{"id":150174,"date":"2022-01-31T11:28:37","date_gmt":"2022-01-31T08:28:37","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=150174"},"modified":"2022-01-31T11:29:00","modified_gmt":"2022-01-31T08:29:00","slug":"eti-aluminyum-arazisindeki-gunes-santrallerine-2-santral-daha-ekliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/eti-aluminyum-arazisindeki-gunes-santrallerine-2-santral-daha-ekliyor\/","title":{"rendered":"(Turkish) Eti Al\u00fcminyum Arazisindeki G\u00fcne\u015f Santrallerine 2 Santral Daha Ekliyor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/150174\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>Eti Al\u00fcminyum, Seydi\u015fehir\u2019deki \u00fcretim tesislerinin arazisinde bulunan g\u00fcne\u015f enerji santrallerine (GES) iki santral daha ekleyecek. Eti-3 GES\u2019in yap\u0131m\u0131na ba\u015flayan Eti Al\u00fcminyum, Eti-4 i\u00e7in de kurulum izni al\u0131rken 2 yeni santralle tesisin yenilenebilir kaynaklardan \u00fcretti\u011fi elektrikle t\u00fcketti\u011fi elektrik, birbirini kar\u015f\u0131layacak. <\/strong><\/h2>\n<p><strong>Eti Al\u00fcminyum<\/strong>; \u2018<strong>temiz<\/strong> ve<strong> ye\u015fil al\u00fcminyum<\/strong>\u2019 hedefiyle, <strong>entegre \u00fcretim tesisleri<\/strong>nin yer ald\u0131\u011f\u0131 <img loading=\"lazy\" class=\"alignright wp-image-150176\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/eti-aluminyum-arazisindeki-gunes-santrallerine-2-santral-daha-ekliyor-2.jpg\" alt=\"\" width=\"320\" height=\"243\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/eti-aluminyum-arazisindeki-gunes-santrallerine-2-santral-daha-ekliyor-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/eti-aluminyum-arazisindeki-gunes-santrallerine-2-santral-daha-ekliyor-2-300x227.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/eti-aluminyum-arazisindeki-gunes-santrallerine-2-santral-daha-ekliyor-2-500x379.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/eti-aluminyum-arazisindeki-gunes-santrallerine-2-santral-daha-ekliyor-2-66x50.jpg 66w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Seydi\u015fehir\u2019de, iki yeni g\u00fcne\u015f enerji santrali kurmaya haz\u0131rlan\u0131yor. Toplam <strong>58,8 MW<\/strong> kurulu g\u00fcc\u00fc bulunan <strong>Eti-1<\/strong> ve <strong>Eti-2<\/strong> g\u00fcne\u015f enerji santrallerine <strong>104,3 MW<\/strong>\u2019lik<strong> Eti-3<\/strong> ve <strong>Eti-4<\/strong>\u2019\u00fc ekleyecek olan Eti Al\u00fcminyum, b\u00f6ylece \u00fcretimde kulland\u0131\u011f\u0131 <strong>elektri\u011fe e\u015fde\u011fer enerjiyi<\/strong>, yenilenebilir enerji kaynaklar\u0131ndan \u00fcretmi\u015f olacak.<\/p>\n<h3><strong>\u2018Hedef Ye\u015fil Al\u00fcminyum\u2019<\/strong><\/h3>\n<p>Seydi\u015fehir\u2019de y\u0131lda <strong>80.000 ton<\/strong> al\u00fcminyum \u00fcrettiklerini belirten <strong>Eti Al\u00fcminyum Genel M\u00fcd\u00fcr\u00fc Mehmet Arkan<\/strong>, <em>\u201cAl\u00fcminyum \u00fcretimindeki en \u00f6nemli s\u00fcre\u00e7 olan <strong>elektrolizhanede<\/strong> kullan\u0131lan elektrik, \u00fcretim maliyetlerinin de \u00e7ok \u00f6nemli bir k\u0131sm\u0131n\u0131 olu\u015fturuyor. <strong>Karbon ayak izimizi d\u00fc\u015f\u00fcrmek<\/strong> i\u00e7in bu <strong>elektri\u011fin ye\u015fil enerjiden<\/strong> sa\u011flanmas\u0131, T\u00fcrkiye\u2019de madenden son \u00fcr\u00fcne kadar entegre \u00fcretim yapan tek \u015firket olan Eti Al\u00fcminyum\u2019un \u00f6nc\u00fc konumunu da peki\u015ftirecek. <strong>G\u00fcne\u015f enerji santralleri<\/strong>mizin yan\u0131 s\u0131ra <strong>Oymap\u0131nar Hidroelektrik