{"id":151520,"date":"2022-02-26T17:30:18","date_gmt":"2022-02-26T14:30:18","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=151520"},"modified":"2022-02-26T17:30:18","modified_gmt":"2022-02-26T14:30:18","slug":"akca-hazir-beton-denizlide-3-mw-kapasiteli-ges-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akca-hazir-beton-denizlide-3-mw-kapasiteli-ges-kuracak\/","title":{"rendered":"(Turkish) &#8217;Ak\u00e7a Haz\u0131r Beton&#8217; Denizli&#8217;de 3 MW Kapasiteli Ges Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/151520\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Denizli \/ Pamukkale &#8211; G\u00f6zler Mahallesi&#8217;nde Ak\u00e7a Haz\u0131r <img loading=\"lazy\" class=\"alignright wp-image-151523\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/02\/akca-hazir-beton-denizlide-3-mw-kapasiteli-ges-kuracak.jpg\" alt=\"\" width=\"320\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/02\/akca-hazir-beton-denizlide-3-mw-kapasiteli-ges-kuracak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/02\/akca-hazir-beton-denizlide-3-mw-kapasiteli-ges-kuracak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/02\/akca-hazir-beton-denizlide-3-mw-kapasiteli-ges-kuracak-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/02\/akca-hazir-beton-denizlide-3-mw-kapasiteli-ges-kuracak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/02\/akca-hazir-beton-denizlide-3-mw-kapasiteli-ges-kuracak-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Beton taraf\u0131ndan 3 MW kapasiteye sahip G\u00fcne\u015f Santrali (GES) kurularak i\u015fletilecek.<\/h2>\n<p>Yakla\u015f\u0131k <strong>43.000 m2<\/strong>&#8216;lik alan da<strong> 3 MW<\/strong> kapasiteye sahip G\u00fcne\u015f Enerjisi Santrali&#8217;nin <strong>kurulmas\u0131<\/strong> ve <strong>i\u015fletilmesi<\/strong> planlan\u0131rken <strong>santralin yat\u0131r\u0131m maliyeti<\/strong> ise yakla\u015f\u0131k<strong> 10 milyon TL<\/strong>&#8216;dir.<\/p>\n<p>Kurulumu yap\u0131lacak g\u00fcne\u015f santrali&#8217;nde <strong>7200 adet<\/strong> g\u00fcne\u015f paneli ve <strong>30 adet<\/strong> invert\u00f6r yer alacak. G\u00fcne\u015f santralinde \u00fcretilen<strong> enerji iletim hatlar\u0131<\/strong> ile<strong> \u015febekeye<\/strong> verilecektir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Denizli \/ Pamukkale &#8211; G\u00f6zler Mahallesi&#8217;nde Ak\u00e7a Haz\u0131r Beton taraf\u0131ndan 3 MW kapasiteye sahip G\u00fcne\u015f Santrali (GES) kurularak i\u015fletilecek. Yakla\u015f\u0131k 43.000 m2&#8216;lik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":151523,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[101281,845,68,9757,7064,23311,18,2326,227,2206,26729,50253,21101],"views":279,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/151520"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=151520"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/151520\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/151523"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=151520"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=151520"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=151520"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}