{"id":151777,"date":"2022-03-04T12:44:52","date_gmt":"2022-03-04T09:44:52","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=151777"},"modified":"2022-03-04T12:47:46","modified_gmt":"2022-03-04T09:47:46","slug":"bolero-corap-fabrikasi-cati-ustu-ges-ile-enerjisi-nin-yuzde-48-39-unu-karsiliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bolero-corap-fabrikasi-cati-ustu-ges-ile-enerjisi-nin-yuzde-48-39-unu-karsiliyor\/","title":{"rendered":"(Turkish) &#8217;Bolero \u00c7orap Fabrikas\u0131&#8217; \u00c7at\u0131 \u00dcst\u00fc GES ile Enerji&#8217;sinin % 48,39&#8217;unu Kar\u015f\u0131l\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/151777\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong><img loading=\"lazy\" class=\"alignright wp-image-151781\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/03\/bolero-corap-fabrikasi-cati-ustu-ges-ile-enerjisinin-yuzde-48-39-unu-karsiliyor.jpg\" alt=\"\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/03\/bolero-corap-fabrikasi-cati-ustu-ges-ile-enerjisinin-yuzde-48-39-unu-karsiliyor.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/03\/bolero-corap-fabrikasi-cati-ustu-ges-ile-enerjisinin-yuzde-48-39-unu-karsiliyor-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/03\/bolero-corap-fabrikasi-cati-ustu-ges-ile-enerjisinin-yuzde-48-39-unu-karsiliyor-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/03\/bolero-corap-fabrikasi-cati-ustu-ges-ile-enerjisinin-yuzde-48-39-unu-karsiliyor-67x50.jpg 67w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/strong><\/h2>\n<h2><strong>T\u00fcrkiye\u2019nin \u00f6nde gelen iplik ve \u00e7orap ihracat\u00e7\u0131lar\u0131 aras\u0131nda yerini alan Bolero \u00c7orap\u2019\u0131n \u0130stanbul\u2019da yer alan fabrika \u00e7at\u0131s\u0131na kurulan GES projesi hayata ge\u00e7irildi.<\/strong><\/h2>\n<p>Bolero \u00c7orap hem fabrikan\u0131n <strong>%48,39<\/strong> elektrik ihtiyac\u0131n\u0131 <strong>yenilenebilir enerjiden<\/strong> kar\u015f\u0131layarak maliyetlerini ciddi oranda d\u00fc\u015f\u00fcrecek hem de<strong> 8368.674 ton CO2<\/strong> emisyonunu engelleyerek \u00fcr\u00fcnlerini <strong>temiz enerji<\/strong> ile \u00fcretmi\u015f olacak.<\/p>\n<p><strong>639,91kWp<\/strong> g\u00fcce sahip olan projede <strong>Phono Solar<\/strong> g\u00fcne\u015f panelleri ve <strong>SMA<\/strong> marka <strong>inverter<\/strong> kullan\u0131ld\u0131. <strong>ASUNIM<\/strong>\u2019in projeye <strong>\u00f6zel m\u00fchendislik tasar\u0131m\u0131<\/strong> sayesinde g\u00fcne\u015ften daha fazla yararlan\u0131lmas\u0131 i\u00e7in \u00e7at\u0131da <strong>4 y\u00f6nl\u00fc panel<\/strong> yerle\u015fimi ger\u00e7ekle\u015ftirildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin \u00f6nde gelen iplik ve \u00e7orap ihracat\u00e7\u0131lar\u0131 aras\u0131nda yerini alan Bolero \u00c7orap\u2019\u0131n \u0130stanbul\u2019da yer alan fabrika \u00e7at\u0131s\u0131na kurulan GES projesi hayata ge\u00e7irildi. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":151781,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[6742,101422,24218,7440,2206,1967,101423,90187,13708],"views":227,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/151777"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=151777"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/151777\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/151781"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=151777"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=151777"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=151777"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}