Santralimizle<\/strong> birlikte, t\u00fcketti\u011fimiz miktarda elektri\u011fi, <strong>yenilenebilir enerji kaynaklar\u0131ndan<\/strong> \u00fcretme kapasitesine sahip olaca\u011f\u0131z\u201d diye konu\u015ftu. Sanayi \u00fcretiminin \u00f6zellikle geli\u015fmi\u015f \u00fclkelerde <strong>s\u00fcrd\u00fcr\u00fclebilirlik<\/strong> ve e<strong>kolojiyle birlikte<\/strong> y\u00fcr\u00fcd\u00fc\u011f\u00fcn\u00fcn alt\u0131n\u0131 \u00e7izen Arkan, s\u00f6zlerini \u015f\u00f6yle s\u00fcrd\u00fcrd\u00fc: \u201cBir yandan iyi hava kalitesini korumay\u0131 hedeflerken gelece\u011fimize yat\u0131r\u0131m yaparak \u00fcretimde <strong>s\u00fcrd\u00fcr\u00fclebilir<\/strong> ve<strong> temiz enerji kullan\u0131m\u0131n\u0131<\/strong> destekliyoruz. <strong>40,3 MW<\/strong> kurulu g\u00fcc\u00fc bulunan Eti-3 santralimizi may\u0131s ay\u0131nda, hen\u00fcz \u00e7ok yeni kurulum iznini ald\u0131\u011f\u0131m\u0131z <strong>64 MW<\/strong>\u2019lik <strong>Eti-4 santralimizi<\/strong> de y\u0131l\u0131n sonunda tamamlamay\u0131 planl\u0131yoruz. \u00d6n\u00fcm\u00fczdeki d\u00f6nemde mevcut mevzuatlar\u0131n izin verdi\u011fi \u00f6l\u00e7\u00fcde <strong>yenilenebilir kaynaklardan enerji \u00fcretimimizi<\/strong> art\u0131rmak, \u00e7e\u015fitlendirmek ve<strong> s\u0131f\u0131r karbon hedefimize<\/strong> ula\u015fmak istiyoruz.\u201d<\/em><\/p>\n<p><strong>116.000 HANEN\u0130N ELEKTR\u0130\u011e\u0130N\u0130 KAR\u015eILAYAB\u0130LECEK G\u00dc\u00c7TE<\/strong><\/p>\n<p>Eti Al\u00fcminyum <strong>Seydi\u015fehir Entegre Tesisleri<\/strong>&#8216;nde 2022 sonunda say\u0131s\u0131 <strong>4&#8217;e \u00e7\u0131kacak<\/strong> santrallerin sahip oldu\u011fu <strong>163 MW<\/strong>\u2019lik kurulu g\u00fc\u00e7, <strong>116.000 hanenin<\/strong> enerji t\u00fcketimine denk \u00fcretim ger\u00e7ekle\u015ftirecek. Halihaz\u0131rda <strong>145.350 adet<\/strong> olan g\u00fcne\u015f paneli de <strong>2 santralin<\/strong> tamamlanmas\u0131yla birlikte<strong> 378.000\u2019e<\/strong> \u00e7\u0131kacak. <strong>2 santralin<\/strong> yap\u0131m\u0131 da di\u011ferleri gibi grup \u015firketi <strong>Cengiz Enerji<\/strong> taraf\u0131ndan ger\u00e7ekle\u015ftirecek. <strong>S\u00fcrd\u00fcr\u00fclebilir \u00fcretimi<\/strong> faaliyetlerinin temeline koyan Eti Al\u00fcminyum <strong>Seydi\u015fehir i\u015fletmelerinde<\/strong>, d\u00fc\u015f\u00fck gaz sal\u0131m\u0131 i\u00e7in \u00f6zelle\u015ftirme sonras\u0131 yap\u0131lan \u00e7ok ciddi yat\u0131r\u0131mlar sayesinde <strong>AB\u2019nin<\/strong> belirledi\u011fi orandan<strong> %50<\/strong> daha <strong>d\u00fc\u015f\u00fck gaz sal\u0131m\u0131<\/strong> seviyesine ula\u015f\u0131ld\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Eti Al\u00fcminyum, Seydi\u015fehir\u2019deki \u00fcretim tesislerinin arazisinde bulunan g\u00fcne\u015f enerji santrallerine (GES) iki santral daha ekleyecek. Eti-3 GES\u2019in yap\u0131m\u0131na ba\u015flayan Eti Al\u00fcminyum, Eti-4 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":150177,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[100592,2206,26729,100593,31482,100594,100595],"views":332,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/150174"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=150174"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/150174\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/150177"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=150174"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=150174"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=150174"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}