{"id":15228,"date":"2013-09-11T17:09:09","date_gmt":"2013-09-11T14:09:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=15228"},"modified":"2013-09-11T17:09:09","modified_gmt":"2013-09-11T14:09:09","slug":"koc-elektrikten-adiyamana-77-mwlik-hes","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/koc-elektrikten-adiyamana-77-mwlik-hes\/","title":{"rendered":"(Turkish) Ko\u00e7 Elektrik\u2019ten Ad\u0131yaman\u2019a 7,7 MW\u2019l\u0131k HES&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/15228\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ko\u00e7 Elektrik \u00dcretim Ltd. \u015eti. taraf\u0131ndan, Ad\u0131yaman \u0130li, G\u00f6lba\u015f\u0131 \u0130l\u00e7esinde, 7,773 MWm; 7,465 MWe kurulu g\u00fcc\u00fcnde, Ko\u00e7 Reg\u00fclat\u00f6r\u00fc ve HES Projesi kurulmas\u0131 hedefleniyor.<\/strong><\/p>\n<p>Proje i\u00e7in \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan \u00c7ED s\u00fcreci ba\u015flat\u0131lm\u0131\u015f olup, \u00c7ED olumlu belgesinin al\u0131nmas\u0131 halinde \u00fcretim lisans\u0131n\u0131n da Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK) taraf\u0131ndan verilmesi hedefleniyor.<\/p>\n<p><strong>HES \u0130\u00c7\u0130N 4,3 M\u0130LYON DOLAR YATIRIM YAPILACAK<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/koc-elektrikten-adiyamana-77-mwlik-hes.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-15229\" title=\"koc-elektrik-ten-adiyaman-a-77-mwlik-hes\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/koc-elektrikten-adiyamana-77-mwlik-hes-300x196.jpg\" alt=\"\" width=\"300\" height=\"196\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/koc-elektrikten-adiyamana-77-mwlik-hes-300x196.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/koc-elektrikten-adiyamana-77-mwlik-hes-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/koc-elektrikten-adiyamana-77-mwlik-hes.jpg 389w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><br \/>\nProje\u2019nin yakla\u015f\u0131k yat\u0131r\u0131m bedeli, 4.329.301 USD olarak belirlendi. Ko\u00e7 Reg\u00fclat\u00f6r\u00fc ve HES Projesi ile 7,773 MWm; 7,465 MWe kurulu g\u00fc\u00e7le 8.06 GWh\/y\u0131l firm enerji, 20.7 GWh\/y\u0131l sekonder enerji olmak \u00fczere y\u0131lda toplam 28.76 GWh\/y\u0131l enerji \u00fcretilmesi planlan\u0131yor.<\/p>\n<p><strong>PROJE\u2019N\u0130N \u00d6ZELL\u0130KLER\u0130<\/strong><br \/>\nKo\u00e7 Reg\u00fclat\u00f6r\u00fc ve HES projesi ile Kap\u0131 deresi \u00fczerinde 992.00 m talveg kotunda Ko\u00e7 Reg\u00fclat\u00f6r\u00fc ile toplanan suyun 1.130 m uzunlu\u011fundaki iletim t\u00fcneli ve 4.020 m uzunlu\u011fundaki kapal\u0131 iletim kanal\u0131 vas\u0131tas\u0131 ile y\u00fckleme havuzuna iletilmesi ve y\u00fckleme havuzundan sonra 215.00 m uzunlu\u011fundaki cebri boru ile 935.00 m kuyruksuyu kotunda bulunan santral binas\u0131na al\u0131nmas\u0131 sureti ile enerji \u00fcretimi planlan\u0131yor.<br \/>\nProje kapsam\u0131nda reg\u00fclat\u00f6r, su alma yap\u0131s\u0131, \u00e7\u00f6keltim havuzu, iletim t\u00fcneli ve kanal\u0131, y\u00fckleme havuzu, cebri boru, santral binas\u0131 ve kuyruksuyu kanal\u0131 in\u015fa edilecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/koc-elektrikten-adiyamana-77-mwlik-hes_4846.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ko\u00e7 Elektrik \u00dcretim Ltd. \u015eti. taraf\u0131ndan, Ad\u0131yaman \u0130li, G\u00f6lba\u015f\u0131 \u0130l\u00e7esinde, 7,773 MWm; 7,465 MWe kurulu g\u00fcc\u00fcnde, Ko\u00e7 Reg\u00fclat\u00f6r\u00fc ve HES Projesi kurulmas\u0131 hedefleniyor. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":15229,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[3115,63,67,1009,749,165,18,750,8524,35370,1090,8523,8525],"views":1151,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/15228"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=15228"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/15228\/revisions"}],"predecessor-version":[{"id":15231,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/15228\/revisions\/15231"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/15229"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=15228"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=15228"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=15228"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}