{"id":14806,"date":"2013-09-03T09:21:34","date_gmt":"2013-09-03T06:21:34","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=14806"},"modified":"2013-09-03T09:21:34","modified_gmt":"2013-09-03T06:21:34","slug":"zorlu-denizli-karatasta-jeotermal-santral-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zorlu-denizli-karatasta-jeotermal-santral-kuracak\/","title":{"rendered":"(Turkish) Zorlu, Denizli Karata\u015f`ta Jeotermal Santral Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/14806\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Denizli Sarayk\u00f6y`deki K\u0131z\u0131ldere II jeotermal santralinde ticari elektrik sat\u0131\u015f\u0131na ba\u015flayan Zorlu Enerji, Denizli Karata\u015f`ta 100 MW`lik yeni bir santral kurmak i\u00e7in ba\u015fvuru yapt\u0131.<\/strong><\/p>\n<p>Zorlu Enerji\u2019nin y\u00fczde 100 hissedar\u0131 oldu\u011fu Zorlu Do\u011fal Elektrik \u00dcretim A\u015e`nin 2008 y\u0131l\u0131nda AD\u00dcA\u015e ihalesi ile 30 y\u0131ll\u0131k i\u015fletme hakk\u0131n\u0131 devrald\u0131\u011f\u0131 K\u0131z\u0131ldere Jeotermal Sahas\u0131`nda kurdu\u011fu toplam \u00fcretim kapasitesi 80 MW olan Denizli Sarayk\u00f6y K\u0131z\u0131ldere II Jeotermal Santrali projesinin 60 MW\u2019l\u0131k ilk faz\u0131nda performans ve g\u00fcvenilirlik testleri ba\u015far\u0131yla tamamland\u0131.<\/p>\n<p><strong>KIZILDERE II`N\u0130N \u0130K\u0130NC\u0130 FAZI SON \u00c7EYREKTE<\/strong><br \/>\nEnerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan resmi kabul\u00fcn\u00fcn yap\u0131lmas\u0131n\u0131n ard\u0131ndan, K\u0131z\u0131ldere II Jeotermal Santrali`nden ticari elektrik sat\u0131\u015f\u0131na ba\u015fland\u0131. Daha \u00f6nce ayn\u0131 yerdeki K\u0131z\u0131ldere I Sahas\u0131`nda \u00fcretim ve sat\u0131\u015fa ba\u015flayan Zorlu Do\u011fal Enerji, K\u0131z\u0131ldere II santralinin 20 MW\u2019l\u0131k ikinci faz\u0131n\u0131 da bu y\u0131l\u0131n son \u00e7eyre\u011finde devreye alacak.<\/p>\n<p><strong>D\u00dcNYANIN EN B\u00dcY\u00dcK JEOTERMAL SANTRALLER\u0130 ARASINDA<\/strong><br \/>\n\u015eu anda 60 MW\u2019l\u0131k ilk faz\u0131nda \u00fcretim<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/zorlu-denizli-karatasta-jeotermal-santral-kuracak.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-14807\" title=\"zorlu-denizli-karatasta-jeotermal-santral-kuracak\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/zorlu-denizli-karatasta-jeotermal-santral-kuracak-300x212.jpg\" alt=\"\" width=\"300\" height=\"212\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/zorlu-denizli-karatasta-jeotermal-santral-kuracak-300x212.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/zorlu-denizli-karatasta-jeotermal-santral-kuracak-500x354.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/zorlu-denizli-karatasta-jeotermal-santral-kuracak-70x50.jpg 70w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/zorlu-denizli-karatasta-jeotermal-santral-kuracak.jpg 800w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> ve ticari sat\u0131\u015f ger\u00e7ekle\u015ftirilen K\u0131z\u0131ldere II jeotermal projesi tamamland\u0131\u011f\u0131nda 95 MW g\u00fcc\u00fcne sahip d\u00fcnyan\u0131n en b\u00fcy\u00fck on jeotermal santrali aras\u0131nda yer alacak. K\u0131z\u0131ldere projesi kapsam\u0131nda \u00fcretilecek y\u0131ll\u0131k 600 milyon kWh elektrik ile 2 bin 500 konut ve 500 d\u00f6n\u00fcm sera \u0131s\u0131nacak. Genel M\u00fcd\u00fcr\u00fc Sinan Ak, &#8220;K\u0131z\u0131ldere II Jeotermal Santrali\u2019nde sona yakla\u015fmak \u00fczereyiz. Tam kapasite ile \u00fcretime ge\u00e7ti\u011finde, y\u0131ll\u0131k 600 milyon kWh elektrik \u00fcretecek olan santralimizin, d\u00fcnyan\u0131n say\u0131l\u0131 jeotermal santralleri aras\u0131ndaki yerini alacak olmas\u0131ndan ayr\u0131ca mutluluk duyuyoruz&#8221; dedi.