{"id":15084,"date":"2013-09-09T09:43:55","date_gmt":"2013-09-09T06:43:55","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=15084"},"modified":"2013-09-09T09:43:55","modified_gmt":"2013-09-09T06:43:55","slug":"elektrikli-arac-sarj-yerlerinin-kurulmasi-mevzuat-altyapisi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/elektrikli-arac-sarj-yerlerinin-kurulmasi-mevzuat-altyapisi\/","title":{"rendered":"(Turkish) Elektrikli Ara\u00e7 \u015earj Yerlerinin Kurulmas\u0131 Mevzuat Altyap\u0131s\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/15084\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>8.9.2013 tarihli Resmi Gazetede yay\u0131nlanan Planl\u0131 Alanlar Tip \u0130mar Y\u00f6netmeli\u011finde De\u011fi\u015fiklik Yap\u0131larak Akaryak\u0131t, \u015earj ve Servis \u0130stasyonlar\u0131\u2019n\u0131n durumu d\u00fczenlenmi\u015ftir. An\u0131lan madde uyar\u0131nca \u2018\u2019\u0130mar planlar\u0131nda akaryak\u0131t istasyonu olarak belirlenen alanlarda istasyonlar aras\u0131 mesafe ve di\u011fer kriterlerle ilgili mevzuata uyulmas\u0131 \u015fart\u0131yla; akaryak\u0131t ve servis istasyonlar\u0131, CNG oto gaz istasyonlar\u0131, LPG oto gaz istasyonlar\u0131, hidrojen \u00fcretim ve dolum istasyonlar\u0131 yap\u0131labilir.<\/strong><\/p>\n<p>Yap\u0131 y\u00fcksekli\u011fi iki kat\u0131 ge\u00e7memek \u015fart\u0131yla; b\u00fcnyelerinde kullan\u0131c\u0131lar\u0131n asgari ihtiya\u00e7lar\u0131n\u0131 kar\u015f\u0131layacak oto-market, \u00e7ay oca\u011f\u0131, b\u00fcfe, oto elektrik, lastik\u00e7i, y\u0131kama ya\u011flama gibi fonksiyonlar yer alabilir. Yak\u0131t tank\u0131 ve borulama sistemlerinin bak\u0131m, tadilat veya onar\u0131mlar\u0131n\u0131n, TSE standartlar\u0131 ve ilgili kurumlar\u0131n g\u00f6r\u00fc\u015f\u00fc do\u011frultusunda yap\u0131lmas\u0131 zorunludur.<\/p>\n<p><strong>Elektrik enerjisi<\/strong> ile \u00e7al\u0131\u015fan ara\u00e7lar\u0131n \u015farj edilmeleri i\u00e7in, ilgili elektrik kurumunun, olumlu g\u00f6r\u00fc\u015f\u00fc ile otoparklar, akaryak\u0131t istasyonlar\u0131 veya di\u011fer uygun yerlerde <strong>elektrikli ara\u00e7 \u015farj yeri<\/strong> yap\u0131labilir.\u201d<\/p>\n<h2>Elektrik enerjisi ile \u00e7al\u0131\u015fan ara\u00e7lar\u0131n yayg\u0131nla\u015fmas\u0131 bu d\u00fczenlemeyi zorunlu k\u0131lm\u0131\u015ft\u0131r<\/h2>\n<p>Konuyu de\u011ferlendiren Enerji Yat\u0131r\u0131m Uzman\u0131 Cengiz G\u00dcNE\u015e \u2019\u2019D\u00fczenleme Y\u00f6netmelikte olmayan bir maddenin eklenmesidir, yeni bir d\u00fczenlemedir, burada en \u00f6nemli konu maddenin \u00fc\u00e7\u00fcnc\u00fc f\u0131kras\u0131 ile getirilen elektrik enerjisi ile \u00e7al\u0131\u015fan ara\u00e7lar\u0131n \u015farj edilmeleri i\u00e7in,ilgili elektrik kurumunun, olumlu g\u00f6r\u00fc\u015f\u00fc ile otoparklar, akaryak\u0131t istasyonlar\u0131 veya di\u011fer uyg<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/elektrikli-arac-oto-sarj-istasyonu-500x361.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-15085\" title=\"elektrikli-arac-oto-sarj-istasyonu-500x361\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/elektrikli-arac-oto-sarj-istasyonu-500x361-300x206.jpg\" alt=\"\" width=\"300\" height=\"206\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/elektrikli-arac-oto-sarj-istasyonu-500x361-300x206.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/elektrikli-arac-oto-sarj-istasyonu-500x361-72x50.jpg 72w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/elektrikli-arac-oto-sarj-istasyonu-500x361.jpg 469w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>un yerlerde elektrikli ara\u00e7 \u015farj yeri yap\u0131labilir, f\u0131kras\u0131n\u0131n oldu\u011funu ifade ederek \u201celektrik enerjisi ile \u00e7al\u0131\u015fan ara\u00e7lar\u0131n yayg\u0131nla\u015fmas\u0131 bu d\u00fczenlemeyi zorunlu k\u0131lm\u0131\u015ft\u0131r, yap\u0131lan d\u00fczenlemede elektrik kurumunun olumlu g\u00f6r\u00fc\u015f\u00fc ile akaryak\u0131t istasyonlar\u0131 d\u0131\u015f\u0131nda da \u015farj istasyonlar\u0131n\u0131n kurulmas\u0131na imk\u00e2n sa\u011flanmaktad\u0131r. \u00d6zellikle akaryak\u0131t istasyonlar\u0131 d\u0131\u015f\u0131nda di\u011fer uygun yerlerde elektrikli ara\u00e7 \u015farj yeri yap\u0131labilmesinin \u00f6n\u00fcn\u00fcn a\u00e7\u0131lmas\u0131 \u00f6nemlidir.