{"id":150401,"date":"2022-02-04T15:17:57","date_gmt":"2022-02-04T12:17:57","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=150401"},"modified":"2022-02-04T15:17:57","modified_gmt":"2022-02-04T12:17:57","slug":"eaton-elektrikli-arac-sarj-istasyonlarina-yonelik-ucay-grup-ile-calisacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/eaton-elektrikli-arac-sarj-istasyonlarina-yonelik-ucay-grup-ile-calisacak\/","title":{"rendered":"(Turkish) &#8217;EATON&#8217; Elektrikli Ara\u00e7 \u015earj \u0130stasyonlar\u0131na Y\u00f6nelik \u00dc\u00e7ay Grup ile \u00c7al\u0131\u015facak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/150401\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>TOGG projesinin h\u0131z kazanmas\u0131yla T\u00fcrkiye\u2019nin elektrikli ara\u00e7lar i\u00e7in ihtiyac\u0131 olan h\u0131zl\u0131 \u015farj istasyonlar\u0131n\u0131n altyap\u0131s\u0131 konu\u015fulmaya ba\u015fland\u0131. T\u00fcrkiye\u2019nin 81 ilinde, 56 \u015fube ve y\u00fczlerce bayisi bulunan \u00dc\u00e7ay Grup, d\u00fcnyaca \u00fcnl\u00fc g\u00fc\u00e7 y\u00f6netim firmas\u0131 Eaton ile anla\u015farak, elektrikli \u015farj istasyonlar\u0131n\u0131 \u00fclke \u00e7ap\u0131nda yayg\u0131nla\u015fmas\u0131 i\u00e7in haz\u0131rl\u0131klar\u0131n\u0131 tamamlad\u0131\u011f\u0131n\u0131 duyurdu.<\/h2>\n<p>Ge\u00e7ti\u011fimiz Ekim ay\u0131nda imzalanan anla\u015fmayla <strong>\u00dc\u00e7ay Grup<\/strong>, elektrikli ara\u00e7lar\u0131n \u015farj istasyonlar\u0131 sat\u0131\u015f\u0131nda ve servisinde tek yetkili haline gelmi\u015fti.<\/p>\n<h3><strong>\u2018\u015eARJ \u0130STASYONU YATIRIMLARI HEN\u00dcZ YETERL\u0130 SEV\u0130YEDE DE\u011e\u0130L\u2019<\/strong><\/h3>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-150403\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/02\/eaton-elektrikli-arac-sarj-istasyonlarina-yonelik-ucay-grup-ile-calisacak-2.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/02\/eaton-elektrikli-arac-sarj-istasyonlarina-yonelik-ucay-grup-ile-calisacak-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/02\/eaton-elektrikli-arac-sarj-istasyonlarina-yonelik-ucay-grup-ile-calisacak-2-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/02\/eaton-elektrikli-arac-sarj-istasyonlarina-yonelik-ucay-grup-ile-calisacak-2-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/02\/eaton-elektrikli-arac-sarj-istasyonlarina-yonelik-ucay-grup-ile-calisacak-2-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/02\/eaton-elektrikli-arac-sarj-istasyonlarina-yonelik-ucay-grup-ile-calisacak-2-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>TOGG projesinde<\/strong> tasar\u0131mlar\u0131n ortaya konuldu\u011funu, 2023 y\u0131l\u0131n\u0131n ilk \u00e7eyre\u011finde \u00fcretime ba\u015flanaca\u011f\u0131n\u0131 hat\u0131rlatan \u00dc\u00e7ay Grup CEO\u2019su <strong>Turan \u015eakac\u0131<\/strong>, <em>\u201cElektrikli ara\u00e7lar\u0131n yayg\u0131nla\u015fmaya ba\u015flamas\u0131yla, elektrikli ara\u00e7lar\u0131n kullan\u0131m\u0131 i\u00e7in \u015fart olan<strong> \u015farj istasyonlar\u0131na<\/strong> yap\u0131lan yat\u0131r\u0131mlar artmaya ba\u015flad\u0131. \u015earj istasyonlar\u0131n\u0131n say\u0131s\u0131 yap\u0131lan yat\u0131r\u0131mlarla artsa da hen\u00fcz <strong>yeterli say\u0131da de\u011fil.<\/strong> <strong>Eaton<\/strong> ile imzalad\u0131\u011f\u0131m\u0131z anla\u015fma sonras\u0131<strong> elektrikli ara\u00e7lar<\/strong> i\u00e7in hayati \u00f6nem ta\u015f\u0131yan <strong>elektrikli \u015farj istasyonlar\u0131<\/strong>n\u0131 \u00fclkemize getirmeye ba\u015flad\u0131k. T\u00fcm sat\u0131\u015f ve sat\u0131\u015f sonras\u0131 temsilcili\u011fini \u00fcstlenece\u011fiz.