{"id":149496,"date":"2022-01-17T12:05:48","date_gmt":"2022-01-17T09:05:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=149496"},"modified":"2022-01-17T12:10:59","modified_gmt":"2022-01-17T09:10:59","slug":"hindistan-dan-yesil-enerji-projelerine-161-milyar-dolarlik-yatirim","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/hindistan-dan-yesil-enerji-projelerine-161-milyar-dolarlik-yatirim\/","title":{"rendered":"India to Invest $1.61 bln to Link More Green Energy Projects to Grid"},"content":{"rendered":"<p><\/p>\n<h2 class=\"Text__text___3eVx1j Text__dark-grey___AS2I_p Text__regular___Bh17t- Text__large___1i0u1F Body__base___25kqPt Body__large_body___3g04wK ArticleBody__element___3UrnEs\" data-testid=\"paragraph-0\">India&#8217;s cabinet approved a plan on Thursday to build transmission lines costing $1.61 billion over 5 years to link 20 gigawatts (GW) of renewable energy projects from seven states with the grid, as the nation moves to cut its carbon <img loading=\"lazy\" class=\"alignright wp-image-149499\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/hindistan-dan-yesil-enerji-projelerine-161-milyar-dolarlik-yatirim-1.jpg\" alt=\"\" width=\"320\" height=\"250\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/hindistan-dan-yesil-enerji-projelerine-161-milyar-dolarlik-yatirim-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/hindistan-dan-yesil-enerji-projelerine-161-milyar-dolarlik-yatirim-1-300x235.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/hindistan-dan-yesil-enerji-projelerine-161-milyar-dolarlik-yatirim-1-500x391.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/hindistan-dan-yesil-enerji-projelerine-161-milyar-dolarlik-yatirim-1-64x50.jpg 64w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>emissions.<\/h2>\n<p class=\"Text__text___3eVx1j Text__dark-grey___AS2I_p Text__regular___Bh17t- Text__large___1i0u1F Body__base___25kqPt Body__large_body___3g04wK ArticleBody__element___3UrnEs\" data-testid=\"paragraph-1\">India, the world&#8217;s third biggest emitter of <strong>greenhouse gases, aims to cut its projected<\/strong> emissions by a billion tonnes by <strong>2030<\/strong> and raise <strong>renewable power generation<\/strong> to <strong>430 GW<\/strong>, equivalent to about half of the country&#8217;s energy mix.<\/p>\n<p class=\"Text__text___3eVx1j Text__dark-grey___AS2I_p Text__regular___Bh17t- Text__large___1i0u1F Body__base___25kqPt Body__large_body___3g04wK ArticleBody__element___3UrnEs\" data-testid=\"paragraph-2\">Prime minister Narendra Modi last year announced <strong>2070<\/strong> as the target for India to reach <strong>net zero carbon emissions.<\/strong><\/p>\n<p class=\"Text__text___3eVx1j Text__dark-grey___AS2I_p Text__regular___Bh17t- Text__large___1i0u1F Body__base___25kqPt Body__large_body___3g04wK ArticleBody__element___3UrnEs\" data-testid=\"paragraph-3\">The federal government will provide assistance equal to about a third of the overall <strong>120 billion rupee<\/strong> investment required for the expansion of transmission lines in the second phase of the so called green corridor project, a government statement said.<\/p>\n<p class=\"Text__text___3eVx1j Text__dark-grey___AS2I_p Text__regular___Bh17t- Text__large___1i0u1F Body__base___25kqPt Body__large_body___3g04wK ArticleBody__element___3UrnEs\" data-testid=\"paragraph-4\">The scheme will add about <strong>10,750 circuit kilometres<\/strong> of transmission lines, for projects in western state of Gujarat, the desert state of Rajasthan, the northern state of Himachal Pradesh, and the southern states of Tamil Nadu, Karnataka, Kerala and Andhra Pradesh, it said.<\/p>\n<p data-testid=\"paragraph-4\">Source: <a href=\"https:\/\/www.reuters.com\/markets\/commodities\/india-invest-161-bln-link-more-green-energy-projects-grid-2022-01-06\/\" target=\"_blank\" rel=\"noopener\">Reuters<\/a><\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>India&#8217;s cabinet approved a plan on Thursday to build transmission lines costing $1.61 billion over 5 years to link 20 gigawatts (GW) of renewable energy projects from seven states with the grid, as the nation moves to cut its carbon emissions. India, the world&#8217;s third biggest emitter of greenhouse gases, aims to cut its projected [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":149499,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,50],"tags":[100208,4034,8189,100205,44847,26272,73259,88614,93102,100206,100207,10290,100204],"views":572,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/149496"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=149496"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/149496\/revisions"}],"predecessor-version":[{"id":149502,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/149496\/revisions\/149502"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/149499"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=149496"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=149496"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=149496"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}