{"id":14795,"date":"2013-09-02T18:07:30","date_gmt":"2013-09-02T15:07:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=14795"},"modified":"2013-09-02T18:07:30","modified_gmt":"2013-09-02T15:07:30","slug":"zorlu-enerji-jeotermal-elektrik-satisina-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zorlu-enerji-jeotermal-elektrik-satisina-basladi\/","title":{"rendered":"(Turkish) Zorlu Enerji Jeotermal Elektrik Sat\u0131\u015f\u0131na Ba\u015flad\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/14795\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Zorlu Enerji\u2019nin toplam \u00fcretim kapasitesi 80 MW olan Denizli Sarayk\u00f6y\u2019deki K\u0131z\u0131ldere II Jeotermal Santrali projesinin 60 MW\u2019l\u0131k ilk faz\u0131nda performans ve g\u00fcvenilirlik testleri ba\u015far\u0131 ile tamamland\u0131. S<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/zorlu-enerji-jeotermal-elektrik-satisina-basladi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-14796\" title=\"zorlu-enerji-jeotermal-elektrik-satisina-basladi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/zorlu-enerji-jeotermal-elektrik-satisina-basladi-300x192.jpg\" alt=\"\" width=\"300\" height=\"192\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/zorlu-enerji-jeotermal-elektrik-satisina-basladi-300x192.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/zorlu-enerji-jeotermal-elektrik-satisina-basladi-78x50.jpg 78w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/09\/zorlu-enerji-jeotermal-elektrik-satisina-basladi.jpg 468w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>antralin, Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan resmi kabul\u00fcn\u00fcn yap\u0131lmas\u0131n\u0131n ard\u0131ndan, ticari elektrik sat\u0131\u015f\u0131na ba\u015fland\u0131. <\/strong><\/p>\n<p>Zorlu Enerji\u2019nin y\u00fczde 100 hissedar\u0131 oldu\u011fu Zorlu Do\u011fal Elektrik \u00dcretim A.\u015e\u2019nin 2008 y\u0131l\u0131nda AD\u00dcA\u015e ihalesi ile 30 y\u0131ll\u0131k i\u015fletme hakk\u0131n\u0131 devrald\u0131\u011f\u0131 K\u0131z\u0131ldere Jeotermal Sahas\u0131\u2019nda 15 MW\u2019l\u0131k K\u0131z\u0131ldere I Jeotermal Santrali\u2019nin ard\u0131ndan, \u015fimdi de K\u0131z\u0131ldere II Jeotermal Santrali\u2019nin ilk faz\u0131nda elektrik \u00fcretimi ve sat\u0131\u015f\u0131na ba\u015fland\u0131. Santralin 20 MW\u2019l\u0131k ikinci faz\u0131 ise, 2013 y\u0131l\u0131n\u0131n son \u00e7eyre\u011finde devreye al\u0131nacak.<\/p>\n<p>\u015eu anda 60 MW\u2019l\u0131k ilk faz\u0131nda \u00fcretim ve ticari sat\u0131\u015f ger\u00e7ekle\u015ftirilen K\u0131z\u0131ldere II jeotermal projesi tamamland\u0131\u011f\u0131nda 95 MW g\u00fcc\u00fcne sahip d\u00fcnyan\u0131n en b\u00fcy\u00fck on jeotermal santrali aras\u0131nda yer alacak. K\u0131z\u0131ldere projesi kapsam\u0131nda \u00fcretilecek y\u0131ll\u0131k 600 milyon kWh elektrik ile 2 bin 500 konut ve 500 d\u00f6n\u00fcm sera \u0131s\u0131nacak.<\/p>\n<p>Yay\u0131nc\u0131: <a href=\"https:\/\/www.enerjigazetesi.ist\" target=\"_blank\">Enerji Gazetesi<\/a><\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Zorlu Enerji\u2019nin toplam \u00fcretim kapasitesi 80 MW olan Denizli Sarayk\u00f6y\u2019deki K\u0131z\u0131ldere II Jeotermal Santrali projesinin 60 MW\u2019l\u0131k ilk faz\u0131nda performans ve g\u00fcvenilirlik testleri [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":14796,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,48],"tags":[63,67,1009,165,58,56,8199,8198,8202,8204,8203,8200,8201,344],"views":823,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14795"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=14795"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14795\/revisions"}],"predecessor-version":[{"id":14798,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14795\/revisions\/14798"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/14796"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=14795"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=14795"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=14795"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}