{"id":151793,"date":"2022-03-04T13:40:30","date_gmt":"2022-03-04T10:40:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=151793"},"modified":"2022-03-04T13:40:30","modified_gmt":"2022-03-04T10:40:30","slug":"uedas-tan-13-750-kilometrelik-enerji-bakimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/uedas-tan-13-750-kilometrelik-enerji-bakimi\/","title":{"rendered":"(Turkish) UEDA\u015e&#8217;tan 13.750 Kilometrelik Enerji Bak\u0131m\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/151793\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>G\u00fcney Marmara\u2019da elektrik da\u011f\u0131t\u0131m hizmeti veren Uluda\u011f Elektrik Da\u011f\u0131t\u0131m A.\u015e.(UEDA\u015e), b\u00f6lgesinde ger\u00e7ekle\u015ftirdi\u011fi planl\u0131 bak\u0131m \u00e7al\u0131\u015fmalar\u0131yla kesinti say\u0131lar\u0131nda % 10\u2019luk azalma sa\u011flayarak m\u00fc\u015fteri memnuniyetini art\u0131rd\u0131. <\/strong><\/h2>\n<p><strong>Bursa, Bal\u0131kesir, \u00c7anakkale<\/strong> ve <strong>Yalova<\/strong>\u2019da d\u00fcnyay\u0131 <strong>1.2 kat<\/strong> dola\u015fabilecek uzunluktaki <strong>elektrik a\u011f\u0131<\/strong> ile <strong>5 milyonun \u00fczerinde<\/strong> n\u00fcfusa enerji hizmeti sa\u011flayan<strong> UEDA\u015e<\/strong>, <strong>7\/24<\/strong> planl\u0131 bak\u0131m \u00e7al\u0131\u015fmalar\u0131yla da <img loading=\"lazy\" class=\"alignright wp-image-151795\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/03\/uedas-tan-13-750-kilometrelik-enerji-bakimi-2.jpg\" alt=\"\" width=\"320\" height=\"232\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/03\/uedas-tan-13-750-kilometrelik-enerji-bakimi-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/03\/uedas-tan-13-750-kilometrelik-enerji-bakimi-2-300x218.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/03\/uedas-tan-13-750-kilometrelik-enerji-bakimi-2-500x363.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/03\/uedas-tan-13-750-kilometrelik-enerji-bakimi-2-69x50.jpg 69w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>enerji s\u00fcreklili\u011fini koruyor.<\/p>\n<p>Enerji s\u00fcreklili\u011finin temelinde \u015febekenin bak\u0131m \u00e7al\u0131\u015fmalar\u0131na dikkat \u00e7eken UEDA\u015e Genel M\u00fcd\u00fcr\u00fc G\u00f6kay Fatih Danac\u0131, <em>\u201cPlanl\u0131 bak\u0131mlar\u0131m\u0131z\u0131 ve do\u011fru yat\u0131r\u0131mlar\u0131 yaparak tedarik s\u00fcreklili\u011fimizi sa\u011fl\u0131yoruz. Bu noktada 2021 rakamlar\u0131m\u0131z a\u00e7\u0131kland\u0131. <strong>Orta gerilim ar\u0131zalar\u0131<\/strong>nda ve kesilme s\u0131kl\u0131\u011f\u0131nda <strong>y\u00fczde 10<\/strong>\u2019luk bir azalma sa\u011fland\u0131. \u00c7ok b\u00fcy\u00fck bir \u015febekeyi y\u00f6netiyoruz. 2021 y\u0131l\u0131nda <strong>5 binin<\/strong> \u00fczerinde trafoya bak\u0131m,<strong> 289 bin<\/strong> dire\u011fimize kontrol\u00fc yap\u0131larak<strong> bak\u0131m\u0131<\/strong> tamamland\u0131. Toplamda <strong>500 binin \u00fczerinde<\/strong> ayd\u0131nlatmam\u0131z var bunlar\u0131n da<strong> 42 binine bak\u0131m<\/strong> sa\u011flad\u0131k. Enerji nakil hatlar\u0131nda ise <strong>13 bin kilometrenin<\/strong> \u00fczerinde \u015febekeye bak\u0131m ger\u00e7ekle\u015ftirildi<\/em> &#8220;dedi.<\/p>\n<h3><strong>\u2018PLANLI BAKIM , ARIZA \u0130LE KARI\u015eTIRILIYOR\u2019 <\/strong><\/h3>\n<p><strong>Planl\u0131 bak\u0131m<\/strong>\u0131n <strong>ar\u0131za kesintisiyle<\/strong> kar\u0131\u015ft\u0131r\u0131ld\u0131\u011f\u0131na dikkat \u00e7eken UEDA\u015e Genel M\u00fcd\u00fcr\u00fc,<em> \u201cElektrikte bir ar\u0131zan\u0131n olu\u015fmamas\u0131 i\u00e7in atmosfere a\u00e7\u0131k \u015febekemizin bak\u0131m\u0131n\u0131n yap\u0131lmas\u0131 \u015fart. Tabi bu \u00e7al\u0131\u015fmay\u0131 yaparken elektri\u011fi kesmek zorunday\u0131z. <strong>\u0130\u015f sa\u011fl\u0131\u011f\u0131 ve g\u00fcvenli\u011fi<\/strong> gere\u011fi enerji alt\u0131nda \u00e7al\u0131\u015fma yap\u0131lamaz. <strong>UEDA\u015e<\/strong> olarak <strong>abonelerimizin ma\u011fduriyet ya\u015famamas\u0131<\/strong> ad\u0131na planl\u0131 \u00e7al\u0131\u015fmalar\u0131 \u00f6nceden duyuruyoruz. Kesintiden etkilenebilecek abonelere<strong> 5 g\u00fcn<\/strong> \u00f6ncesinde<strong> SMS<\/strong> ile bilgilendirme yap\u0131l\u0131rken , <strong>internet sitemizde de<\/strong> <span style=\"text-decoration: underline;\">g\u00fcncel<\/span> olarak duyurular\u0131m\u0131z yay\u0131nlan\u0131yor\u201d<\/em> diye a\u00e7\u0131klad\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. G\u00fcney Marmara\u2019da elektrik da\u011f\u0131t\u0131m hizmeti veren Uluda\u011f Elektrik Da\u011f\u0131t\u0131m A.\u015e.(UEDA\u015e), b\u00f6lgesinde ger\u00e7ekle\u015ftirdi\u011fi planl\u0131 bak\u0131m \u00e7al\u0131\u015fmalar\u0131yla kesinti say\u0131lar\u0131nda % 10\u2019luk azalma sa\u011flayarak m\u00fc\u015fteri [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":151796,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[15016,26353,82617,19241,6600,50892,2227,79944],"views":116,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/151793"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=151793"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/151793\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/151796"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=151793"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=151793"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=151793"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}