP) elektrik ba\u011flant\u0131s\u0131n\u0131n yeniden sa\u011fland\u0131\u011f\u0131 bildirildi.<\/h2>\n<p>Yap\u0131lan a\u00e7\u0131klamada,<em>\u201c<strong>NPC Ukrenergo<\/strong>\u2019nun (operat\u00f6r \u015firket) Ukraynal\u0131 uzmanlar\u0131, <strong>330 kV Les-\u00c7ernobil NGS<\/strong> hatt\u0131ndaki <strong>onar\u0131m \u00e7al\u0131\u015fmalar\u0131n\u0131 tamamlayarak<\/strong> \u00c7ernobil N\u00fckleer G\u00fc\u00e7 Santrali ile Slavuti\u00e7&#8217;e elektrik tedarikini yeniden ba\u015flatt\u0131\u201d<\/em> ifadelerine yer verildi.<\/p>\n<p>Daha \u00f6nceden yap\u0131lan a\u00e7\u0131klamada, <strong>Yedek g\u00fc\u00e7 sa\u011flayan jenerat\u00f6rlerin<\/strong> devreye al\u0131nd\u0131\u011f\u0131 fakat <strong>48 saat<\/strong> dayanabilece\u011fi ifade edilerek yak\u0131t \u00e7ubuklar\u0131n\u0131n<strong> so\u011futma i\u015flemlerini riske att\u0131\u011f\u0131<\/strong> ve<strong> radyasyon s\u0131z\u0131nt\u0131s\u0131 olabilece\u011fi<\/strong> belirtilmi\u015fti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ukrayna n\u00fckleer enerji kurulu\u015fu Energoatom taraf\u0131ndan Uluslararas\u0131 Atom Enerjisi Ajans\u0131&#8217;na (UAEA) \u00c7ernobil N\u00fckleer Santrali&#8217;nin (NPP) elektrik ba\u011flant\u0131s\u0131n\u0131n yeniden sa\u011fland\u0131\u011f\u0131 bildirildi. Yap\u0131lan a\u00e7\u0131klamada,\u201cNPC [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":152397,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[101753,101755,35992,101754,76811,5780,101756],"views":456,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/152395"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=152395"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/152395\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/152397"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=152395"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=152395"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=152395"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}