{"id":15007,"date":"2013-09-06T09:32:59","date_gmt":"2013-09-06T06:32:59","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=15007"},"modified":"2013-09-06T09:32:59","modified_gmt":"2013-09-06T06:32:59","slug":"rizeye-yeni-bir-hes-projesi-daha-geliyor-cigdemli","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/rizeye-yeni-bir-hes-projesi-daha-geliyor-cigdemli\/","title":{"rendered":"(Turkish) Rize\u2019ye Yeni Bir HES Projesi Daha Geliyor: \u00c7i\u011fdemli&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/15007\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ka\u00e7kar Enerji, Do\u011fu Karadeniz Havzas\u0131nda Rize \u00c7ayeli\u2019nde \u00c7atal Dere\u2019de \u00c7i\u011fdemli Hidroelektrik Santrali (HES) Projesi\u2019ni kurmay\u0131 hedefliyo<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/karakaya-hes-rehabilite-edilecek.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-12485\" title=\"rizeye-yeni-bir-hes-projesi-daha-geliyor:-cigdemli\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/karakaya-hes-rehabilite-edilecek-300x219.jpg\" alt=\"\" width=\"300\" height=\"219\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/karakaya-hes-rehabilite-edilecek-300x219.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/karakaya-hes-rehabilite-edilecek-500x365.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/karakaya-hes-rehabilite-edilecek-68x50.jpg 68w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/06\/karakaya-hes-rehabilite-edilecek.jpg 900w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>r.<\/strong><\/p>\n<p>Proje i\u00e7in 12,6 milyon TL yat\u0131r\u0131m yap\u0131lmas\u0131 hedefleniyor. \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) s\u00fcreci ba\u015flayan proje i\u00e7in gerekli izinlerin al\u0131nmas\u0131 ile Enerji Piyasas\u0131 D\u00fczenleme Kurumu\u2019ndan lisans al\u0131nmas\u0131 hedefleniyor.<\/p>\n<p><strong>HES\u2019\u0130N KURULU G\u00dcC\u00dc 6,9 MW<\/strong><\/p>\n<p>HES\u2019in kurulu g\u00fcc\u00fc, 6,94 MWm\/6,29 MWe olarak belirlendi. HES\u2019te, Atabey Enerji\u2019nin 20,3 MW\u2019l\u0131k Uzundere II HES Projesi kapsam\u0131nda yer alan \u00c7ataldere II HES\u2019in kuyruk suyu kullan\u0131lacak.<\/p>\n<p>HES\u2019de y\u0131lda toplam 36,221 GWh elektrik \u00fcretilmesi hedefleniyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/rizeye-yeni-bir-hes-projesi-daha-geliyor:-cigdemli_4808.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ka\u00e7kar Enerji, Do\u011fu Karadeniz Havzas\u0131nda Rize \u00c7ayeli\u2019nde \u00c7atal Dere\u2019de \u00c7i\u011fdemli Hidroelektrik Santrali (HES) Projesi\u2019ni kurmay\u0131 hedefliyor. Proje i\u00e7in 12,6 milyon TL yat\u0131r\u0131m yap\u0131lmas\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":12485,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[2878,8328,19,63,67,1009,165,35370,1090,8327,8329],"views":1958,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/15007"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=15007"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/15007\/revisions"}],"predecessor-version":[{"id":15008,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/15007\/revisions\/15008"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/12485"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=15007"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=15007"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=15007"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}