<\/p>\n<p><strong>100 MW`L\u0130K KARATA\u015e JES \u0130\u00c7\u0130N BA\u015eVURU YAPTI<\/strong><br \/>\nT\u00fcrkiye`deki jeotermal yat\u0131r\u0131m \u00e7al\u0131\u015fmalar\u0131na t\u00fcm h\u0131z\u0131yla devam edeceklerini vurgulayan Sinan Ak, di\u011fer jeotermal yat\u0131r\u0131mlar\u0131 hakk\u0131nda da bilgi verdi. Zorlu Enerji olarak, Denizli\u2019nin Sarayk\u00f6y il\u00e7esindeki Karata\u015f mevkiinde y\u00fcr\u00fct\u00fcle jeotermal kaynak ara\u015ft\u0131rmalar\u0131n\u0131n olumlu sonu\u00e7lar verdi\u011fini anlatan Sinan Ak, 100 MW kurulu g\u00fcc\u00fcnde, 25 y\u0131l boyunca elektrik \u00fcretecek yeni bir jeotermal santrali kurmak \u00fczere Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019na ba\u015fvuruda bulunduklar\u0131n\u0131 belirtti.<\/p>\n<p><strong>ALA\u015eEH\u0130R`E 45 MW`L\u0130K JES KURULACAK<\/strong><br \/>\n2040 y\u0131l\u0131na kadar \u00fcretim lisans\u0131na sahip olduklar\u0131 Manisa-Ala\u015fehir jeotermal sahas\u0131nda da sondaj \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcrd\u00fcklerini kaydeden Sinan Ak \u015f\u00f6yle dedi:<br \/>\n&#8220;45 MW kurulu g\u00fcce sahip olacak tesisin in\u015faat\u0131na, proje finansman\u0131 tamamland\u0131ktan sonra bu y\u0131l i\u00e7erisinde ba\u015flamay\u0131 hedefliyoruz. Simav\u2019da da jeotermal \u00e7al\u0131\u015fmalar\u0131m\u0131z bulunuyor. Yine Bitlis ve \u00e7evresinde jeotermal enerji \u00fcretimi i\u00e7in ara\u015ft\u0131rmalar\u0131m\u0131z devam ediyor. Yapaca\u011f\u0131m\u0131z t\u00fcm jeotermal enerji yat\u0131r\u0131mlar\u0131m\u0131zla, \u00fclkemizin 2023 jeotermal hedefinin yar\u0131s\u0131n\u0131 2015 y\u0131l\u0131na kadar tek ba\u015f\u0131m\u0131za \u00fcretece\u011fiz.&#8221;<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/zorlu-denizli-karatasta-jeotermal-santral-kuracak_4757.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Denizli Sarayk\u00f6y`deki K\u0131z\u0131ldere II jeotermal santralinde ticari elektrik sat\u0131\u015f\u0131na ba\u015flayan Zorlu Enerji, Denizli Karata\u015f`ta 100 MW`lik yeni bir santral kurmak i\u00e7in ba\u015fvuru yapt\u0131. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14807,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[845,19,63,67,1009,165,58,56,8212,6748,8214,8213,6322,8211,2582,344],"views":1790,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14806"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=14806"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14806\/revisions"}],"predecessor-version":[{"id":14809,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14806\/revisions\/14809"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/14807"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=14806"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=14806"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=14806"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}