\u201d<\/em> diye konu\u015ftu.<\/p>\n<h3><strong>\u2018\u00dcLKEM\u0130ZE EN VER\u0130ML\u0130 \u00dcR\u00dcNLER\u0130 GET\u0130R\u0130YORUZ\u2019<\/strong><\/h3>\n<p>T\u00fcrkiye\u2019nin <strong>elektrikli \u015farj istasyonu yat\u0131r\u0131mlar\u0131<\/strong> i\u00e7in yabanc\u0131 kayna\u011fa ihtiya\u00e7 duymad\u0131\u011f\u0131n\u0131 belirten Turan \u015eakac\u0131, <em>\u201cEaton, <strong>elektrikli \u015farj istasyonlar\u0131<\/strong> konusunda d\u00fcnyada \u00f6nc\u00fc olmu\u015f bir firma, yabanc\u0131 yat\u0131r\u0131mc\u0131lar\u0131n T\u00fcrkiye\u2019deki elektrikli ara\u00e7 potansiyelini g\u00f6rd\u00fc\u011f\u00fcn\u00fc ve bunun i\u00e7in yat\u0131r\u0131ma haz\u0131rland\u0131\u011f\u0131n\u0131 g\u00f6r\u00fcyoruz. Ancak T\u00fcrkiye kendi kaynaklar\u0131yla \u00fclkenin d\u00f6rt bir yan\u0131nda elektrikli \u015farj istasyonlar\u0131 kurabilir. D\u00fcnyan\u0131n bu konudaki<strong> en verimli \u00fcr\u00fcnlerini kullan\u0131ma<\/strong> a\u00e7arak T\u00fcrk yat\u0131r\u0131mc\u0131lar\u0131n\u0131n bu alanda rahatl\u0131kla hareket edebilmelerine olanak tan\u0131yoruz\u201d<\/em> ifadelerini kulland\u0131.<\/p>\n<h3><strong>\u2018TOGG\u2019UN POTANS\u0130YEL\u0130NE \u0130NANIYORUZ VE YATIRIMLARIMIZI HIZLANDIRACA\u011eIZ\u2019<\/strong><\/h3>\n<p>Elektrikli ara\u00e7lar\u0131n <strong>1990\u2019lar\u0131n<\/strong> sonu, <strong>2000\u2019lerin<\/strong> ba\u015f\u0131nda ya\u015fad\u0131\u011f\u0131m\u0131z<strong> cep telefonlar\u0131n\u0131n y\u00fckseli\u015fine<\/strong> benzer bir \u015fekilde <strong>otomotiv sekt\u00f6r\u00fcn\u00fc d\u00f6n\u00fc\u015ft\u00fcrece\u011fini<\/strong> vurgulayan Turan \u015eakac\u0131,<\/p>\n<p><em>\u201c<strong>T\u00fcrkiye\u2019nin d\u00f6n\u00fc\u015f\u00fcm\u00fc<\/strong> hen\u00fcz ba\u015f\u0131nda fark edip yat\u0131r\u0131mlar\u0131n\u0131 bu y\u00f6nde ger\u00e7ekle\u015ftirmesi, <strong>elektrik ara\u00e7lara d\u00f6n\u00fc\u015f\u00fcm\u00fcn<\/strong> \u00fclkemizde daha h\u0131zl\u0131 ger\u00e7ekle\u015fece\u011fine dair inanc\u0131m\u0131z\u0131 g\u00fc\u00e7lendiriyor. <strong>Bu inan\u00e7la \u00dc\u00e7ay Grup olarak 2022 y\u0131l\u0131 i\u00e7in ilk etapta 1 milyon dolarl\u0131k yat\u0131r\u0131mla elektrikli \u015farj istasyonlar\u0131n\u0131n say\u0131s\u0131n\u0131 art\u0131rmay\u0131 hedefliyoruz.<\/strong> B\u00fcy\u00fck \u015fehirlerimizden ba\u015flayarak, T\u00fcrkiye\u2019nin her yerine istasyon kurulmas\u0131n\u0131 sa\u011flayacak <strong>teknik altyap\u0131ya, servis deste\u011fine, \u00fcr\u00fcne<\/strong> ve<strong> iradeye<\/strong> sahibiz\u201d<\/em> diyerek s\u00f6zlerini sonland\u0131rd\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. TOGG projesinin h\u0131z kazanmas\u0131yla T\u00fcrkiye\u2019nin elektrikli ara\u00e7lar i\u00e7in ihtiyac\u0131 olan h\u0131zl\u0131 \u015farj istasyonlar\u0131n\u0131n altyap\u0131s\u0131 konu\u015fulmaya ba\u015fland\u0131. T\u00fcrkiye\u2019nin 81 ilinde, 56 \u015fube ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":150404,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[45735,47730,64981,28624,100712,78975],"views":162,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/150401"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=150401"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/150401\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/150404"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=150401"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=150401"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=150401"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}