{"id":14741,"date":"2013-09-01T19:04:55","date_gmt":"2013-09-01T16:04:55","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=14741"},"modified":"2013-09-01T19:04:55","modified_gmt":"2013-09-01T16:04:55","slug":"elektriklerini-gunesten-uretiyorlar","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/elektriklerini-gunesten-uretiyorlar\/","title":{"rendered":"(Turkish) Elektriklerini G\u00fcne\u015ften \u00dcretiyorlar!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/14741\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kahramanmara\u015f&#8217;\u0131n Elbistan il\u00e7esinde hayvanc\u0131l\u0131k ve tar\u0131mla u\u011fra\u015fan kendi elektri\u011fini kendisi \u00fcretmek isteyen vatanda\u015flar\u0131n say\u0131s\u0131 art\u0131yor.<\/strong><\/p>\n<p>\u00d6zellikle g\u00fcne\u015f enerjisi kullan\u0131lan sistemlerden sonuncusu K\u00f6seyahya k\u00f6y\u00fcne kuruldu. K\u00f6yde bulunan dam\u0131zl\u0131k entegre k\u00fc\u00e7\u00fckba\u015f hayvan \u00e7ift\u00e7ili\u011findeki sistem sorunsuz bir \u015fekilde \u00e7al\u0131\u015f\u0131yor.<\/p>\n<p>Elbistan&#8217;\u0131n g\u00fcne\u015flenme oran\u0131 son raporlara g\u00f6re T\u00fcrkiye ortalamas\u0131n\u0131n \u00fczerinde \u00e7\u0131kt\u0131. \u0130l\u00e7edeki bir\u00e7ok noktan\u0131n y\u0131ll\u0131k g\u00fcne\u015flenme oran\u0131 bin 700 saati a\u015ft\u0131. Bu veriler, g\u00fcne\u015f enerjisinden elektrik \u00fcretmek giri\u015fimcileri de harekete ge\u00e7irdi. \u0130l\u00e7e<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/gunes-ve-ruzgar-yenilenebilir-eneri-sistemleri-sekapark-ta.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-13506\" title=\"elektriklerini-gunesten-uretiyorlar\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/gunes-ve-ruzgar-yenilenebilir-eneri-sistemleri-sekapark-ta-300x190.jpg\" alt=\"\" width=\"300\" height=\"190\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/gunes-ve-ruzgar-yenilenebilir-eneri-sistemleri-sekapark-ta-300x190.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/gunes-ve-ruzgar-yenilenebilir-eneri-sistemleri-sekapark-ta-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/gunes-ve-ruzgar-yenilenebilir-eneri-sistemleri-sekapark-ta.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>ye ba\u011fl\u0131 K\u00f6seyahya k\u00f6y\u00fcnde dam\u0131zl\u0131k k\u00fc\u00e7\u00fckba\u015f hayvan \u00fcretimi yapan Ne\u015f Tar\u0131m Hayvanc\u0131l\u0131k firmas\u0131 da g\u00fcne\u015f enerjisinden kendi elektri\u011fini \u00fcretmeye ba\u015flad\u0131. Elektri\u011fi bulunmayan k\u0131rsal b\u00f6lgeye kurulan, i\u015fletmenin ihtiya\u00e7 duydu\u011fu elektri\u011fin kar\u015f\u0131lanmas\u0131 i\u00e7in sulama kuyusuna ait pompalar, i\u015fletmeye kurulan g\u00fcne\u015f panelleri arac\u0131l\u0131\u011f\u0131yla kar\u015f\u0131lanmaya ba\u015fland\u0131.<\/p>\n<p>S\u00f6z konusu b\u00f6lgenin sorumlusu \u0130l\u00e7e G\u0131da, Tar\u0131m ve Hayvanc\u0131l\u0131k M\u00fcd\u00fcrl\u00fc\u011f\u00fc&#8217;nde g\u00f6revli Ziraat M\u00fchendisi Hakan Aranmaz, sistemin i\u015fletmenin duydu\u011fu enerji ihtiyac\u0131n\u0131 kar\u015f\u0131layabildi\u011fini s\u00f6yledi. B\u00f6lgenin yak\u0131n\u0131nda elektrik olmad\u0131\u011f\u0131 i\u00e7in giri\u015fimcinin g\u00fcne\u015f enerjisinden kendi elektri\u011fini \u00fcretme yolunu se\u00e7ti\u011fini kaydeden Aranmaz, b\u00f6ylelikle hem elektrik getirim maliyetinden hem de elektrik kulan\u0131m maliyetinden \u00f6nemli \u00f6l\u00e7\u00fcde avantaj sa\u011flanaca\u011f\u0131na i\u015faret etti.<\/p>\n<p>Ziraat M\u00fchendisi Hakan Aranmaz, ilk kurulum maliyetinin olduk\u00e7a y\u00fcksek oldu\u011funu, fakat uzun vadede sistemin \u00e7ok avantajl\u0131 olabilece\u011fini belirtti. G\u00fcne\u015f panelleri ile elde edilen elektri\u011fin hem sulama pompalar\u0131n\u0131, hem de \u00e7iftli\u011fe ait enerjinin kar\u015f\u0131lanmas\u0131nda rahatl\u0131kla yetebilece\u011fi \u00f6\u011frenildi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.energyworld.com.tr\/root.vol?title=elektriklerini-gunesten-uretiyorlar&amp;exec=page&amp;nid=569251\" target=\"_blank\">Energy World<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kahramanmara\u015f&#8217;\u0131n Elbistan il\u00e7esinde hayvanc\u0131l\u0131k ve tar\u0131mla u\u011fra\u015fan kendi elektri\u011fini kendisi \u00fcretmek isteyen vatanda\u015flar\u0131n say\u0131s\u0131 art\u0131yor. \u00d6zellikle g\u00fcne\u015f enerjisi kullan\u0131lan sistemlerden sonuncusu K\u00f6seyahya k\u00f6y\u00fcne [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":13506,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[8142,68,19,63,67,1009,165,227,13,108,6756],"views":821,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14741"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=14741"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14741\/revisions"}],"predecessor-version":[{"id":14742,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/14741\/revisions\/14742"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/13506"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=14741"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=14741"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=14741"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}