<\/p>\n<h2>Elektrik kurumu tabiri hatal\u0131<\/h2>\n<p>A\u00e7\u0131kl\u0131k kazand\u0131r\u0131lmas\u0131 gereken ilk nokta olumlu g\u00f6r\u00fc\u015f\u00fc verecek elektrik kurumu tabiridir,4628 ve 6446 say\u0131l\u0131 Kanunlarda ve ikincil mevzuatta bu t\u00fcr bir tabir yer almamaktad\u0131r, \u015farj istasyonunun \u015febekeye ba\u011flant\u0131s\u0131 a\u00e7\u0131s\u0131ndan de\u011ferlendirildi\u011finde olumlu g\u00f6r\u00fc\u015f\u00fcn da\u011f\u0131t\u0131m \u015firketleri taraf\u0131ndan verilmesi gerekti\u011fi sonucu \u00e7\u0131kmaktad\u0131r. \u0130stasyonlar\u0131n kurulu\u015f izninin ise EPDK taraf\u0131ndan verilece\u011fi a\u00e7\u0131kt\u0131r. Bu noktada mevcut akaryak\u0131t istasyonlar\u0131na \u015farj istasyonu da kurmak isteyen bayilerin lisanslar\u0131n\u0131 tadil ettirmeleri, akaryak\u0131t istasyonu d\u0131\u015f\u0131nda bir alanda elektrikli ara\u00e7 \u015farj yeri kurulmas\u0131 durumunda ise bize g\u00f6re yeni lisans al\u0131nmas\u0131 gerekmektedir.<\/p>\n<h2>Ek mevzuat de\u011fi\u015fiklikleri gerekiyor<\/h2>\n<p>Di\u011fer taraftan Petrol Piyasas\u0131 Lisans Y\u00f6netmeli\u011finde de\u011fi\u015fikli\u011fe gidilerek bayilik lisans\u0131 tan\u0131m\u0131na elektrik teslimini eklemek gerekir. Zira mevcut d\u00fczenlemede bayilik lisans\u0131 sahipleri piyasada, lisanslar\u0131nda d\u00fczenlenen alt ba\u015fl\u0131\u011fa g\u00f6re akaryak\u0131t bayisi, ihrakiye bayisi; kategoriye g\u00f6re ise istasyonlu bayi ve istasyonsuz bayi olarak bayisi oldu\u011fu da\u011f\u0131t\u0131c\u0131dan temin etti\u011fi akaryak\u0131t veya ihrakiyenin kullan\u0131c\u0131lara sat\u0131\u015f\u0131 faaliyetinde bulunabilmektedir.<\/p>\n<p>\u00d6te yandan elektrikli ara\u00e7lara elektrik enerjisi teslimi bayiler i\u00e7in elektri\u011fin tekrar sat\u0131\u015f i\u00e7in al\u0131\u015f\u0131n\u0131 ifade etti\u011finden bu t\u00fcr faaliyette bulunan bayiler i\u00e7in tedarik lisans\u0131 al\u0131n\u0131p al\u0131nmayaca\u011f\u0131, bu t\u00fcr teslimlere istisna getirilmesi 6446 say\u0131l\u0131 Kanunda d\u00fczenlenmelidir. Elektrikli otomobillere sat\u0131\u015f mevcut mevzuatta perakende elektrik enerjisi teslimidir. Konu hem elektrik hem de petrol piyasas\u0131 mevzuat\u0131n\u0131 ilgilendirmektedir.\u2019\u2019\u015feklinde a\u00e7\u0131klamada bulunmu\u015ftur.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/09\/09\/elektrikli-arac-sarj-yerlerinin-kurulmasi-mevzuat-altyapisina-kavustu\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.8.9.2013 tarihli Resmi Gazetede yay\u0131nlanan Planl\u0131 Alanlar Tip \u0130mar Y\u00f6netmeli\u011finde De\u011fi\u015fiklik Yap\u0131larak Akaryak\u0131t, \u015earj ve Servis \u0130stasyonlar\u0131\u2019n\u0131n durumu d\u00fczenlenmi\u015ftir. An\u0131lan madde uyar\u0131nca \u2018\u2019\u0130mar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":15085,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[8406,61,215,8404,63,67,1009,165,8405,2048,1273,8403],"views":1107,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/15084"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=15084"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/15084\/revisions"}],"predecessor-version":[{"id":15086,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/15084\/revisions\/15086"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/15085"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=15084"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=15084"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=15084"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}