{"id":149419,"date":"2022-01-14T14:52:26","date_gmt":"2022-01-14T11:52:26","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=149419"},"modified":"2022-01-14T14:53:53","modified_gmt":"2022-01-14T11:53:53","slug":"cengiz-enerji-ozbekistan-daki-2-inci-dogalgaz-cevrim-santralini-kuruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cengiz-enerji-ozbekistan-daki-2-inci-dogalgaz-cevrim-santralini-kuruyor\/","title":{"rendered":"(Turkish) &#8217;Cengiz Enerji&#8217; \u00d6zbekistan\u2019da 2. Do\u011falgaz Santralini Kuruyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/149419\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>Cengiz Holding\u2019in i\u015ftiraki Cengiz Enerji; \u00d6zbekistan\u2019\u0131n enerji \u00fcretim kapasitesine \u00f6nemli katk\u0131da bulunacak yakla\u015f\u0131k 800.000 n\u00fcfusu bulunan Sirdaryo kentindeki do\u011falgaz kombine \u00e7evrim santralinin kurulumuna ba\u015flad\u0131. 220 megavat kurulu g\u00fcce sahip santralin bu y\u0131l sonunda tamamlanarak \u00fcretime ba\u015flamas\u0131 hedefleniyor.<\/h2>\n<p><strong>Cengiz Enerji Y\u00f6netim Kurulu \u00dcyesi Ahmet Cengiz, <\/strong>\u00d6zbekistan\u2019\u0131n enerji altyap\u0131s\u0131n\u0131n yenilenmesi s\u00fcrecine ve enerji \u00fcretimine destek verdiklerini belirterek, <em>\u201c\u00d6zbekistan\u2019\u0131n ba\u015fkenti <img loading=\"lazy\" class=\"alignright wp-image-149421\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/cengiz-enerji-ozbekistan-daki-2-inci-dogalgaz-cevrim-santralini-kuruyor-2.jpg\" alt=\"\" width=\"320\" height=\"221\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/cengiz-enerji-ozbekistan-daki-2-inci-dogalgaz-cevrim-santralini-kuruyor-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/cengiz-enerji-ozbekistan-daki-2-inci-dogalgaz-cevrim-santralini-kuruyor-2-300x207.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/cengiz-enerji-ozbekistan-daki-2-inci-dogalgaz-cevrim-santralini-kuruyor-2-500x345.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/cengiz-enerji-ozbekistan-daki-2-inci-dogalgaz-cevrim-santralini-kuruyor-2-72x50.jpg 72w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Ta\u015fkent\u2019te ge\u00e7en y\u0131l ba\u015flad\u0131\u011f\u0131m\u0131z ve yine<strong> do\u011fal gaz \u00e7evrim santrali<\/strong> olan yat\u0131r\u0131m\u0131m\u0131z,<strong> birka\u00e7 ay sonra<\/strong> faaliyete ge\u00e7ecek. \u015eu anda \u00f6n devreye alma \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcrd\u00fc\u011f\u00fcm\u00fcz<strong> 240 megavat<\/strong> kurulu g\u00fcce sahip projeden sonra bu sefer <strong>Sirdaryo<\/strong>\u2019da ba\u015flad\u0131\u011f\u0131m\u0131z bu yat\u0131r\u0131m bizi \u00e7ok heyecanland\u0131r\u0131yor. <strong>2,5 milyondan fazla<\/strong> n\u00fcfusa sahip olan <strong>Ta\u015fkent\u2019le<\/strong> kar\u015f\u0131la\u015ft\u0131r\u0131ld\u0131\u011f\u0131nda g\u00f6rece k\u00fc\u00e7\u00fck bir \u015fehir olan Sirdaryo\u2019nun yerel ekonomisine ve geli\u015fimine de katk\u0131da bulunacak<strong> 220 megavat<\/strong> kurulu g\u00fcce sahip santralimizi bu y\u0131l\u0131n sonunda devreye almay\u0131 planl\u0131yoruz. B\u00f6ylece \u00d6zbekistan\u2019daki kurulu g\u00fcc\u00fcm\u00fcz de <strong>460 megavata<\/strong> \u00e7\u0131km\u0131\u015f olacak. Bu b\u00fcy\u00fckl\u00fck, yakla\u015f\u0131k <strong>230 bin hanenin<\/strong> enerji t\u00fcketimine kar\u015f\u0131l\u0131k geliyor\u201d<\/em> diye konu\u015ftu.<\/p>\n<h3><strong>PROJE A\u015eAMASINDA 500 K\u0130\u015e\u0130L\u0130K \u0130ST\u0130HDAM <\/strong><\/h3>\n<p>Sirdaryo kentinin ve ulusal \u015febekenin <strong>enerji arz\u0131na<\/strong> katk\u0131da bulunmay\u0131 ama\u00e7layan <strong>do\u011fal gaz \u00e7evrim santrali<\/strong>,<strong> 70.000 metrekarelik<\/strong> alan \u00fczerine kurulacak. Santralin <strong>in\u015faat<\/strong> ve<strong> kurulumunda<\/strong> aralar\u0131nda <strong>T\u00fcrk m\u00fchendislerin de<\/strong> bulundu\u011fu toplam<strong> 500 ki\u015fi<\/strong> \u00e7al\u0131\u015f\u0131yor. <strong>Yerel kaynaklardan<\/strong> ve <strong>tedarik \u015firketlerinden<\/strong> maksimum d\u00fczeyde faydalan\u0131lacak kurulum s\u00fcrecinde, <strong>s\u0131cak testlerin<\/strong> <strong>temmuz ay\u0131nda ba\u015flamas\u0131<\/strong> ve kurulum \u00e7al\u0131\u015fmalar\u0131n\u0131n <strong>y\u0131l\u0131n 2&#8217;inci yar\u0131s\u0131nda<\/strong> tamamlanmas\u0131 planlan\u0131yor.<\/p>\n<p><strong>Sirdaryo Do\u011fal Gaz \u00c7evrim Santrali<\/strong> ile ilgili <strong>Elektrik Al\u0131m Anla\u015fmas\u0131<\/strong>, \u00d6zbekistan <strong>Ulusal Elektrik \u015eebekeleri<\/strong> ve <strong>Cengiz Enerji<\/strong> aras\u0131nda 28 Haziran 2021\u2019de imzalanm\u0131\u015f, ilgili Ba\u015fkanl\u0131k Karar\u0131 ise 10 Kas\u0131m 2021\u2019de yay\u0131mlanm\u0131\u015ft\u0131. Cengiz Enerji tesiste <strong>yap-i\u015flet modeli<\/strong>yle <strong>25 y\u0131l boyunca<\/strong> enerji \u00fcretecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Cengiz Holding\u2019in i\u015ftiraki Cengiz Enerji; \u00d6zbekistan\u2019\u0131n enerji \u00fcretim kapasitesine \u00f6nemli katk\u0131da bulunacak yakla\u015f\u0131k 800.000 n\u00fcfusu bulunan Sirdaryo kentindeki do\u011falgaz kombine \u00e7evrim santralinin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":149421,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[2890,2889,43848,3761,100167,10997,100166,100168,92692,100169],"views":257,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/149419"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=149419"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/149419\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/149421"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=149419"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=149419"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=149419"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}