{"id":148024,"date":"2021-12-21T11:07:35","date_gmt":"2021-12-21T08:07:35","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=148024"},"modified":"2021-12-21T11:07:35","modified_gmt":"2021-12-21T08:07:35","slug":"dunya-bankasi-ndan-300-milyon-dolarlik-ibrd-jeotermal-kredisine-onay","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/dunya-bankasi-ndan-300-milyon-dolarlik-ibrd-jeotermal-kredisine-onay\/","title":{"rendered":"(Turkish) D\u00fcnya Bankas\u0131&#8217;ndan 300 Milyon Dolarl\u0131k IBRD Jeotermal Kredisi&#8217;ne Onay"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/148024\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2>D\u00fcnya Bankas\u0131 \u0130cra Direkt\u00f6rleri Kurulu taraf\u0131ndan T\u00fcrkiye\u2019de jeotermal kaynaklar\u0131 ile temiz enerjinin geli\u015ftirilmesine y\u00f6nelik uygulamadaki Jeotermal Geli\u015ftirme Projesine y\u00f6nelik toplam da 300 milyon dolarl\u0131k <img loading=\"lazy\" class=\"alignright wp-image-148026\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/12\/dunya-bankasi-ndan-jeotermal-gelistirme-kredisi.jpg\" alt=\"\" width=\"320\" height=\"211\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/12\/dunya-bankasi-ndan-jeotermal-gelistirme-kredisi.jpg 545w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/12\/dunya-bankasi-ndan-jeotermal-gelistirme-kredisi-300x198.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/12\/dunya-bankasi-ndan-jeotermal-gelistirme-kredisi-500x330.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/12\/dunya-bankasi-ndan-jeotermal-gelistirme-kredisi-76x50.jpg 76w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>tutara sahip IBRD kredisi onayland\u0131.<\/h2>\n<p>Bu \u00e7er\u00e7evede daha \u00f6ncesinde toplam da <strong>250 milyon dolarl\u0131k<\/strong> bir <strong>kredi paketi<\/strong> serbest b\u0131rak\u0131l\u0131rken proje ekibinin liderleri <strong>Almudena Mateos Merino, Ayse Yasemin \u00d6r\u00fcc\u00fc<\/strong> ve <strong>Manuel Berlengiero<\/strong> da bir ortak a\u00e7\u0131klama yay\u0131nlad\u0131lar.<\/p>\n<p>Yap\u0131lan a\u00e7\u0131klamada <span style=\"text-decoration: underline;\">\u015fu ifadelere yer verildi;<\/span><em> \u201c2 kredinin eklenmesiyle birlikte, Jeotermal Geli\u015ftirme Projesi&#8217;nin toplam da <strong>380 MW<\/strong>\u2019\u0131n \u00fczerinde <strong>yeni jeotermal enerji kapasitesi<\/strong>ni finanse etmesi, yakla\u015f\u0131k <strong>555 milyon dolar<\/strong> tutar\u0131nda <strong>\u00f6zel sermayeyi harekete ge\u00e7irmesi<\/strong> ve<strong> jeotermal projelerinin<\/strong> toplam \u00f6mr\u00fc boyunca yakla\u015f\u0131k<strong> 30 milyon ton<\/strong> CO2 emisyonunun \u00f6nlenmesi yoluyla <strong>T\u00fcrkiye\u2019nin iklim taahh\u00fctlerinin<\/strong> yerine getirmesine katk\u0131da bulunmas\u0131 beklenmektedir. \u0130laveten, sa\u011flanan <strong>yeni finansman<\/strong>, <strong>jeotermal kaynaklar\u0131n\u0131n<\/strong> do\u011frudan kullan\u0131mlar\u0131n\u0131n geli\u015ftirilmesini de destekleyecek. B\u00f6ylelikle <strong>jeotermal kaynaklara<\/strong> yak\u0131n topluluklarda <strong>yerel kalk\u0131nmaya da<\/strong> katk\u0131da bulunacakt\u0131r\u201d.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. D\u00fcnya Bankas\u0131 \u0130cra Direkt\u00f6rleri Kurulu taraf\u0131ndan T\u00fcrkiye\u2019de jeotermal kaynaklar\u0131 ile temiz enerjinin geli\u015ftirilmesine y\u00f6nelik uygulamadaki Jeotermal Geli\u015ftirme Projesine y\u00f6nelik toplam da 300 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":148026,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[6966,23311,14883,99513,99514,58,56,32040,36184],"views":783,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/148024"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=148024"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/148024\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/148026"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=148024"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=148024"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=148024"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}