{"id":148660,"date":"2022-01-02T16:51:44","date_gmt":"2022-01-02T13:51:44","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=148660"},"modified":"2022-01-02T16:56:27","modified_gmt":"2022-01-02T13:56:27","slug":"asunim-misirdaki-gunes-santrali-projelerini-hayata-gecirdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/asunim-misirdaki-gunes-santrali-projelerini-hayata-gecirdi\/","title":{"rendered":"(Turkish) ASUNIM M\u0131s\u0131r\u2019daki G\u00fcne\u015f Santrali Projelerini Hayata Ge\u00e7irdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/148660\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>ASUNIM Egypt 231kWp kurulu g\u00fcce sahip arazi \u00fcst\u00fc g\u00fcne\u015f sistemini; \u0130skenderiye Kahire \u00e7\u00f6l yolunda yer alan turistik dinlenme tesisi kurulu\u015fu Omar Oassis i\u00e7in tamamlad\u0131.<\/h2>\n<p><em>\u00c7e\u015fitli restoranlar\u0131n, ara\u00e7 \u015farj istasyonlar\u0131n\u0131n, araba servis merkezleri ve ma\u011fazan\u0131n yer ald\u0131\u011f\u0131 tesisi besleyecek<\/em> olan ve \u015febekeye ba\u011fl\u0131 sistem olarak \u00e7al\u0131\u015fan bu enerji santrali, kesinti durumunda <strong>dizel seti<\/strong> ile e\u015fle\u015fecek ve<strong> hibrit bir PV sistemi<\/strong> olarak \u00e7al\u0131\u015facak \u015fekilde haz\u0131rlan\u0131rken sistem y\u0131lda <img loading=\"lazy\" class=\"alignright wp-image-148662\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/asunim-misirdaki-gunes-santrali-projelerini-hayata-gecirdi.jpg\" alt=\"\" width=\"320\" height=\"220\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/asunim-misirdaki-gunes-santrali-projelerini-hayata-gecirdi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/asunim-misirdaki-gunes-santrali-projelerini-hayata-gecirdi-300x206.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/asunim-misirdaki-gunes-santrali-projelerini-hayata-gecirdi-500x344.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2022\/01\/asunim-misirdaki-gunes-santrali-projelerini-hayata-gecirdi-73x50.jpg 73w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><strong>736.500 KWh<\/strong> elektrik \u00fcretecek ve <strong>522 ton CO2 emisyonu<\/strong>nu \u00f6nleyecek.<\/p>\n<p>ASUNIM Egypt ayr\u0131ca, <strong>kompozit r\u00f6gar kapaklar\u0131<\/strong> ve <strong>ya\u011fmur \u0131zgaralar\u0131<\/strong>n\u0131n lider \u00fcreticisi olan <strong>BMC Almasrya sanayi<\/strong> \u00e7at\u0131s\u0131nda <strong>231kWp<\/strong>\u2019lik bir <strong>g\u00fcne\u015f enerji sistemi<\/strong>ni de tamamlad\u0131.<\/p>\n<p><strong>\u0130skenderiye<\/strong>\u2019deki bir sanayi \u015fehri olan <strong>Borg Al Arab<\/strong>\u2019da yer alan bu sistemin y\u0131lda <strong>397.400 KWh<\/strong> \u00fcretmesi ve <strong>282 ton CO2 emisyonunu <\/strong>da \u00f6nleyecek.<\/p>\n<p>ASUNIM Egypt, <strong>M\u0131s\u0131r<\/strong>\u2019da tamamlad\u0131\u011f\u0131 projelerle birlikte yine ayn\u0131 b\u00f6lgede yer alan<strong> fabrika \u00e7at\u0131s\u0131na <\/strong>da <strong>1544kWp<\/strong>\u2019lik bir<strong> \u00e7at\u0131 \u00fcst\u00fc g\u00fcne\u015f enerjisi santrali<\/strong> geli\u015ftirerek <strong>projelendirme<\/strong> ve <strong>m\u00fchendislik<\/strong> hizmetleri,<strong> g\u00f6lge analizi, \u00fcretim sim\u00fclasyonlar\u0131, optimizasyonlar, kurum i\u00e7i \u00f6zel yaz\u0131l\u0131m kullan\u0131m\u0131<\/strong> dahil en g\u00fcncel teknik \u00e7\u00f6z\u00fcmleri hayata ge\u00e7irmi\u015ftir.<\/p>\n<p>B\u00f6ylece <strong>ASUNIM,<\/strong> uluslararas\u0131 alanda tamamland\u0131\u011f\u0131 projeleriyle<strong> 1GW kurulu g\u00fcc\u00fc <\/strong>a\u015fm\u0131\u015ft\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. ASUNIM Egypt 231kWp kurulu g\u00fcce sahip arazi \u00fcst\u00fc g\u00fcne\u015f sistemini; \u0130skenderiye Kahire \u00e7\u00f6l yolunda yer alan turistik dinlenme tesisi kurulu\u015fu Omar Oassis [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":148662,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[99862,99866,99867,45404,2326,939,2569,99865,99863,3352,99864],"views":200,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/148660"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=148660"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/148660\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/148662"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=148660"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=148660"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=148660"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}